ML20357B13330 December 2020OconeeTransmittal Memo - Delivery of Partial Deliverable Associated with the Trace Code Maintenance, Plant Model Maintenance, and Plant Model Development to Support Licensing Actions and Emergent Technical Issues User Need
ML20272A1595 October 202009/09-11/2020 Meeting Summary of the First Accident Tolerant Fuel Severe Accident Pirt Panel
ML20154K58217 September 2020Periodic Review Memo
ML20174A41822 June 2020ERI Peer Review of Source Term Work at Sandia National Labs
ML20126G37613 May 2020Applicability of Source Term for Accident Tolerant Fuel, High Burn Up and Extended Enrichment
ML19270E33527 November 2019Closeout to Rar for Independent Review of Regulatory and Technical Basis for Revising the Design-Basis Accident Fuel Handling Accident
ML18152B1424 June 2018Transmittal - Final Deliverable Associated with User Need NRR-2016-009
ML18071A05313 March 2018Regulatory Information Conference (RIC) Session W23 Maximizing Efficiency and Transparency in Safety Research of Accident Tolerant Fuel
ML17319A53224 November 2017Memo for Non-LWR Strategy 2 Implementation Action Plan Progress
ML17223A71622 August 2017Memo - Transmittal of Preliminary, Interim Analysis of Kathy ATWS-I Experimental Data (NRR-2015-010)
ML17108A80823 June 2017Byron
Braidwood
OEDO-16-00783 - Closure Letter for Samuel Miranda, Citizen, Email 2.206 - Enforcement Petition Regarding Exelon'S Byron and Braidwood Stations
ML15259A47216 September 2015Results of Periodic Review of Regulatory Guide 8.35
ML13051A03531 May 2013Regulatory Analysis for Rg 1 68, Revision 4
ML13122A00822 May 2013Nine Mile Point
Ginna
Notice of Impending Public Release of Technical Letter Report (Tlr) on Summary of Aging Management Program Effectiveness Audits to Inform Subsequent License Renewal: R.E. Ginna Nuclear Power Plant and Nine Mile Point Nuclear Station, Unit 1
ML12355A70520 December 2012North AnnaG20120909/LTR-12-0713 - Seismic History and Hydraulic Fracturing (Response)
ML12132A42611 May 2012PerryG20120260/LTR-12-0163/EDATS: SECY-2012-0191 - Response to Email Sylvia Watson Re Perry Nuclear Power Plant - Safety Concerns
ML13127A36813 March 2012North AnnaMemo from M. Case to P. Hiland, Subject: Review of Draft Nureg/Cr - Xxxx Entitled, Ultrasonic Phased Array Assessment of the Interference Fit and Leak Path of the North Anna Unit 2 Control Rod Drive Mechanism Nozzle 63 with Destructive Vali
ML0833602635 December 2008Nomination Letter for Richard Pelton to ANSI 3.1 Working Group
RIS 2008-26, Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification29 October 2008Clarified Requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(Y) When Implementing 10 CFR Section 50.54(x) to Depart from a License Condition or Technical Specification
RIS 2008-25, Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds22 October 2008Primary Water Stress Corrosion Cracking of Dissimilar Metal Butt Welds in Pressurized Water Reactor Primary Coolant System Piping Welds
Information Notice 2008-17, Construction Experience with Concrete Placement Process22 October 2008Construction Experience with Concrete Placement Process
RIS 2008-22, Notification of Licensees Regarding Aircraft Threats6 October 2008Notification of Licensees Regarding Aircraft Threats
RIS 2008-21, Issuance of LIC-109, Acceptance Review Procedures.2 September 2008Issuance of LIC-109, Acceptance Review Procedures.
Information Notice 2008-16, Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 20072 September 2008Summary of Fitness-for-Duty Program Performance Reports for Calendar Year 2007
ML08234085129 August 2008Kansas State UniversityNRC Inspection Report No. 50-188/2008-203
RIS 2008-20, Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02)20 August 2008Redesignation of Safeguards Advisory for Operating Power Reactors (SA-05-02)
Information Notice 2008-12, Reactor Trip Due to Off-Site Power Fluctuation7 July 2008BraidwoodReactor Trip Due to Off-Site Power Fluctuation
RIS 2008-16, Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations27 June 2008Withdrawn NRC Regulatory Issue Summary 2008-16: Preparation and Scheduling of Operator Licensing Examinations
RIS 2008-15, NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process25 June 2008NRC Staff Position on Crediting Mitigating Strategies Implemented in Response to Security Orders in Risk-informed Licensing Actions and in the Significance Determination Process
ML0810800425 May 2008University of LowellUniversity of Massachusetts - Lowell Research Reactor - Closure of Confirmatory Action Letter CAL No. NRR-03-009 on Site Specific Compensatory Measures Implementation Plan
Information Notice 2008-07, Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds24 April 2008Cracking Indications in Thermally Treated Alloy 600 Steam Generator Tubes and Tube-To-Tubesheet Welds
RIS 2005-20, Rev. 1: Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety.16 April 2008Rev. 1: Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety.
Information Notice 2008-05, Fires Involving Emergency Diesel Generators Exhaust Manifolds12 April 2008Fires Involving Emergency Diesel Generators Exhaust Manifolds
ML08095023511 April 2008Fatigue Analysis of Nuclear Power Plant Components
RIS 2008-10, Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008)11 April 2008Vermont YankeeVermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH_23, NRC, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008)
Information Notice 2008-06, Instrument Air System Failure Resulting in Manual Reactor Trip10 April 2008Instrument Air System Failure Resulting in Manual Reactor Trip
Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants7 April 2008Hatch
Oconee
Mcguire
Catawba
McGuire
Counterfeit Parts Supplied to Nuclear Power Plants
Information Notice 2008-02, Findings Identified During NRC Component Design Bases Inspections19 March 2008Findings Identified During NRC Component Design Bases Inspections
ML08011011619 March 2008Endorsement of Revision 1 to NEI 06-04, Nuclear Energy Institute: Conducting a Hostile Action Based Emergency Response Drill
RIS 2008-06, Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles6 March 2008Protection Against the Malevolent Use of Vehicles When Utilizing Landform Obstacles
RIS 2008-04, Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process28 February 2008Discontinuation of Two Performance Indicators Associated with the Security Reactor Oversight Process
RIS 2008-05, Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal27 February 2008Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal
ML08042043525 February 2008FermiResponse to Fermi Power Plant, Unit 2 - Task Interface Agreement (TIA) 2007-003 Inadequate Degraded Voltage Time Delays
ML08035027021 February 2008VogtleFinal Response to Vogtle Electric Generating Plant - Task Interface Agreement (TIA) 2007-01 Related to the Development of the Reactor Core Power Distribution Limits
RIS 2008-03, Return/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants13 February 2008Wolf CreekReturn/Reuse of Water Containing Previously Discharged Radioactive Effluents from Operating Nuclear Power Plants
ML08022059130 January 2008MIT Nuclear Research ReactorResponse to Notice of Violation (NRC Inspection Report No. 50-020/2007-2030
NRC Generic Letter 2008-0111 January 2008Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems.
RIS 2007-29, Clarified Guidance for Licensed Operator Watch Standing Proficiency27 December 2007Clarified Guidance for Licensed Operator Watch Standing Proficiency
Information Notice 2007-40, Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees21 December 2007Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees
IR 05000020/200720319 December 2007MIT Nuclear Research ReactorNRC Special Inspection Report No. 05000020-07-203 and Notice of Violation