Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML23075A33516 March 2023PalisadesKM-KT Session Presentation Disputed Violations
ML22258A11114 September 2022Diablo Canyon2022 Diablo Canyon PIR Request for Information
OI 4-2020-007, Closure of Investigation OI 4-2020-00722 September 2021Arkansas NuclearClosure of Investigation OI 4-2020-007
OI 4-2020-010, Closure of Investigation (OI 4-2020-010)26 August 2021WaterfordClosure of Investigation (OI 4-2020-010)
ML20350B81111 December 2020River Bend2021 RBS PIR Request for Information
ML20275A07829 September 2020E-mail to Mr. Joey Clark - Riv Org Chart for RUG IV Members
ML05325016222 November 2005MillstoneAtt. 4 Millstone Power Station Appeal Faq 55.2
ML05231058817 April 2005MillstoneFax Transmittal from D. Dodson of Millstone Power Station to B. Gott of USNRC, Regarding NRC Event Notification No. 41607 (5 Pages) Exemption 2)
ML0312002225 May 2003MillstoneRequest for Additional Information - Selective Implementation of the Alternative Source Term - Fuel Handling Accident Analyses
ML20203G51929 December 1997North AnnaUltrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping
ML18101B3148 April 1996SalemLER 96-004-00:on 960307,identified That Ci Valve TS Surveillance Missed Due to Lack of Adequate Controls for Development & Maint of TS Sps.Util Verifying Adequacy of All TS SPs.W/960408 Ltr
ML18093A8758 June 1988SalemLER 88-010-00:on 880509,identified That for 37 Electrical Circuits Penetrating Containment,Backup Overcurrent Protection Device Would Not Operate.Caused by Inadequate Design Review.Detailed Calculation prepared.W/880608 Ltr
ML20198K48927 July 1985Comanche PeakRev 0 to Instruction QI-QP-11.18-4, Ultrasonic Exam of Hilti Bolts. Related Info Encl
ML20198K4721 June 1984Comanche PeakRev 4 to Instruction QI-QP-11.18-3, Ultrasonic Thickness Measurement. Related Documentation Encl
ML20138P1478 February 1984Comanche Peak
05000000
Rev 4 to Procedure CP-QP-2.4, NDE Personnel Training, Qualification & Certification
ML20202A97318 February 1983Comanche PeakRev 3 to Procedure QI-QAP-10.2-1, Liquid Penetrant Exam. Related Info Encl
ML20195F41115 January 1982Comanche PeakRev 8 to Procedure QI-QAP-11.1-28, Installation Insps of ASME Component Supports,Class 1-3