Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09180045329 June 2009Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development WorkshopLicense Renewal
BSEP 09-0066, Cycle 19 Startup Report25 June 2009Cycle 19 Startup ReportShutdown Margin
IR 05000324/200900619 June 2009IR 05000325-09-006, 05000324-09-006; 04/20/2009 - 05/08/2009; Brunswick Steam Electric Plant, Units 1 and 2; Biennial Inspection of the Identification and Resolution of ProblemsOperability Determination
ML09170051119 June 2009Letter to R Messick - Port Letter
IR 05000325/200900917 June 2009IR 05000325, 324/2009-009; on 9/2008-5/22/2009; Brunswick Steam Electric Plant; Units 1 & 2; Other Activities and Preliminary White FindingSafe Shutdown
Significance Determination Process
Preliminary White Finding
ML0915905865 June 2009Summary of Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324B.5.b
License Renewal
ML0917004113 June 2009No Port Southport Nc, Inc., Letter Regarding Residents Concern of Safety and Security Equilibrium on Large Marine Container Terminal to Place at Brunswick Nuclear Plant
ML09149031429 May 2009Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the CompanyLicense Renewal
Power change
Press Release-II-09-032, NRC Schedules Meeting to Discuss 2008 Performance of Brunswick Nuclear Power Plant27 May 2009Press Release-II-09-032: NRC Schedules Meeting to Discuss 2008 Performance of Brunswick Nuclear Power PlantOpen House
BSEP 09-0049, Radiological Environmental Operating Report for 200813 May 2009Radiological Environmental Operating Report for 2008Grab sample
Offsite Dose Calculation Manual
Missed surveillance
Annual Radiological Environmental Operating Report
TAC:ME12498 May 2009
BSEP 09-0043, Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection Program8 May 2009Submittal of Proposed Alternative for the Third 10-Year Inservice Inspection ProgramVT-2
ML0912708617 May 2009Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the CompanyLicense Renewal
ML0912708407 May 2009Notice of Meeting with Carolina Power and Light to Discuss the NRC Reactor Oversight Process Annual Assessment of Brunswick Steam Electric Plant Units 1 and 2Open House
License Renewal
ML1019402201 May 2009Status of Tritium Contamination
IR 05000324/200900230 April 2009IR 05000325-09-002, 05000324-09-002, & 07200006-09-001; Carolina Power and Light; 01/01/2009 - 03/31/2009; Brunswick Steam Electric Plant, Units 1 & 2, Brunswick Independent Spent Fuel Storage Installation, NRC Integrating Inspection ReportReactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Water Inventory Control
Internal Flooding
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Eddy Current Testing
EVT-1
Fire Protection Program
Scaffolding
Power change
TAC:ME114327 April 2009
BSEP 09-0024, Proposed Alternative for the Third 10-Year Inservice Inspection Program27 April 2009Proposed Alternative for the Third 10-Year Inservice Inspection ProgramNondestructive Examination
VT-2
Incorporated by reference
BSEP 09-0044, Annual Report of Results of Individual Monitoring for 200827 April 2009Annual Report of Results of Individual Monitoring for 2008
BSEP 09-0045, Submittal of Radioactive Effluent Release Report for 200827 April 2009Submittal of Radioactive Effluent Release Report for 2008Time of Discovery
Loop seal
Grab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML09113061724 April 2009Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards ConsiderationsSafe Shutdown
Fitness for Duty
Shutdown Margin
Post Accident Monitoring
RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums23 April 2009Submittal of Evidence of Guarantee of Payment of Deferred PremiumsAffidavit
BSEP 09-0039, Revision to Plant Security Event Procedure13 April 2009Revision to Plant Security Event Procedure
ML09055005513 April 2009License Amendment, Issuance of Amendments No. 252 & 280 Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control (TAC ME0168 & ME0169)Safe Shutdown
High Radiation Area
Safeguards Contingency Plan
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
BSEP 09-0037, Extension of Requested Implementation for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control2 April 2009Extension of Requested Implementation for License Amendment - Adoption of TSTF-478, Revision 2 - BWR Technical Specification Changes That Implement Revised Rule for Combustible Gas Control
ML0909702471 April 2009Submittal of Cycle 19 Core Operating Limits ReportSafety Limit Minimum Critical Power Ratio
Exclusive Use
Affidavit