Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML21022A200 | 22 January 2021 | COVID-19 Lessons Learned and Best Practices Presentation for 1/27 ROP Public Meeting | |
ML20247J601 | 12 November 2020 | Attachment 6 Feedback Form Adjudication | |
ML20247J599 | 12 November 2020 | Attachment 4 Basis and History | |
ML20247J602 | 12 November 2020 | Team Report for the Comprehensive Review of the Problem Identification and Resolution Inspection Program | |
ML20297A436 | 23 October 2020 | Problem Identification and Resolution Inspection Program Comprehensive Review | |
ML20052E777 | 21 February 2020 | Engineering-Inspections Info-graphic | |
ML19091A042 | 1 April 2019 | Team Charter - ROP Enhancement | |
ML19086A122 | 27 March 2019 | ROP Enhancement Presentation for 3-27-2019 Public Meeting | |
ML18177A448 | 26 June 2018 | Licensee Japan Industry Workshop for Understanding Nrc'S Reactor Oversight Process June 2018 | |
ML18177A255 | 26 June 2018 | Nea Learning Workshop for the Introduction of the Reactor Oversight Process Tokyo, Japan Workshop June 21-22 2018 | |
ML12264A105 | 15 September 2012 | Indian Point | Limited Appearance Statement of Rieko Gibbs Opposing Indian Point, Units 2 and 3 License Renewal Application |
ML12108A253 | 11 April 2012 | FitzPatrick | ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner, Rieko Gibbs |
ML091680672 | 17 June 2009 | Transmittal of Draft Revised Fuel Cycle Oversight Process Basis Document | |
ML090770014 | 26 March 2009 | Quad Cities | Request to Partially Implement Subsequent Edition of ASME Code for Operation and Maintenance of Nuclear Power Plants (OM Code), Section ISTC-522, Condition-Monitoring Program & Mandatory Appendix... |
ML090690099 | 20 March 2009 | Perry | Project Manager Reassignment |
ML090360559 | 13 February 2009 | Perry | Clarification of Intention to Adopt National Fire Protection Association 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants 2001 Edition |
ML090020085 | 7 January 2009 | Dresden Quad Cities | Project Manager Reassignment |
ML082960729 | 29 December 2008 | Perry | Request for Relief Related to Inservice Inspection Relief Request IR-054 |
ML083100284 | 16 December 2008 | Perry | Request for Relief Related to Inservice Inspection Relief Requests IR-056 and IR-057 |
ML083230102 | 25 November 2008 | Perry | Project Manager Reassignment |
ML082820171 | 25 November 2008 | Quad Cities | Relief Request No. RV-30G from Main Steam Electrometric Relief Valve 0203-3C Test Interval |
ML083020031 | 20 November 2008 | Beaver Valley Davis Besse Perry | Application to Use Weighting Factors for External Exposure |
ML082050578 | 4 September 2008 | Perry | Request to Eliminate the Volumetric Examination of a Nozzle-to-safe End Weld for the Second 10-year Inservice Inspection Interval |
ML082030218 | 22 August 2008 | Perry | Request to Eliminate Selected Volumetric Examinations of Cast Valve Body Welds for the Second 10-Year Inservice Inspection Interval |
ML081330557 | 27 June 2008 | Dresden Quad Cities | Dresden/Quad Cities Relief Requests from 5-Year Test Interval for Main Steam Safety Valves |
ML081190470 | 28 May 2008 | LaSalle | Relief Request for 13R-11 for Third Ten-Year Inservice Inspection Interval |
ML080930122 | 7 May 2008 | LaSalle | Request for Relief from ASME OM Code for the Third Inservice Testing Interval |
ML080980311 | 30 April 2008 | Dresden Peach Bottom Oyster Creek Limerick Clinton Quad Cities LaSalle | Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. |
ML080940215 | 29 April 2008 | LaSalle | RR 13R-01, Associated with the Third 10-Year Interval |
ML080370181 | 14 April 2008 | Braidwood | Relief Request RV-1 for the Third Interval Inservice Testing Program |
ML080440077 | 27 February 2008 | Byron | Inservice Inspection Program Second Interval RR 12R-21, TAC MD4097 & MD4098 |
ML080320025 | 15 February 2008 | Dresden | Project Manager Reassignment |
ML080360392 | 12 February 2008 | Byron Braidwood | Project Manager Reassignment |
ML080360296 | 12 February 2008 | Perry | Project Manager Reassignment |
ML080230600 | 7 February 2008 | Byron | Relaxation of the First Revised Order EA-03-09 |
ML073610587 | 30 January 2008 | LaSalle | Request for Relief Nos. I3R-03, I3R-04, I3R-08, I3R-09 and I3R-10: Third 10-Year Interval Inservice Inspection Program Plan |
ML073521568 | 15 January 2008 | LaSalle | Letter to C. Pardee RR 13R-05 Associated with Second Containment Inservice Inspection (Cisi) Interval |
ML073230312 | 15 January 2008 | Byron | Relief, Inservice Inspection Program Second Interval Relief Requests I2R-22, I2R-23, I2R-25, and I2R-53, |
ML073190511 | 20 December 2007 | Davis Besse | Request for Alternative RR-A30, Revision 2 to Use Proposed Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Structural Weld Overlays (Tac No. MD4452) |
ML073230183 | 14 December 2007 | Davis Besse | Request for Alternative RR-A31 for Pressurizer J-Groove Nozzle Weld Repairs (Tac No. MD5956) |
ML073340847 | 13 December 2007 | Clinton | Proposed Alternative Relief Request to Performance of System Pressure Test on Instrument Air Piping, Second Ten-Year Inservice Inspection Interval |
ML073190479 | 6 December 2007 | Clinton | Relief Request No. 2209 from 5-Year Test Requirement for Safety Valves |
ML072950144 | 27 November 2007 | Davis Besse | Request to Use Later ASME Code Edition |
ML073130052 | 20 November 2007 | Quad Cities | Relief from 5-Year Test Interval for Main Steam Safety Valves |
ML072760048 | 8 November 2007 | Braidwood | Relief Request (12R-49), Regarding Inservice Inspection Program Alternative Method |
ML072620373 | 26 September 2007 | LaSalle | Relief Request Third 10-Year Pump and Valve Inservice Testing Program (TAC Nos. MD5988, MD5989, MD5992 Through MD5995) |
ML072610510 | 25 September 2007 | Byron | Evaluation of Proposed Risk-Informed Request for an Inservice Inspection Program |
ML072630003 | 20 September 2007 | Quad Cities | Project Manager Reassignment |
ML072500149 | 20 September 2007 | Byron Braidwood | PM Reassignment Letter |
ML072350087 | 20 September 2007 | Dresden | Relief, Request for Relief from ASME OM Code 5-year Test Interval Requirements |