Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML20357B133 | 30 December 2020 | Oconee | Transmittal Memo - Delivery of Partial Deliverable Associated with the Trace Code Maintenance, Plant Model Maintenance, and Plant Model Development to Support Licensing Actions and Emergent Technical Issues User Need |
ML20272A159 | 5 October 2020 | 09/09-11/2020 Meeting Summary of the First Accident Tolerant Fuel Severe Accident Pirt Panel | |
ML20154K582 | 17 September 2020 | Periodic Review Memo | |
ML20174A418 | 22 June 2020 | ERI Peer Review of Source Term Work at Sandia National Labs | |
ML20126G376 | 13 May 2020 | Applicability of Source Term for Accident Tolerant Fuel, High Burn Up and Extended Enrichment | |
ML19270E335 | 27 November 2019 | Closeout to Rar for Independent Review of Regulatory and Technical Basis for Revising the Design-Basis Accident Fuel Handling Accident | |
ML18152B142 | 4 June 2018 | Transmittal - Final Deliverable Associated with User Need NRR-2016-009 | |
ML18071A053 | 13 March 2018 | Regulatory Information Conference (RIC) Session W23 Maximizing Efficiency and Transparency in Safety Research of Accident Tolerant Fuel | |
ML17319A532 | 24 November 2017 | Memo for Non-LWR Strategy 2 Implementation Action Plan Progress | |
ML17223A716 | 22 August 2017 | Memo - Transmittal of Preliminary, Interim Analysis of Kathy ATWS-I Experimental Data (NRR-2015-010) | |
ML17108A808 | 23 June 2017 | Byron Braidwood | OEDO-16-00783 - Closure Letter for Samuel Miranda, Citizen, Email 2.206 - Enforcement Petition Regarding Exelon'S Byron and Braidwood Stations |
ML15259A472 | 16 September 2015 | Results of Periodic Review of Regulatory Guide 8.35 | |
ML13051A035 | 31 May 2013 | Regulatory Analysis for Rg 1 68, Revision 4 | |
ML13122A008 | 22 May 2013 | Nine Mile Point Ginna | Notice of Impending Public Release of Technical Letter Report (Tlr) on Summary of Aging Management Program Effectiveness Audits to Inform Subsequent License Renewal: R.E. Ginna Nuclear Power Plant and Nine Mile Point Nuclear Station, Unit 1 |
ML12355A705 | 20 December 2012 | North Anna | G20120909/LTR-12-0713 - Seismic History and Hydraulic Fracturing (Response) |
ML12132A426 | 11 May 2012 | Perry | G20120260/LTR-12-0163/EDATS: SECY-2012-0191 - Response to Email Sylvia Watson Re Perry Nuclear Power Plant - Safety Concerns |
ML13127A368 | 13 March 2012 | North Anna | Memo from M. Case to P. Hiland, Subject: Review of Draft Nureg/Cr - Xxxx Entitled, Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Vali |
ML083360263 | 5 December 2008 | Nomination Letter for Richard Pelton to ANSI 3.1 Working Group | |
RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification | 29 October 2008 | Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification | |
RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds | 22 October 2008 | Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds | |
Information Notice 2008-17, Construction Experience with Concrete Placement Process | 22 October 2008 | Construction Experience with Concrete Placement Process | |
RIS 2008-22, Notification of Licensees Regarding Aircraft Threats | 6 October 2008 | Notification of Licensees Regarding Aircraft Threats | |
RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures. | 2 September 2008 | Issuance of LIC-109, Acceptance Review Procedures. | |
Information Notice 2008-16, Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2007 | 2 September 2008 | Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2007 | |
ML082340851 | 29 August 2008 | Kansas State University | NRC Inspection Report No. 50-188/2008-203 |
RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) | 20 August 2008 | Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02) | |
Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation | 7 July 2008 | Braidwood | Reactor Trip Due to Off-Site Power Fluctuation |
RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations | 27 June 2008 | Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations | |
RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process | 25 June 2008 | NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process | |
ML081080042 | 5 May 2008 | University of Lowell | University of Massachusetts - Lowell Research Reactor - Closure of Confirmatory Action Letter CAL No. NRR-03-009 on Site Specific Compensatory Measures Implementation Plan |
Information Notice 2008-07, Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds | 24 April 2008 | Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds | |
RIS 2005-20, Rev. 1: Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety. | 16 April 2008 | Rev. 1: Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety. | |
Information Notice 2008-05, Fires Involving Emergency Diesel Generators Exhaust Manifolds | 12 April 2008 | Fires Involving Emergency Diesel Generators Exhaust Manifolds | |
ML080950235 | 11 April 2008 | Fatigue Analysis of Nuclear Power Plant Components | |
RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) | 11 April 2008 | Vermont Yankee | Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) |
Information Notice 2008-06, Instrument Air System Failure Resulting in Manual Reactor Trip | 10 April 2008 | Instrument Air System Failure Resulting in Manual Reactor Trip | |
Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants | 7 April 2008 | Hatch Oconee Mcguire Catawba McGuire | Counterfeit Parts Supplied to Nuclear Power Plants |
Information Notice 2008-02, Findings Identified During NRC Component Design Bases Inspections | 19 March 2008 | Findings Identified During NRC Component Design Bases Inspections | |
ML080110116 | 19 March 2008 | Endorsement of Revision 1 to NEI 06-04, Nuclear Energy Institute: Conducting a Hostile Action Based Emergency Response Drill | |
RIS 2008-06, Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles | 6 March 2008 | Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles | |
RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process | 28 February 2008 | Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process | |
RIS 2008-05, Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal | 27 February 2008 | Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal | |
ML080420435 | 25 February 2008 | Fermi | Response to Fermi Power Plant, Unit 2 - Task Interface Agreement (TIA) 2007-003 Inadequate Degraded Voltage Time Delays |
ML080350270 | 21 February 2008 | Vogtle | Final Response to Vogtle Electric Generating Plant - Task Interface Agreement (TIA) 2007-01 Related to the Development of the Reactor Core Power Distribution Limits |
RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants | 13 February 2008 | Wolf Creek | Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants |
ML080220591 | 30 January 2008 | MIT Nuclear Research Reactor | Response to Notice of Violation (NRC Inspection Report No. 50-020/2007-2030 |
NRC Generic Letter 2008-01 | 11 January 2008 | Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | |
RIS 2007-29, Clarified Guidance for Licensed Operator Watch Standing Proficiency | 27 December 2007 | Clarified Guidance for Licensed Operator Watch Standing Proficiency | |
Information Notice 2007-40, Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees | 21 December 2007 | Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees | |
IR 05000020/2007203 | 19 December 2007 | MIT Nuclear Research Reactor | NRC Special Inspection Report No. 05000020-07-203 and Notice of Violation |