Text

, - -

June 17, 1993 Docket No. 50-265 DISTRIBUTION:

Docket. File NRC & Local PDRs PDIII-2 r/f-Mr. D. L. Farrar

-J.

Roe J. Zwolinski Manager, Nuclear Regulatory Services J. Dyer C. Moore

. Commonwealth Edison Company C. Patel OGC Executive Towers West III, Suite 500 ACRS (10)

8. Clayton RIII 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331) i By the letter dated April 19, 1993, as supplemented April 30, 1993,.

Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B)_ in the recirculation piping system at Quad Cities Station, Unit 2.

The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR-Austenitic Stainless Steel Piping."

Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you.

should either replace the subject weld or perform a-Code repair during the next refueling outage.

By letter dated May 24, 1993, _we informed-you about our conclusion 'and we indicated that our detailed safety evaluation would be provided under separate cover.

Sincerely, 4

Original Signed By:

Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See'next page OFC lLA:PDIII-2 jPM:PDIII-2 lD:PDIII-2 l

j.

CDP lCM00 reg jCPATEL:rc lJDYER plo j

-l NAME DATE j ( //(,/93 l 6//f/93 lC //7/93 l

l-A

)

t

  1. ",* 7 ~ 7 b

i:

9306240165 930617 l

PDR. ADOCK 0500 5

g g.

~- -

_; ( a ur

c UNITED STATES NUCLEAR REGULATORY COMMISSION e

, v.

e g' $

E WASHINGTON, D. C. 20555 June 17, 1993 Docket No. 50-265 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III, Suite 500 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331)

By the letter dated April 19, 1993, as supplemented April 30, 1993, Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B) in the recirculation piping system at Quad Cities Station, Unit 2.

The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping."

Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you should either replace the subject weld or perform a Code repair during the next refueling outage.

By letter dated May 24, 1993, we informed you about our conclusion and we indicated that our detailed safety evaluation would be provided under separate cover.

Our safety evaluation is enclosed.

Sincerely,

$wylbl4 fkh Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

4e

~.*

4

~ L,.

~

Mr. D. L. Farrar Quad Cities Nuclear Power' Station-Commonwealth Edison Company Unit Nos. I and 2 CC:

Mr.. Stephen E. Shelton Vice President 4

Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690-Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident _ Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors-1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III

.U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4-

. Glen Ellyn,- Illinois 60137 Robert Neumann-Office of Public Counsel State ofl Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 u

-_