Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
IR 05000254/198801228 June 1988Insp Repts 50-254/88-12 & 50-265/88-06 on 880310-0411-12,18, 21,26-29 & 05-10,17-18 & 0601 & 20.No Violations Noted.Major Areas Inspected:Inservice Insp Activities,Including Review of Programs 73051,Procedures 73052 & Observation of WorkNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Ward D
ML20151G27214 July 1988Forwards Listed Documents Re Spring 1988 Insp of IGSCC, Including Design Rept for Recirculation & RWCU Sys..Exelon
Johnson I
Murley T
Office of Nuclear Reactor Regulation
ML20248B8916 June 1989Safety Evaluation Concluding That IGSCC Insp Scope for Class 1 Piping Meets NRC Requirements & Guidelines of Generic Ltr 84-11Office of Nuclear Reactor Regulation
ML20248B8796 June 1989Forwards Safety Evaluation Concluding That Insps,Repairs & Mitigations Performed During Reload 9/Cycle 10 Outage Met Guidelines of Generic Ltr 84-11.Util Should Incorporate Weld Repairs & Exams in Unit Igssc Insp PlanOffice of Nuclear Reactor Regulation
Ross T
Exelon
Kovach T
ML20244C4229 June 1989Forwards Insp Plan for Piping Susceptible to Igscc,In Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All 105 Category C Weldments Will Be Ultrasonically Inspected During OutageExelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
ML20245E80113 July 1989Applicability of Pipelocks as Remedy for IGSCC in BwrsExelon
Abel J
Gilman J
ELECTRIC POWER RESEARCH INSTITUTE
Strait M
ML20247G14021 July 1989Forwards Response to NRC 890125 Request for Addl Info Re Generic Ltr 88-01 Re IGSCC in Stainless Steel Piping for Bwrs.Insp Requirements Will Begin to Be Implemented During Next Refueling Outages in Sept 1989 & Feb 1990Exelon
Richter M
Office of Information Resources Management
ML20246F62223 August 1989Concludes That Proposed Insp Plan,W/Exception of Weld 02M-S3,meets Guidelines of Generic Ltr 88-01 & Acceptable. NRC Recommends That Util Ultrasonically Examine Weld 02M-S3Office of Nuclear Reactor Regulation
Ross T
Exelon
Kovach T
ML20248J2383 October 1989Forwards Safety Evaluation Accepting Util Insp,Repairs & Mitigation of Welds Susceptible to IGSCC Performed During Spring 1988 Refueling Outage for Unit 2Office of Nuclear Reactor Regulation
Ross T
Exelon
Kovach T
NRC Generic Letter 1989-2119 October 1989NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) RequirementsPartlow J
Office of Nuclear Reactor Regulation
ML19325F0357 November 1989Forwards Plan Addressing Implementation of Insp for Piping Susceptible to IGSCC for Winter 1989 Refueling Outage. Augmented Leakage Monitoring Program Will Continue,Per NUREG-0313,Rev 2Exelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
ML19332D05315 November 1989Proposed Tech Specs Re post-accident Monitoring Instrumentation Requirements,Primary Containment Isolation Valves & Primary Containment Leakage Test PenetrationsExelon
ML19332D17117 November 1989Forwards Preliminary Rept of IGSCC Insp Results.No Growth or New IGSCC-like Flow Indications Identified,Flaw Indication on Weld 02G-S4 Removed & Repaired & Indications on Welds 02D-S3 & 02C-S3 Found Acceptable for Continued OperationExelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
ML19332G26511 December 1989Proposed Tech Specs Re Primary Containment Isolation & Primary Containment Leakage Test PenetrationsExelon
ML20064A47828 February 1990Revised Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Concerning Quad Cities Station, Unit 2INC.
Bates R
Lakner A
VIKING INDUSTRIES
NRC
ML20064A46328 February 1990Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Concerning Quad Cities Station,Unit 1INC.
Bates R
Lakner A
VIKING INDUSTRIES
NRC
NRC Generic Letter 1990-0425 April 1990NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective ActionsPartlow J
Office of Nuclear Reactor Regulation
ML20042F1221 May 1990Forwards Preliminary Rept of IGSCC Insp Results.Flaw Indication Detected in Weld Overlay Matl of Weld 02J-S3 & Removed by Boat Sample & Std Weld Overlay Thickness Restored.Final Rept Will Be Forwarded within 30 DaysExelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
NRC Generic Letter 1990-0515 June 1990NRC Generic Letter 1990-005: Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 PipingPartlow J
Office of Nuclear Reactor Regulation
ML20058M82931 July 1990Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements of Corrective Actions. Status of Implementation of Generic Safety Issues EnclExelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
ML20058M8227 August 1990Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective ActionsExelon
Stols R
Murley T
Office of Nuclear Reactor Regulation
Office of Information Resources Management
ML20058C42419 October 1990Responds to NRC 900821 SER Re Inservice Insp Program for RWCU Sys,Per Generic Ltr 88-01Exelon
Richter M
Murley T
Office of Nuclear Reactor Regulation
ML20077A69829 April 1991Responds to NRC SER for Generic Ltr 88-01 Re NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping.Rwcu Piping Replacement Scheduled Over Two Refueling Outage PeriodsExelon
Richter M
Murley T
Office of Nuclear Reactor Regulation
Office of Information Resources Management
ML20099D77929 July 1992Proposed Tech Specs Sections 1.0, Definitions, 3/4.0, Applicability & 3/4.3, ReactivityExelon
ML20056C23830 April 1993Forwards Response to Request for NRC Approval of non-code Repair for Recirculation Sys Pipe Flaw in 12-inch Recirculation Sys Riser,Per Guidance Delineated in Rev 2 to NUREG-0313Exelon
Schrage J
Murley T
Office of Nuclear Reactor Regulation
Office of Information Resources Management
ML20056C45817 June 1993Forwards SE Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of OperationChandu Patel
Office of Nuclear Reactor Regulation
Exelon
Farrar D
ML20056C46017 June 1993Safety Evaluation Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of OperationOffice of Nuclear Reactor Regulation
ML20058L2718 December 1993Safety Evaluation Finding Overlay Repair of Weld 02C-F7 Acceptable & in Conformance W/Gl 88-01.Plant May Be Returned to Safe OperationOffice of Nuclear Reactor Regulation
ML20058L2688 December 1993Forwards Safety Evaluation Re Requested Approval of Licensee Repair of Weld 02C-F7 in Piping of Recirculation Sys,Per Guidance of GL 88-01Chandu Patel
Office of Nuclear Reactor Regulation
Exelon
Farrar D
ML20067C79222 February 1994Submits Rev to Proposed Replacement Actions Presented 930820.Rev Proposes to Replace IGSCC Susceptible Outboard Supply & Return Piping & Regenerative Heat Exchangers on Units 1 & 2Exelon
Schrage J
Russell W
Office of Nuclear Reactor Regulation
Office of Information Resources Management
ML20070C06217 June 1994Informs That in Response to NRC 940617 Telcon Request,Util Will Revise UFSAR to Reflect Schedular Commitment Stated in Which Obligates Util to Implementation of Units 1 & 2 Replacement Activities During Listed OutagesExelon
Schrage J
Russell W
Office of Nuclear Reactor Regulation
Office of Information Resources Management
L-95-004, TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 230 June 1995TER on Third 10-Yr ISI Program Plan:Commonwealth Edison Co, Quad Cities Station,Units 1 & 2IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
Beth Brown
NRC
ML20101Q03611 March 1996Flaw Evaluation for 02AD-F12 Weld in Quad Cities Unit 1 Loop a Recirculation SysExelon
Deboo G
ML20101H13825 March 1996Complete Version of TS Upgrade Program Pages That Reflect Current Configuration of Plant & Specifies SRs That Will Not Be Current Upon Implementation of Tsup ProjectExelon
ML20101Q0124 April 1996Provides Assessment of Indications Detected in IGSCC Susceptible Stainless Steel Weldments in Reactor Recirculation Piping Sys & Transmits Weld Overlay Repair Designs & Flawed Pipe Evaluations,Per GL 88-01 & Suppl 1Exelon
Kraft E
Office of Information Resources Management
ML20117E87315 May 1996Submits Results of Plant Short Term Performance Upgrade Activities Described in LtrExelon
Kraft E
NRC (Affiliation Not Assigned)
Office of Information Resources Management
ML20135B31925 November 1996ISI Post Outage (90 Day) Summary ReptExelon
Cook D
Peterson C
Conner C
ML20134H2216 February 1997Forwards Response to NRC Request for Info Re Adequacy & Availability of Design Info,Per 10CFR50.54(f). Bases InfoExelon
Kraft E
Maiman T
Office of Information Resources Management
ML20211A59619 September 1997ISI Post-Outage (90-Day) Summary Rept 970301-0622Exelon
ML20198T28210 November 1997Forwards Insp Repts 50-254/97-18 & 50-265/97-18 on 970922-25 & Notice of Violation.Violation Identified for Lack of Corrective Action After Identifying Substantial Recirculation Piping Cracks in 1996NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Grobe J
Exelon
Pearce L
SVP-97-265, Informs NRC of Util'S Plans to Address Concerns Re IHSI Process Discussed in Ser,Dtd 960510.Number of GL 88-01 Category C Welds Were Found to Be Flawed W/Igscc.List of Subject Welds to Be Inspected IAW Category D Schedule,Encl20 November 1997Informs NRC of Util'S Plans to Address Concerns Re IHSI Process Discussed in Ser,Dtd 960510.Number of GL 88-01 Category C Welds Were Found to Be Flawed W/Igscc.List of Subject Welds to Be Inspected IAW Category D Schedule,EnclExelon
Pearce L
Office of Information Resources Management
ML20203D02610 December 1997Responds to NRC Ltr Re Violations Noted in Insp Repts 50-254/97-18 & 50-265/97-18.Corrective Actions:Inservice Insp Admin Procedure Qctp 0410-01 Will Be RevisedExelon
Pearce L
Office of Information Resources Management
ML20197E91718 December 1997Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-254/97-18 & 50-265/97-18NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Grobe J
Exelon
Pearce L
SVP-98-353, Forwards Licensee Assessment of Flaw Indications Found in IGSCC Susceptible Welds in Plant Primary Sys Piping,Summary of Weld Overlay Repair Designs & Detailed Evaluations for Flaw Indications That Util Proposes to Leave as-is24 November 1998Forwards Licensee Assessment of Flaw Indications Found in IGSCC Susceptible Welds in Plant Primary Sys Piping,Summary of Weld Overlay Repair Designs & Detailed Evaluations for Flaw Indications That Util Proposes to Leave as-isExelon
Dimmette J
Office of Information Resources Management
ML20196C83930 November 1998Rev 0 to GE-NE-B13-01980-030-2, Assessment of Crack Growth Rates Applicable to Induction Heating Stress Improvement (IHSI) Recirculation Piping in Quad Cities Unit 1Caine T
GENERAL ELECTRIC CO.
Mehta H
Horn R
ML20196F5222 December 1998Informs That NRC Finds Util Assessment of Two Old & One New Flaw Indications on Recirculation Sys Piping Acceptable.Nrc Agrees with Assessment That Plant Can Be Safely Operated for Next Operating Cycle of 24 Months with Indications PresentNRC (Affiliation Not Assigned)
Pulsifer R
Exelon
Kingsley O
SVP-98-376, Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings26 January 1999Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize DrawingsExelon
Dimmette J
Office of Information Resources Management
ML20207D2341 March 1999Post Outage (90 Day) Summary Rept, for ISI Exams & Repair/Replacement Activities Conducted 981207-1205Exelon
IR 05000254/19980215 March 1999Insp Repts 50-254/98-21 & 50-265/98-21 on 981112-1218. Violation Noted:Major Areas Inspected:Isi Activities at Plant During Refueling Outage 15NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)