Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1988-07 | 7 April 1988 | NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants. | Miraglia F Office of Nuclear Reactor Regulation | |
IR 05000254/1988012 | 28 June 1988 | Insp Repts 50-254/88-12 & 50-265/88-06 on 880310-0411-12,18, 21,26-29 & 05-10,17-18 & 0601 & 20.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Programs 73051,Procedures 73052 & Observation of Work | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Ward D | |
ML20151G272 | 14 July 1988 | Forwards Listed Documents Re Spring 1988 Insp of IGSCC, Including Design Rept for Recirculation & RWCU Sys.. | Exelon Johnson I | Murley T Office of Nuclear Reactor Regulation |
ML20248B891 | 6 June 1989 | Safety Evaluation Concluding That IGSCC Insp Scope for Class 1 Piping Meets NRC Requirements & Guidelines of Generic Ltr 84-11 | Office of Nuclear Reactor Regulation | |
ML20248B879 | 6 June 1989 | Forwards Safety Evaluation Concluding That Insps,Repairs & Mitigations Performed During Reload 9/Cycle 10 Outage Met Guidelines of Generic Ltr 84-11.Util Should Incorporate Weld Repairs & Exams in Unit Igssc Insp Plan | Office of Nuclear Reactor Regulation Ross T | Exelon Kovach T |
ML20244C422 | 9 June 1989 | Forwards Insp Plan for Piping Susceptible to Igscc,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All 105 Category C Weldments Will Be Ultrasonically Inspected During Outage | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation |
ML20245E801 | 13 July 1989 | Applicability of Pipelocks as Remedy for IGSCC in Bwrs | Exelon Abel J Gilman J ELECTRIC POWER RESEARCH INSTITUTE Strait M | |
ML20247G140 | 21 July 1989 | Forwards Response to NRC 890125 Request for Addl Info Re Generic Ltr 88-01 Re IGSCC in Stainless Steel Piping for Bwrs.Insp Requirements Will Begin to Be Implemented During Next Refueling Outages in Sept 1989 & Feb 1990 | Exelon Richter M | Office of Information Resources Management |
ML20246F622 | 23 August 1989 | Concludes That Proposed Insp Plan,W/Exception of Weld 02M-S3,meets Guidelines of Generic Ltr 88-01 & Acceptable. NRC Recommends That Util Ultrasonically Examine Weld 02M-S3 | Office of Nuclear Reactor Regulation Ross T | Exelon Kovach T |
ML20248J238 | 3 October 1989 | Forwards Safety Evaluation Accepting Util Insp,Repairs & Mitigation of Welds Susceptible to IGSCC Performed During Spring 1988 Refueling Outage for Unit 2 | Office of Nuclear Reactor Regulation Ross T | Exelon Kovach T |
NRC Generic Letter 1989-21 | 19 October 1989 | NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements | Partlow J Office of Nuclear Reactor Regulation | |
ML19325F035 | 7 November 1989 | Forwards Plan Addressing Implementation of Insp for Piping Susceptible to IGSCC for Winter 1989 Refueling Outage. Augmented Leakage Monitoring Program Will Continue,Per NUREG-0313,Rev 2 | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation |
ML19332D053 | 15 November 1989 | Proposed Tech Specs Re post-accident Monitoring Instrumentation Requirements,Primary Containment Isolation Valves & Primary Containment Leakage Test Penetrations | Exelon | |
ML19332D171 | 17 November 1989 | Forwards Preliminary Rept of IGSCC Insp Results.No Growth or New IGSCC-like Flow Indications Identified,Flaw Indication on Weld 02G-S4 Removed & Repaired & Indications on Welds 02D-S3 & 02C-S3 Found Acceptable for Continued Operation | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation |
ML19332G265 | 11 December 1989 | Proposed Tech Specs Re Primary Containment Isolation & Primary Containment Leakage Test Penetrations | Exelon | |
ML20064A478 | 28 February 1990 | Revised Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Concerning Quad Cities Station, Unit 2 | INC. Bates R Lakner A VIKING INDUSTRIES | NRC |
ML20064A463 | 28 February 1990 | Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Concerning Quad Cities Station,Unit 1 | INC. Bates R Lakner A VIKING INDUSTRIES | NRC |
NRC Generic Letter 1990-04 | 25 April 1990 | NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective Actions | Partlow J Office of Nuclear Reactor Regulation | |
ML20042F122 | 1 May 1990 | Forwards Preliminary Rept of IGSCC Insp Results.Flaw Indication Detected in Weld Overlay Matl of Weld 02J-S3 & Removed by Boat Sample & Std Weld Overlay Thickness Restored.Final Rept Will Be Forwarded within 30 Days | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation |
NRC Generic Letter 1990-05 | 15 June 1990 | NRC Generic Letter 1990-005: Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping | Partlow J Office of Nuclear Reactor Regulation | |
ML20058M829 | 31 July 1990 | Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements of Corrective Actions. Status of Implementation of Generic Safety Issues Encl | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation |
ML20058M822 | 7 August 1990 | Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions | Exelon Stols R | Murley T Office of Nuclear Reactor Regulation Office of Information Resources Management |
ML20058C424 | 19 October 1990 | Responds to NRC 900821 SER Re Inservice Insp Program for RWCU Sys,Per Generic Ltr 88-01 | Exelon Richter M | Murley T Office of Nuclear Reactor Regulation |
ML20077A698 | 29 April 1991 | Responds to NRC SER for Generic Ltr 88-01 Re NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.Rwcu Piping Replacement Scheduled Over Two Refueling Outage Periods | Exelon Richter M | Murley T Office of Nuclear Reactor Regulation Office of Information Resources Management |
ML20099D779 | 29 July 1992 | Proposed Tech Specs Sections 1.0, Definitions, 3/4.0, Applicability & 3/4.3, Reactivity | Exelon | |
ML20056C238 | 30 April 1993 | Forwards Response to Request for NRC Approval of non-code Repair for Recirculation Sys Pipe Flaw in 12-inch Recirculation Sys Riser,Per Guidance Delineated in Rev 2 to NUREG-0313 | Exelon Schrage J | Murley T Office of Nuclear Reactor Regulation Office of Information Resources Management |
ML20056C458 | 17 June 1993 | Forwards SE Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of Operation | Chandu Patel Office of Nuclear Reactor Regulation | Exelon Farrar D |
ML20056C460 | 17 June 1993 | Safety Evaluation Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of Operation | Office of Nuclear Reactor Regulation | |
ML20058L271 | 8 December 1993 | Safety Evaluation Finding Overlay Repair of Weld 02C-F7 Acceptable & in Conformance W/Gl 88-01.Plant May Be Returned to Safe Operation | Office of Nuclear Reactor Regulation | |
ML20058L268 | 8 December 1993 | Forwards Safety Evaluation Re Requested Approval of Licensee Repair of Weld 02C-F7 in Piping of Recirculation Sys,Per Guidance of GL 88-01 | Chandu Patel Office of Nuclear Reactor Regulation | Exelon Farrar D |
ML20067C792 | 22 February 1994 | Submits Rev to Proposed Replacement Actions Presented 930820.Rev Proposes to Replace IGSCC Susceptible Outboard Supply & Return Piping & Regenerative Heat Exchangers on Units 1 & 2 | Exelon Schrage J | Russell W Office of Nuclear Reactor Regulation Office of Information Resources Management |
ML20070C062 | 17 June 1994 | Informs That in Response to NRC 940617 Telcon Request,Util Will Revise UFSAR to Reflect Schedular Commitment Stated in Which Obligates Util to Implementation of Units 1 & 2 Replacement Activities During Listed Outages | Exelon Schrage J | Russell W Office of Nuclear Reactor Regulation Office of Information Resources Management |
L-95-004, TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 2 | 30 June 1995 | TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 2 | IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY Beth Brown | NRC |
ML20101Q036 | 11 March 1996 | Flaw Evaluation for 02AD-F12 Weld in Quad Cities Unit 1 Loop a Recirculation Sys | Exelon Deboo G | |
ML20101H138 | 25 March 1996 | Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup Project | Exelon | |
ML20101Q012 | 4 April 1996 | Provides Assessment of Indications Detected in IGSCC Susceptible Stainless Steel Weldments in Reactor Recirculation Piping Sys & Transmits Weld Overlay Repair Designs & Flawed Pipe Evaluations,Per GL 88-01 & Suppl 1 | Exelon Kraft E | Office of Information Resources Management |
ML20117E873 | 15 May 1996 | Submits Results of Plant Short Term Performance Upgrade Activities Described in Ltr | Exelon Kraft E | NRC (Affiliation Not Assigned) Office of Information Resources Management |
ML20135B319 | 25 November 1996 | ISI Post Outage (90 Day) Summary Rept | Exelon Cook D Peterson C Conner C | |
ML20134H221 | 6 February 1997 | Forwards Response to NRC Request for Info Re Adequacy & Availability of Design Info,Per 10CFR50.54(f). Bases Info | Exelon Kraft E Maiman T | Office of Information Resources Management |
ML20211A596 | 19 September 1997 | ISI Post-Outage (90-Day) Summary Rept 970301-0622 | Exelon | |
ML20198T282 | 10 November 1997 | Forwards Insp Repts 50-254/97-18 & 50-265/97-18 on 970922-25 & Notice of Violation.Violation Identified for Lack of Corrective Action After Identifying Substantial Recirculation Piping Cracks in 1996 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Grobe J | Exelon Pearce L |
SVP-97-265, Informs NRC of Util'S Plans to Address Concerns Re IHSI Process Discussed in Ser,Dtd 960510.Number of GL 88-01 Category C Welds Were Found to Be Flawed W/Igscc.List of Subject Welds to Be Inspected IAW Category D Schedule,Encl | 20 November 1997 | Informs NRC of Util'S Plans to Address Concerns Re IHSI Process Discussed in Ser,Dtd 960510.Number of GL 88-01 Category C Welds Were Found to Be Flawed W/Igscc.List of Subject Welds to Be Inspected IAW Category D Schedule,Encl | Exelon Pearce L | Office of Information Resources Management |
ML20203D026 | 10 December 1997 | Responds to NRC Ltr Re Violations Noted in Insp Repts 50-254/97-18 & 50-265/97-18.Corrective Actions:Inservice Insp Admin Procedure Qctp 0410-01 Will Be Revised | Exelon Pearce L | Office of Information Resources Management |
ML20197E917 | 18 December 1997 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/97-18 & 50-265/97-18 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) Grobe J | Exelon Pearce L |
SVP-98-353, Forwards Licensee Assessment of Flaw Indications Found in IGSCC Susceptible Welds in Plant Primary Sys Piping,Summary of Weld Overlay Repair Designs & Detailed Evaluations for Flaw Indications That Util Proposes to Leave as-is | 24 November 1998 | Forwards Licensee Assessment of Flaw Indications Found in IGSCC Susceptible Welds in Plant Primary Sys Piping,Summary of Weld Overlay Repair Designs & Detailed Evaluations for Flaw Indications That Util Proposes to Leave as-is | Exelon Dimmette J | Office of Information Resources Management |
ML20196C839 | 30 November 1998 | Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1 | Caine T GENERAL ELECTRIC CO. Mehta H Horn R | |
ML20196F522 | 2 December 1998 | Informs That NRC Finds Util Assessment of Two Old & One New Flaw Indications on Recirculation Sys Piping Acceptable.Nrc Agrees with Assessment That Plant Can Be Safely Operated for Next Operating Cycle of 24 Months with Indications Present | NRC (Affiliation Not Assigned) Pulsifer R | Exelon Kingsley O |
SVP-98-376, Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings | 26 January 1999 | Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings | Exelon Dimmette J | Office of Information Resources Management |
ML20207D234 | 1 March 1999 | Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205 | Exelon | |
IR 05000254/1998021 | 5 March 1999 | Insp Repts 50-254/98-21 & 50-265/98-21 on 981112-1218. Violation Noted:Major Areas Inspected:Isi Activities at Plant During Refueling Outage 15 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |