PLA-7434, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Jump to navigation Jump to search
Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations.
ML16027A111
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/27/2016
From: Franssen R
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7434, RIS-2015-05
Download: ML16027A111 (4)


Text

TALEN~

Robert J. Franssen Susquehanna Nuclear, LLC Plant Manager 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3170 Fax 570.542.1504 robert. franssen@talenenergy .com ENERGY JAN 2 7 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION REVISED RESPONSE TO NRC REGULATORY ISSUE

SUMMARY

2015-05, "PREPARATION AND SCHEDULING OF OPERA TOR LICENSING EXAMINATIONS" Docket Nos. 50-387 PLA-7434 and 50-388

Reference:

1) Letter to NRC, "PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations, " dated 7/30/2015.

(Accession Number ML15211A118)

2) NRC RJS 2015-05, "Preparation and Scheduling of Operator Licensing Examinations, "dated April 20, 2015.

The purpose of this letter is to provide a revision to Susquehanna Nuclear, LLC's initial response (Reference 1) to NRC Regulatory Information Summary (RIS) 2015-05 (Reference 2). Changes were necessary because the start date for the SSES licensed operator class was moved from 2nd quarter 2016 to 3rd quarter 2016. As a result, the proposed dates for the NRC licensing examinations have changed from 4 1h quarter 2017 to 1st quarter 2018.

If you have any questions regarding this letter, please contact Mr. Jason R. Jennings, Manager, Nuclear Regulatory Affairs, at (570) 542-3155.

This letter contains no new regulatory commitments .

./~~

R. J. Franssen

Attachment:

NRC Form 536 Copy: Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. D. E. Jackson, NRC Region I Mr. M. Shields, PA DEP/BRP Administrator, NRC Region I

Document Control Desk PLA-7434 Electronic Copy:

B. Drysdale J. R. Jennings D. Jones B. W. O'Rourke A. Seibert B. Stickler NRA Files GENPL5 DCS GENPL4

Attachment to PLA-7434 NRCForm536

U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES; 10/31/2017 EsUm<Jted burden per response lo comply with this voluntary loformaUon coloclion requost: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information colioc!lon Is used to ploo budgots 800 rosourcos lor oporalor I

I t

t examioa!lons. Send comments regarding burden estimate to tho FOIA, Privacy, and Information OPERATOR LICENSING Co!ecllons Uranch (T-5 F53), U.S. fluciear RegulctOI'( Commission, Washlnoton, DC EXAMINATION DATA 20555-0001, or by lntornol e-mail lo lnlocoKocts.Hosourco@nrc.gov, and to tho Desk Offlcor, Office of Information and IW!Julatory A/lairs, NEOB-10202, (31ti00131), Onlco of Monaoomonl and Budget, Vl'achln;Jion, DC 20503. Ha moans wed to Jmrosu an lnlorniollon collection docs nul display it curron!ly valid OMB control numbor, tho NRC rnuy not conduct or SJX>nsor, and a person l* no! roqulrod to rospo11d to, tho lnlormulion colloctlon.

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY 2019 CY 2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR OPERATORS 0 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/26/2018 11/18/2019 ALTERNATE DATE 03/05/2018 11/25/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH ESTIMATED I

NUMBER OF 14 CANDIDATES NRC FORM 636 (01-2016) f r

TALEN~

Robert J. Franssen Susquehanna Nuclear, LLC Plant Manager 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3170 Fax 570.542.1504 robert. franssen@talenenergy .com ENERGY JAN 2 7 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION REVISED RESPONSE TO NRC REGULATORY ISSUE

SUMMARY

2015-05, "PREPARATION AND SCHEDULING OF OPERA TOR LICENSING EXAMINATIONS" Docket Nos. 50-387 PLA-7434 and 50-388

Reference:

1) Letter to NRC, "PLA-7366, Response to NRC Regulatory Issue Summary 2015-05, "Preparation and Scheduling of Operator Licensing Examinations, " dated 7/30/2015.

(Accession Number ML15211A118)

2) NRC RJS 2015-05, "Preparation and Scheduling of Operator Licensing Examinations, "dated April 20, 2015.

The purpose of this letter is to provide a revision to Susquehanna Nuclear, LLC's initial response (Reference 1) to NRC Regulatory Information Summary (RIS) 2015-05 (Reference 2). Changes were necessary because the start date for the SSES licensed operator class was moved from 2nd quarter 2016 to 3rd quarter 2016. As a result, the proposed dates for the NRC licensing examinations have changed from 4 1h quarter 2017 to 1st quarter 2018.

If you have any questions regarding this letter, please contact Mr. Jason R. Jennings, Manager, Nuclear Regulatory Affairs, at (570) 542-3155.

This letter contains no new regulatory commitments .

./~~

R. J. Franssen

Attachment:

NRC Form 536 Copy: Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. D. E. Jackson, NRC Region I Mr. M. Shields, PA DEP/BRP Administrator, NRC Region I

Document Control Desk PLA-7434 Electronic Copy:

B. Drysdale J. R. Jennings D. Jones B. W. O'Rourke A. Seibert B. Stickler NRA Files GENPL5 DCS GENPL4

Attachment to PLA-7434 NRCForm536

U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES; 10/31/2017 EsUm<Jted burden per response lo comply with this voluntary loformaUon coloclion requost: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information colioc!lon Is used to ploo budgots 800 rosourcos lor oporalor I

I t

t examioa!lons. Send comments regarding burden estimate to tho FOIA, Privacy, and Information OPERATOR LICENSING Co!ecllons Uranch (T-5 F53), U.S. fluciear RegulctOI'( Commission, Washlnoton, DC EXAMINATION DATA 20555-0001, or by lntornol e-mail lo lnlocoKocts.Hosourco@nrc.gov, and to tho Desk Offlcor, Office of Information and IW!Julatory A/lairs, NEOB-10202, (31ti00131), Onlco of Monaoomonl and Budget, Vl'achln;Jion, DC 20503. Ha moans wed to Jmrosu an lnlorniollon collection docs nul display it curron!ly valid OMB control numbor, tho NRC rnuy not conduct or SJX>nsor, and a person l* no! roqulrod to rospo11d to, tho lnlormulion colloctlon.

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2017 CY2018 CY 2019 CY 2020 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2017 CY2018 CY2019 CY2020 NUMBER OF REACTOR OPERATORS 0 8 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/26/2018 11/18/2019 ALTERNATE DATE 03/05/2018 11/25/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2017 CY 2018 PROPOSED NUMBER JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER MARCH ESTIMATED I

NUMBER OF 14 CANDIDATES NRC FORM 636 (01-2016) f r