 Issue dateTitleTopic
PMNS20230777, Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Wolf Creek Generating Station27 June 2023Meeting to Discuss the Nuclear Regulatory Commissions (NRC) 2022 Annual Assessment of Safety Performance at Wolf Creek Generating Station
ML23167A00426 June 2023Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection FrequencyIncorporated by reference
IR 05000482/202340121 June 2023Security Baseline Inspection Report 05000482/2023401Fitness for Duty
ML23171B13120 June 2023Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube InspectionsHigh Radiation Area
Nondestructive Examination
ML23166A06215 June 2023NRR E-mail Capture - Acceptance Review - Wolf Creek Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded post-tensioning System Components
ML23151A41631 May 2023Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS)
ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components17 May 2023CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components
WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations17 May 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
ML23132A15312 May 2023Transmittal of 2022 Annual Financial Reports
WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)10 May 2023Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
ML23135A1828 May 20236 to Updated Safety Analysis Report, Chapter 16, Relocated Technical SpecificationsIncorporated by reference
ML23135A1778 May 20236 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Incorporated by reference
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Pressure Boundary Leakage
ML23135A1788 May 20236 to Updated Safety Analysis Report, Chapter 12, Radiation ProtectionSafe Shutdown
Boric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Coatings
Incorporated by reference
Fuel cladding
Pressure Boundary Leakage
Scaffolding
ML23135A1798 May 20236 to Updated Safety Analysis Report, Chapter 13, Conduct of OperationsOffsite Dose Calculation Manual
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Incorporated by reference
Job Performance Measure
Process Control Program
Safeguards Contingency Plan
License Renewal
Exemption Request
Fire Protection Program
Scaffolding
Grace period
ML23135A1808 May 20236 to Updated Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Hydrostatic
Temporary Modification
Emergency Lighting
ML23135A1818 May 20236 to Updated Safety Analysis Report, Chapter 15, Accident Analysis
ML23135A1878 May 2023Report M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Barrier ConfigurationsSafe Shutdown
Fire Barrier
Coatings
Fire Protection Program
ML23135A1838 May 20236 to Updated Safety Analysis Report, Chapter 17, Quality AssuranceIncorporated by reference
ML23135A1848 May 20236 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
Aging Management
Pressure and Temperature Limits Report
License Renewal
Control of Heavy Loads
Fuel cladding
Biofouling
Fire Protection Program
ML23135A1858 May 20236 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Coatings
Emergency Lighting
Earthquake
Turbine Missile
Fire Protection Program
ML23135A1868 May 20236 to Updated Safety Analysis Report, List of Effective Pages (Loep)
ML23135A1958 May 2023Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A1768 May 20236 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Incorporated by reference
Tornado Missile Protection
Fast acting solenoid valve
Earthquake
Power-Operated Valves
Turbine Missile
ML23135A1758 May 20236 to Updated Safety Analysis Report, Chapter 9, Auxiliary SystemsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Loop seal
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Finite Element Analysis
B.5.b
Tornado Generated Missile
Tornado Missile Protection
Design basis earthquake
Excess Flow Check Valve
Frazil ice
Earthquake
Power-Operated Valves
Fuel cladding
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Early Warning Fire Detection
Scaffolding
Grace period
Power change
Exit Sign
ML23135A1748 May 20236 to Updated Safety Analysis Report, Chapter 8, Electric PowerHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Anticipated operational occurrence
Temporary Modification
Emergency Lighting
Incorporated by reference
Open Phase Condition
ML23135A1738 May 20236 to Updated Safety Analysis Report, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Met Tower
Temporary Modification
Incorporated by reference
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML23135A1718 May 20236 to Updated Safety Analysis Report, Chapter 6, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Missile Protection
Thermoset
Frazil ice
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
GOTHIC
ML23135A1708 May 20236 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsBoric Acid
Loop seal
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Stress corrosion cracking
Eddy Current Testing
License Renewal
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
Unidentified leakage
Overspeed trip
Water hammer
ML23135A1698 May 20236 to Updated Safety Analysis Report, Chapter 4, Reactor
ML23135A1688 May 20236 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23135A1678 May 20236 to Updated Safety Analysis Report, Figures
ML23135A1668 May 20236 to Updated Safety Analysis Report, Chapter 2, Site CharacteristicsSafe Shutdown
High winds
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Incorporated by reference
Frazil ice
Earthquake
ML23135A1658 May 20236 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
Safeguards Contingency Plan
Earthquake
Fuel cladding
Fire Protection Program
Overexposure
ML23135A2028 May 2023Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A1268 May 20236 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted
ML23135A1278 May 20236 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted
ML23135A1288 May 20236 to Updated Safety Analysis Report, Chapter 18, Figures
ML23135A1248 May 20236 to Updated Safety Analysis Report, Chapter 5, Figures
ML23135A1258 May 20236 to Updated Safety Analysis Report, Chapter 2, Figures
ML23135A1178 May 2023Redacted Version of Revision 36 to Updated Safety Analysis ReportFire Barrier
Incorporated by reference
ML23135A1188 May 20236 to Updated Safety Analysis Report, Chapter 6, Figures
WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis8 May 2023Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A2068 May 2023Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Cyber Security
ML23135A2058 May 2023Quality Program Manual, Wcqpm, Rev 13Safe Shutdown
Non-Destructive Examination
Offsite Dose Calculation Manual
Hydrostatic
Coatings
Nondestructive Examination
Temporary Modification
Cyber Security
Condition Adverse to Quality
Process Control Program
Maintenance Rule Program
Fire Protection Program
Grace period
ML23135A2038 May 2023Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) AnalysisHot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Pressure Boundary Leakage
Fire Protection Program
Backfit
ML23135A1888 May 2023Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations, Attachments C to G3CSafe Shutdown
Boric Acid
Fire Barrier
Coatings
Fire Protection Program
ML23135A2008 May 2023Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
ML23135A1998 May 2023Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual ActionsSafe Shutdown
Boric Acid
High Radiation Area
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operator Manual Action
Emergency Lighting
Earthquake
Fire Protection Program
Early Warning Fire Detection
ML23135A1988 May 2023Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown
Emergency Lighting
ML23135A1978 May 2023Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) AnalysisSafe Shutdown