ML23075A335 | 16 March 2023 | Palisades | KM-KT Session Presentation Disputed Violations |
ML22258A111 | 14 September 2022 | Diablo Canyon | 2022 Diablo Canyon PIR Request for Information |
OI 4-2020-007, Closure of Investigation OI 4-2020-007 | 22 September 2021 | Arkansas Nuclear | Closure of Investigation OI 4-2020-007 |
OI 4-2020-010, Closure of Investigation (OI 4-2020-010) | 26 August 2021 | Waterford | Closure of Investigation (OI 4-2020-010) |
ML20350B811 | 11 December 2020 | River Bend | 2021 RBS PIR Request for Information |
ML20275A078 | 29 September 2020 | E-mail to Mr. Joey Clark - Riv Org Chart for RUG IV Members | |
ML053250162 | 22 November 2005 | Millstone | Att. 4 Millstone Power Station Appeal Faq 55.2 |
ML052310588 | 17 April 2005 | Millstone | Fax Transmittal from D. Dodson of Millstone Power Station to B. Gott of USNRC, Regarding NRC Event Notification No. 41607 (5 Pages) Exemption 2) |
ML031200222 | 5 May 2003 | Millstone | Request for Additional Information - Selective Implementation of the Alternative Source Term - Fuel Handling Accident Analyses |
ML20203G519 | 29 December 1997 | North Anna | Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping |
ML18101B314 | 8 April 1996 | Salem | LER 96-004-00:on 960307,identified That Ci Valve TS Surveillance Missed Due to Lack of Adequate Controls for Development & Maint of TS Sps.Util Verifying Adequacy of All TS SPs.W/960408 Ltr |
ML18093A875 | 8 June 1988 | Salem | LER 88-010-00:on 880509,identified That for 37 Electrical Circuits Penetrating Containment,Backup Overcurrent Protection Device Would Not Operate.Caused by Inadequate Design Review.Detailed Calculation prepared.W/880608 Ltr |
ML20198K489 | 27 July 1985 | Comanche Peak | Rev 0 to Instruction QI-QP-11.18-4, Ultrasonic Exam of Hilti Bolts. Related Info Encl |
ML20198K472 | 1 June 1984 | Comanche Peak | Rev 4 to Instruction QI-QP-11.18-3, Ultrasonic Thickness Measurement. Related Documentation Encl |
ML20138P147 | 8 February 1984 | Comanche Peak 05000000 | Rev 4 to Procedure CP-QP-2.4, NDE Personnel Training, Qualification & Certification |
ML20202A973 | 18 February 1983 | Comanche Peak | Rev 3 to Procedure QI-QAP-10.2-1, Liquid Penetrant Exam. Related Info Encl |
ML20195F411 | 15 January 1982 | Comanche Peak | Rev 8 to Procedure QI-QAP-11.1-28, Installation Insps of ASME Component Supports,Class 1-3 |