May 5, 2003 Mr. J. A. Price Site Vice President - Millstone Dominion Nuclear Connecticut, Inc.

c/o Mr. David W. Dodson Rope Ferry Road Waterford, CT 06385

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - SELECTIVE IMPLEMENTATION OF THE ALTERNATIVE SOURCE TERM - FUEL HANDLING ACCIDENT ANALYSES, MILLSTONE POWER STATION, UNIT NO. 2 (TAC NO. MB6479)

Dear Mr. Price:

By letter dated September 26, 2002, you submitted a proposed amendment to the Technical Specifications (TSs) for Millstone Power Station, Unit No. 2. The proposed amendment would revise the TSs based on a re-analysis of the limiting design basis Fuel Handling Accident using an Alternative Source Term in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.67 and Regulatory Guide 1.183.

The U.S. Nuclear Regulatory Commission staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure. We request that the additional information be provided by May 30, 2003. The response timeframe was discussed with Mr. Ravi Joshi of your staff on April 30, 2003. If circumstances result in the need to revise your response date, or if you have any questions, please contact me at (301) 415-1420.

Sincerely,

/RA/

Richard B. Ennis, Senior Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-336

Enclosure:

Request for Additional Information cc w/encl: See next page

ML031200222 OFFICE PDI-2/PM PDI-2/LA SPLB/SC PDI-2/SC NAME REnnis CRaynor SWeerakkody JClifford DATE 4/30/03 5/1/03 5/5/03 5/5/03 Millstone Power Station Unit 2 cc:

Ms. L. M. Cuoco Mr. D. A. Christian Senior Counsel Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc. and Chief Nuclear Officer Rope Ferry Road Innsbrook Technical Center - 2SW Waterford, CT 06385 5000 Dominion Boulevard Glen Allen, VA 23060 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Mr. John Markowicz Department of Environmental Protection Co-Chair 79 Elm Street Nuclear Energy Advisory Council Hartford, CT 06106-5127 9 Susan Terrace Waterford, CT 06385 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Mr. Evan W. Woollacott 475 Allendale Road Co-Chair King of Prussia, PA 19406 Nuclear Energy Advisory Council 128 Terrys Plain Road First Selectmen Simsbury, CT 06070 Town of Waterford 15 Rope Ferry Road Mr. D. A. Smith Waterford, CT 06385 Manager - Licensing Dominion Nuclear Connecticut, Inc.

Charles Brinkman, Manager Rope Ferry Road Washington Nuclear Operations Waterford, CT 06385 ABB Combustion Engineering 12300 Twinbrook Pkwy, Suite 330 Ms. Nancy Burton Rockville, MD 20852 147 Cross Highway Redding Ridge, CT 00870 Senior Resident Inspector Millstone Power Station Mr. G. D. Hicks c/o U.S. Nuclear Regulatory Commission Director - Nuclear Station Safety and Licensing P.O. Box 513 Dominion Nuclear Connecticut, Inc.

Niantic, CT 06357 Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Mr. S. E. Scace Dominion Nuclear Connecticut, Inc. Assistant to the Site Vice President Rope Ferry Road Dominion Nuclear Connecticut, Inc.

Waterford, CT 06385 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385

Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385

REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED AMENDMENT TO TECHNICAL SPECIFICATIONS SELECTIVE IMPLEMENTATION OF THE ALTERNATIVE SOURCE TERM FUEL HANDLING ACCIDENT ANALYSES MILLSTONE POWER STATION, UNIT NO. 2 DOCKET NO 50-336 By letter dated September 26, 2002, Dominion Nuclear Connecticut, Inc. (the licensee) submitted a proposed amendment to the Technical Specifications (TSs) for Millstone Power Station, Unit No. 2 (MP2). The proposed amendment would revise the TSs based on a re-analysis of the limiting design basis Fuel Handling Accident (FHA) using an Alternative Source Term in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 50.67 and Regulatory Guide 1.183.

The Nuclear Regulatory Commission (NRC) staff has reviewed the information the licensee provided that supports the proposed TS changes. In order for the staff to complete its evaluation, the following additional information is requested:

The proposed changes to TS 3.9.4, Containment Penetrations, would require that any containment penetration that provides direct access to the outside atmosphere, including the equipment hatch and personnel airlock doors, be capable of being closed under administrative controls within 30 minutes of an FHA. The proposed Bases for TS 3.9.4 and Attachment 2, page 8, of the licensee's submittal state that if it is determined that closure of all containment penetrations would represent a significant radiological hazard to the personnel involved, the decision may be made to forgo the closure of the affected penetration(s). Clarify what is meant by significant radiological hazard and describe the specific criteria that will be incorporated into the administrative controls to determine whether to forgo closure of the affected penetration(s).

Enclosure