Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13365A193 | 31 December 2013 | Letter to B. L. Ivey Denial of Request for Exemption from 10 CFR 72.30 Requirements for Southern Nuclear Operating Company - (TAC Nos. L24711, L24712, and L24713) | Enforcement Discretion Decommissioning Funding Plan Exemption Request |
TAC:L24711 | 31 December 2013 | ||
ML13365A197 | 27 December 2013 | NRR E-mail Capture - FW: Farley Unit 1 Post Accident Monitoring Report | Post Accident Monitoring |
NL-13-2609, NPDES Permit Renewal | 23 December 2013 | NPDES Permit Renewal | Grab sample Biofouling |
IR 05000348/2013007 | 23 December 2013 | IR 05000348-13-007, 05000364-13-007; November 4-21, 2013; Joseph M. Farley Nuclear Plant, Units 1 and 2; Biennial Inspection of the Problem Identification and Resolution Program | Fire Watch |
ML13354B972 | 20 December 2013 | Notification of Joseph M. Farley Nuclear Plant, Units 1 and 2 Component Design Bases Inspection - NRC Inspection Report 05000348-14-007, 05000364-14-007 | Probabilistic Risk Assessment |
ML13354B775 | 20 December 2013 | Notification of Inspection and Request for Information | Ultimate heat sink Through-Wall Leak Flow Induced Vibration |
NL-13-2560, Certificate Pertaining to FOCI Information Update | 16 December 2013 | Certificate Pertaining to FOCI Information Update | |
ML13311B919 | 13 December 2013 | Joseph M. Farley Nuclear Plant, and Vogel Electric Generating Plant - Request for Use of Delta Protection Murrow Fr Supplied Air Suits and the Murrow Blue Suit Systems (TAC Mfa, Mfa, MF1853, MF1854, MF1855) | Mururoa |
NL-13-2383, Certificate Pertaining to FOCI Information Update | 27 November 2013 | Certificate Pertaining to FOCI Information Update | |
NL-13-2340, Evacuation Time Estimates Update | 26 November 2013 | Evacuation Time Estimates Update | |
NL-13-2369, Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns | 25 November 2013 | Response to NRC Request for Additional Information Associated with Near Term Task Force Recommendation 2.3, Seismic Walkdowns | |
TAC:MF0123 | 25 November 2013 | ||
NL-13-2418, Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical Report | 21 November 2013 | Edwin I. Hatch Nuclear Plant; Vogtle Electric Generating Plant - Quality Assurance Topical Report | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Commercial Grade Dedication Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program Fire Protection Program |
IR 05000348/2013403 | 18 November 2013 | IR 05000348-13-403, IR 05000364-13-403 NRC Security Insp for Joseph M. Farley Nuclear Plant | Significance Determination Process Affidavit |
ML13318A119 | 13 November 2013 | NRR E-mail Capture - FW: Farley 50.46 Annual and Change/Error Report | |
NL-13-2269, Response to Request for Additional Information Re License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants | 12 November 2013 | Response to Request for Additional Information Re License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants | Safe Shutdown Probabilistic Risk Assessment |
NL-13-2294, Cycle 26 Core Operating Limits Report Version 1 | 5 November 2013 | Cycle 26 Core Operating Limits Report Version 1 | Shutdown Margin |
ML14035A573 | 5 November 2013 | Single Positive Test Form for Pre-Access, Collected on 09/23/2013 | |
ML13308A386 | 4 November 2013 | Project Manager Reassignments | |
ML13304B418 | 1 November 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | |
NL-13-2277, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 and Significant Change/Error Report | 30 October 2013 | 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 and Significant Change/Error Report | |
NL-13-2039, Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants | 30 October 2013 | Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generating Plants | Safe Shutdown Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Thermoset Large early release frequency Cable Tray Ignition Earthquake Maintenance Rule Program Power-Operated Valves Fire Protection Program Very Early Warning Fire Detection |
ML13294A496 | 30 October 2013 | Interim Staff Evaluation and Request for Additional Information - Farley Nuclear Plant, Units 1 and 2 (Fnp) Regarding Overall Integrated Plan (OIP) for Reliable Spent Fuel Pool Instrumentation(Order Number EA-12-051) | High Radiation Area FLEX Spent Fuel Pool Instrumentation Fire Protection Program |
IR 05000348/2013004 | 29 October 2013 | IR 05000348-13-004; and 05000364-13-004; July 1, 2013, Through September 30, 2013; Joseph M. Farley Nuclear Plant, Units 1 and 2, Fire Protection, Problem Identification and Resolution | Safe Shutdown Internal Flooding Fire impairment Functionality Assessment Significance Determination Process Operability Determination Time Critical Operator Action Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
ML13249A386 | 2 October 2013 | Issuance of Amendments Regarding Technical Specifications Revisions Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report (TAC Nos. ME9256 And. | Shutdown Margin Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program |
NL-13-1936, 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B | 30 September 2013 | 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B | |
NL-13-2090, Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C | 27 September 2013 | Special Report 2013-002-00. Nonfunctional Radiation Monitor R-60C | |
ML13218B274 | 26 September 2013 | Issuance of Amendments Regarding Steam Generator Tube Inspection Program | Post Accident Monitoring Nondestructive Examination Surveillance Frequency Control Program Liquid penetrant |
NL-13-2123, Request to Obtain U. S. Army Corps of Engineers (Usace) Information Required to Provide Response to March 12, 2012 Request for Information, Recommendation 2.1 | 26 September 2013 | Request to Obtain U. S. Army Corps of Engineers (Usace) Information Required to Provide Response to March 12, 2012 Request for Information, Recommendation 2.1 | Fukushima Dai-Ichi |
ML14038A020 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Operator Manual Action Large early release frequency Fire Protection Program |
ML14038A021 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | Hot Short Safe Shutdown Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A022 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A024 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A025 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 5 of 5 | |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Operator Manual Action Large early release frequency Fire Protection Program |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | Hot Short Safe Shutdown Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14035A582 | 20 September 2013 | Single Positive Test Form for Pre-Access, Collected on 09/03/2013 | |
ML14035A585 | 20 September 2013 | Single Positive Test Form for Pre-Access, Collected on 09/04/2013 | |
ML14035A580 | 20 September 2013 | Single Positive Test Form for Pre-Access, Collected on 09/03/2013 | |
ML14035A579 | 20 September 2013 | Single Positive Test Form for Pre-Access, Collected on 09/16/2013 | |
NL-13-1769, Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits and the Mururoa Blu Suit Systems | 17 September 2013 | Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits and the Mururoa Blu Suit Systems | Mururoa |
ML14038A019 | 16 September 2013 | Joseph M. Farley, Units 1 and 2, Response to Request for Additional Information Regarding License Amendment Request for Transition to 10 CFR 50.48(c) - NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Generati | |
ML13253A366 | 10 September 2013 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Maintenance Rule Program |
ML13249A561 | 9 September 2013 | Non-Proprietary LTR Re. Draft Transmittal of Draft SE for Proposed Amend. Re. TS Revisions Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
ML13253A411 | 5 September 2013 | Joseph M Farley Nuclear Generating Station NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report No. 05000348-13404 and 05000364-13-404 - OUO Removed | Enforcement Discretion Cyber Security |
IR 05000348/2013404 | 5 September 2013 | Joseph M Farley Nuclear Generating Station NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7 Inspection Report No. 05000348-13404 and 05000364-13-404 - OUO Removed | Enforcement Discretion Cyber Security Affidavit |