 Start dateSiteTitleDescription
ML20113E83623 April 2020WaterfordSummary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station
ML20108F54422 April 2020WaterfordReassignment of Project Manager, Effective April 26, 2020
ML20106E88820 April 2020WaterfordSummary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes
ML20086M3851 April 2020WaterfordRequest for Additional Information Regarding License Amendment Request to Revise Technical Specification 3/4 8.1, A.C. Sources Operating
ML20083J92131 March 2020WaterfordRequest for Withholding Information from Public Disclosure
ML20059K15619 March 2020WaterfordDiscussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc
ML20021A02321 February 2020WaterfordRequest for Withholding Information from Public Disclosure, Affidavit Executed by Zachary S. Harper of Westinghouse Electric Company, Dated January 8, 2020, Meeting Slides
ML20049A41020 February 2020WaterfordRequest for Additional Information Regarding License Amendment Request to Revise Surveillance Requirement 4.7.6.1.d, Control Room Air Filtration System
ML20013G2597 February 2020WaterfordSummary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079
ML20022A25828 January 2020WaterfordRe-Issuance of Approval of Relief Request WF3-RR-19 2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control
ML20002A02013 January 2020WaterfordApproval of Relief Request WF3-RR-19-2, Relief from the Requirements of Asme Code Section XI Regarding Alternate Repair of Degraded Drain Line of Chemical and Volume Control System
ML19344D03619 December 2019WaterfordRequest for Withholding Information from Public Disclosure Affidavit Dated December 4, 2019, Executed by Zachary S. Harper of Westinghouse Electric Company LLC Meeting Slides
ML19298B9185 November 2019WaterfordSummary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3
ML19280C27030 October 2019WaterfordApproval of Partial Fee Waiver Regarding Lead Plant Review of Digital Instrumentation and Control Interim Staff Guidance-(ISG)-06 Revision 2
ML19275D43824 October 2019WaterfordRedacted - Issuance of Amendment No. 256 for Use of the Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components
ML19282D89215 October 2019WaterfordRevision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML19247B1979 September 2019WaterfordApproval of Relief Request W3-ISI-032,Relief from the Requirements of ASME Code Section XI Regarding Volumetric Examination
ML19232A02527 August 2019WaterfordAuthorization of Proposed Alternative to ASME Code Section XI, IWA-4000, Repair/Replacement Activities
ML19157A31612 June 2019WaterfordAuthorization of Proposed Alternative to ASME Code Case N-770-2
ML19046A15519 February 2019WaterfordRequest for Withholding Information from Public Disclosure, 1/8/19 Affidavit Executed by Korey L. Hosack, Westinghouse Electric Company Related to Tranflow License Amendment Request
ML19022A33713 February 2019WaterfordIssuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel Misload
ML19018A01028 January 2019WaterfordRequest for Additional Information Regarding License Amendment Request for Revision of Technical Specification 3/4.7.4,Ultimate Heat Sink
ML19009A36224 January 2019WaterfordLetter Withdrawal of Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Feature Actuation System
ML19009A30924 January 2019WaterfordFRN - Waterford Steam Electric Station, Unit 3 - Withdrawal of Amendment Request to Revise Technical Specification 3/4.3.2 to Relocate Surveillance Frequency Requirements for Engineered Safety Feature Actuation System
ML18320A09026 November 2018WaterfordRequest for Additional Information Regarding License Amendment Request for Use of the Transflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components
ML18299A0867 November 2018WaterfordDraft Request for Additional Information License Amendment Request Regarding the Revision of UFSAR Section 3.9
ML18228A84620 August 2018WaterfordReview of the Spring 2017 Steam Generator Tube Inservice Inspections During Refueling Outage 21
ML18212A16715 August 2018WaterfordRequest for Withholding Information from Public Disclosure - 2/26/18, Affidavit Executed by James Gresham, Westinghouse Related to Tranflow License Amendment Request
ML18180A29823 July 2018WaterfordIssuance of Amendment No. 252 Adoption of the Raptor-M3G Code for Neutron Fluence Calculations
ML18178A29328 June 2018WaterfordAcceptance of Requested Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Internal Components
ML18145A2651 June 2018WaterfordSupplemental Information Needed for Acceptance of Request for Licensing Action Use of Tranflow Code for Determining Pressure Drops Across Steam Generator Secondary Side Components
ML18120A31110 May 2018WaterfordSummary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3
ML18093A48717 April 2018WaterfordPublic Teleconference Regarding Request for Alternative to the Requirements in American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, IWA-5211, for the Waterford Steam Electric Station, Unit 3
ML18037B1108 February 2018WaterfordPresentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload
ML18005A09925 January 2018WaterfordSummary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2
ML17341A12011 December 2017WaterfordRelief Request PRR-WF3-2017-3, Request for Alternative to ASME OM Code Requirements for Comprehensive Testing of High Pressure Safety Injection Pump AB (CAC No. MF9875; EPID L-2017-LLR-0049)
ML17331A0886 December 2017WaterfordSummary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3
ML17328A88229 November 2017WaterfordRequests for Relief GRR-1, PRR-1 and PRR-2, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth 10-Year Program Interval (CAC Nos. MF9869, 9870, and 9871; EPID L-2017-LRM-0045-47)
ML17318A12316 November 2017WaterfordLicensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System
ML17306A1652 November 2017WaterfordUpdated Licensee Slide Presentation for October 19, 2017 Category 1 Meeting Regarding Raptor
ML17290A65519 October 2017WaterfordPublic Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology
ML17290A04917 October 2017WaterfordDiscussion Topics for October 19, 2017 Category 1 Public Meeting Regarding Fluence Methodology
ML17192A00727 July 2017WaterfordIssuance of Amendment No. 250 Adoption of Technical Specifications Task Force Traveler TSTF 545, Revision 3
ML17174B22628 June 2017WaterfordSummary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station
ML17150A4128 June 2017WaterfordRequest for Presubmittal Public Meeting Relief Request from Asme Code Requirements for High Pressure Safety Injection (Hpsi) Pump AB Testing Requirements
ML17151A2951 June 2017Waterford6/1/2017, Meeting Slide for Pre-Submittal Meeting Regarding Ultimate Heat Sink Technical Specification Change Request for Waterford 3
ML17097A13325 April 2017WaterfordLetter - Withdrawal of Amendment Request to Revise TS Table 4.3-2, ESFAS Subgroup Relays to the Surveillance Frequency Control Program
ML17097A14325 April 2017WaterfordFRN - Withdrawal of Amendment Request to Revise TS Table 4.3-2, ESFAS Subgroup Relays to the Surveillance Frequency Control Program
ML17069A18722 March 2017WaterfordRequest for Alternative to 10 CFR 50.55a(c) ASME Code Section III Code Case 1361-1, Relief Request W3-ISI-024
ML17041A17310 February 2017WaterfordFurther Discussion Topics for Public Meeting to Discuss License Amendment Request Regarding the Revision of TS Table 4.3-2 for Waterford Steam Electric Station, Unit 3