BSEP 09-0039, Revision to Plant Security Event Procedure

From kanterella
Jump to navigation Jump to search
Revision to Plant Security Event Procedure
ML091140399
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 04/13/2009
From: Mentel P
Progress Energy Carolinas, Progress Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 09-0039
Download: ML091140399 (3)


Text

Progress Energy APR 13 2009 SERIAL: BSEP 09-0039 10 CFR 50, Appendix E, Section V 10 CFR 50.4(b)(5)(iii)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324/License Nos. DPR-71 and DPR-62 Revision to Plant Security Event Procedure Ladies and Gentlemen:

In accordance with 10 CFR 50.4(b)(5)(iii), 10 CFR 50, Appendix E, Section V, and

.NRC Regulatory Issue Summary 2004-15, Supplement 1, "Emergency Preparedness Issues: Post'9/1 1," dated May 25, 2006, Carolina Power & Light Company, now doing business as Progress Energy Carolinas, Inc., is submitting revisions to Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Abnormal Operating Procedure OAOP-40.0, "Security Events." A list of the revisions is provided as Enclosure 1. A summary of the revisions is provided as Enclosure 2. Enclosure 3 contains a copy of the revised procedure.

Enclosures 2 and 3 contain information that has been deemed sensitive to BSEP's physical protection. Therefore, CP&L requests that Enclosures 2 and 3 be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).

There are no regulatory commitments being made in this submittal. Please refer any questions regarding this submittal to Mr. Kent Crocker, Supervisor - Emergency Preparedness, at (910) 457-3165.

Sincerely, Phyllis Mentel Manager - Support Services Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.

Brunswick Nuclear Plant P Box O 10429 Southport, NC2B461 c

Document Control Desk BSEP 09-0039 / Page 2 JMK/jmk

Enclosures:

1. List of Revisions to Plant Abnormal Operating Procedure
2. Summary of Revisions (Security-Related Information Withhold Under 10 CFR 2.390)
3. Copy of Revised Procedure (Security-Related Information Withhold Under 10 CFR 2.390) cc (with enclosures):

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Luis A. Reyes, Regional Administrator Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, GA 30303-8931 U. S. Nuclear Regulatory Commission ATTN: Mr. Philip B. O'Bryan, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 U. S. Nuclear Regulatory Commission ATTN: Mrs. Farideh E. Saba (Mail Stop OWFN 8G9A) 11555 Rockville Pike Rockville, MD 20852-2738

BSEP 09-0039 Enclosure 1 Page 1 of 1 List of Revisions to Plant Abnormal Onerating Procedure Document Revision Effective Date Title OAOP-40.0 19 03/30/2009 Security Events OAOP-40.0 20 04/03/2009 Security Events