RBG-46925, License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements | 29 June 2009 | License Amendment Request, Technical Specification Change to Revise ASME Code Reference for Inservice Test Requirements | Incorporated by reference |
ML091820757 | 29 June 2009 | Non-Disclosure Agreement for a Computer Code of the United States Nuclear Regulatory Commission | |
ML091540570 | 24 June 2009 | Issuance of Amendment No. 163, Revise Technical Specification 3.7.5, Main Turbine Bypass System | Anticipated operational occurrence Feedwater Controller Failure |
ML091751062 | 24 June 2009 | Acceptance Review Email, Relief Request Nos. RBS-ISI-007, -008, -009, -010,and -011, Volumetric and Visual Exams, for Second 10-year Inservice Inspection Interval | |
RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements | 22 June 2009 | Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements | |
ML091540293 | 18 June 2009 | Entergy Gulf States Louisiana, Llc'S Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) | |
TAC:ME0562 | 18 June 2009 | | |
TAC:ME1508 | 16 June 2009 | | |
RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 | 16 June 2009 | Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 | Safe Shutdown Mission time Weld Overlay Internal Flooding Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Scaffolding |
RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval | 16 June 2009 | Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval | High Radiation Area Dissimilar Metal Weld Scaffolding |
TAC:ME1466 | 29 May 2009 | | |
RBG-46916, Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval | 29 May 2009 | Requests for Relief from ASME Section XI Volumetric and Visual - Examination Requirements - Second 10-Year Interval | VT-2 |
TAC:ME1198 | 12 May 2009 | | |
ML091320059 | 12 May 2009 | Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) | |
IR 05000458/2009002 | 8 May 2009 | IR 05000458-09-002, on 01/01/2009 - 03/31/2009, River Bend Station | Safe Shutdown Unanalyzed Condition High winds Stroke time Internal Flooding Probabilistic Risk Assessment Tornado-Generated Missile Significance Determination Process Large early release frequency Biofouling Fire Protection Program Incremental Core Damage Probability Deficit Power change Siren |
RBG-46912, Submittal of Radiological Environmental Operating Report for 2008 | 30 April 2009 | Submittal of Radiological Environmental Operating Report for 2008 | Grab sample Annual Radiological Environmental Operating Report Chernobyl |
RBG-46911, Radioactive Effluent Release Report for 2008 | 30 April 2009 | Radioactive Effluent Release Report for 2008 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Annual Radiological Effluent Release Report Maintenance Rule Program Fire Protection Program Tritium |
RBG-46909, License Amendment Request, Main Turbine Bypass System | 29 April 2009 | License Amendment Request, Main Turbine Bypass System | |
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | 27 April 2009 | Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions | Safe Shutdown Fitness for Duty |
IR 05000458/2009006 | 20 April 2009 | IR 05000458-09-006; on 02/09/09 - 03/30/09; River Bend Station; Radiation Monitoring Instrumentation and Protective Equipment | High Radiation Area Offsite Dose Calculation Manual Condition Adverse to Quality Significance Determination Process Annual Radiological Effluent Release Report |
RBG-46901, Responses to Request for Additional Information (RAI) for Main Turbine Bypass System License Amendment Request | 14 April 2009 | Responses to Request for Additional Information (RAI) for Main Turbine Bypass System License Amendment Request | Feedwater Controller Failure |
CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | 13 April 2009 | Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G | Safe Shutdown Non-Destructive Examination Coatings Temporary Modification Process Control Program Fire Protection Program Grace period |
NEI 03-01, Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter | 8 April 2009 | Supplemental Information for Submittal of Revision 4 to the Security Plan, Training & Qualification Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 - Cover Letter | |
Press Release-IV-09-011, NRC Schedules Open House to Discuss the 2008 Performance of River Bend Nuclear Station | 6 April 2009 | Press Release-IV-09-011: NRC Schedules Open House to Discuss the 2008 Performance of River Bend Nuclear Station | Open House |
ML090960395 | 6 April 2009 | Notice of Public Meeting to Discuss the Annual Assessment of River Bend Station | |
RBG-46896, Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 | 1 April 2009 | Submittal of Revision 4 to the Security Plan, T&Q Plan and Safeguards Contingency Plan Updating NEI 03-01 Compliance from Revision 1 to Revision 2 | |