Issue date | Site | Title | Topic | |
---|---|---|---|---|
ML20199D887 | 30 November 1998 | Farley | Technical Evaluation Rept on Third 10-Year Interval Inservice Insp Program Plan,For Plant,Units 1 & 2;Updated Inservice Insp Program Plan | Boric Acid High Radiation Area Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20198S194 | 30 November 1998 | Vogtle | Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan,Southern Nuclear Operating Co, Vogtle Electric Generating Plant,Units 1 & 2 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 | 30 November 1998 | Beaver Valley | Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1 | Boric Acid Hydrostatic VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20196F925 | 25 November 1998 | FitzPatrick | Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant | Packing leak Non-Destructive Examination Stroke time Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Through-Wall Leakage Scaffolding |
ML20196D832 | 13 November 1998 | Crystal River | Rev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE Program | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
3F1198-04, Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813 | 6 November 1998 | Crystal River | Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813 | Non-Destructive Examination Hydrostatic Incorporated by reference |
ML20155B671 | 26 October 1998 | Braidwood | Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan | Boric Acid High Radiation Area Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Scaffolding |
ML20196H513 | 8 October 1998 | Perry | Rev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power Plant | Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier Liquid penetrant Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Grace period |
ML20203H882 | 30 September 1998 | Waterford | Technical Evaluation Rept on Second 10-year ISI Program Plan:Entergy Operations,Waterford-3 Steam Electric Station | VT-2 Incorporated by reference |
ML20154B413 | 22 September 1998 | McGuire | Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage | Packing leak Hydrostatic Anchor Darling VT-2 Dissimilar Metal Weld Scaffolding |
ML20153B881 | 18 September 1998 | Fermi | Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20153B861 | 18 September 1998 | Fermi | Forwards SE Accepting & Suppls & 0727, Requesting Relief from Certain ISI Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 | Nondestructive Examination |
PY-CEI-NRR-2310, Submits Inservice Exam Relief Requests for Second 120 Month Interval.Second Interval Will Start on 981118.Attachment 1 Provides Summary & History of Proposed Relief Requests for ISI Program | 26 August 1998 | Perry | Submits Inservice Exam Relief Requests for Second 120 Month Interval.Second Interval Will Start on 981118.Attachment 1 Provides Summary & History of Proposed Relief Requests for ISI Program | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Foreign Material Exclusion Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Scaffolding |
ML20238F822 | 25 August 1998 | Braidwood | Rev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan | Coatings |
ML20236Y548 | 3 August 1998 | Braidwood | Rev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program Plan | Boric Acid High Radiation Area Hydrostatic Coatings VT-2 Scaffolding |
ML20236T845 | 24 June 1998 | Perry | Rev 3,Change 3 to Vol 1 of Inservice Examination Program, for Pnpp | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 B.5.b Mitigating Strategies Liquid penetrant Through-Wall Leak Dissimilar Metal Weld Scaffolding |
NRC-98-0093, Provides Detailed Response to Request for Addl Info Re Relief Request Update for First 10-yr ISI NDE Program | 19 June 1998 | Fermi | Provides Detailed Response to Request for Addl Info Re Relief Request Update for First 10-yr ISI NDE Program | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
HL-5635, Forwards Revs to Third 10-yr Interval Inservice Insp Program,Including Program Introduction,Revised Relief Requests & NUREG-0313 Summary | 8 June 1998 | Hatch | Forwards Revs to Third 10-yr Interval Inservice Insp Program,Including Program Introduction,Revised Relief Requests & NUREG-0313 Summary | Weld Overlay Hydrostatic VT-2 Dissimilar Metal Weld |
ML20248H787 | 25 May 1998 | Waterford | Rev 1 to Waterford Unit 3 Second Interval ISI Plan | Non-Destructive Examination Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML20217D205 | 20 April 1998 | Perry | SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147 | Incorporated by reference |
ML20217D191 | 20 April 1998 | Perry | Forwards SE Re Request to Use Code Case N-524 as Alternative to ASME Code Section 11,per 10CFR50.55a(a)(3)(i).NRC Authorizes Use of Code Case N-524 Until Such Time Code Case Included in Future Rev of RG 1.147 | |
ML20217H306 | 16 April 1998 | Brunswick | Rev 0 to ISI Program for Class 1,2 & 3 Components & Supports | Weld Overlay Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
NRC-98-0060, Forwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 1998 | 16 April 1998 | Fermi | Forwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 1998 | Hydrostatic Nondestructive Examination VT-2 |
ML20216H976 | 16 April 1998 | Crystal River | ASME Section XI ISI Interval 3,Ten Year (NDE) Program Manual, Effective Aug 14,1998 Through Aug 14,2008 | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld Scaffolding |
ML20217B883 | 24 March 1998 | Vogtle | SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak |
ML20203H874 | 28 February 1998 | Title List of Documents Made Publicly Available.December 1-31, 1997 | ||
ML20217E732 | 24 February 1998 | Mcguire | Rev 0 to ISI Rept,Unit 2 McGuire 1997 Refueling Outage 11 | Hydrostatic Dissimilar Metal Weld |
ML20202C471 | 30 January 1998 | Limerick | Forwards Summary of ISI Interval ISI Program Request for Relief from Certain ASME Code Requirements,List of ASME Code Cases & Result of Util Review of Current ASME Section XI Bases Describes in First & Second Insp Interval ISI Program | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML20217K462 | 30 January 1998 | Sequoyah | Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Tva,Sequoyah Nuclear Plant,Units 1 & 2 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak Through Wall Leak Scaffolding |
ML18022B035 | 26 January 1998 | Harris | Rev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval. | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Eddy Current Testing Liquid penetrant Dissimilar Metal Weld Thermal fatigue |
ML20199C123 | 13 January 1998 | Byron | Safety Evaluation Granting Second 10-yr Inservice Insp Program Plan Relief Request | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20198R477 | 13 January 1998 | Davis Besse | SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure Boundary Leakage Through-Wall Leak |
ML17229A614 | 12 January 1998 | Saint Lucie | Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. | Boric Acid Shutdown Margin Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Moisture barrier Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML20199G566 | 6 January 1998 | FitzPatrick | Rev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize Drawings | Packing leak Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier EVT-1 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld Scaffolding |
PY-CEI-NRR-2244, Forwards Relief Request IR-031 for Approval to Use ASME Code Case N-524 as Alternative to ASME Section XI Code Requirements at Plant by 980518.Approval Will Facilitate close-out of First 10-year Insp Interval Which Ends 981118 | 18 December 1997 | Perry | Forwards Relief Request IR-031 for Approval to Use ASME Code Case N-524 as Alternative to ASME Section XI Code Requirements at Plant by 980518.Approval Will Facilitate close-out of First 10-year Insp Interval Which Ends 981118 | |
ML18150A466 | 16 December 1997 | Surry | ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 | VT-2 Liquid penetrant |
ML20199H371 | 19 November 1997 | Grand Gulf Arkansas Nuclear River Bend Waterford | SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 | Nondestructive Examination VT-2 Incorporated by reference |
ML20212E081 | 23 October 1997 | Cooper | SER Accepting Third 10-yr Interval Insp Program Plan & Associated Requests for Relief for Plant | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak Through-Wall Leak |
B16672, Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr | 28 August 1997 | Millstone | Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr | Safe Shutdown Hydrostatic Nondestructive Examination VT-2 Scaffolding |
HL-5437, Forwards Revs to Ei Hatch GL 88-01 & NUREG-0313 Commitments Re Third 10-year Interval Inservice Insp Program | 30 July 1997 | Hatch | Forwards Revs to Ei Hatch GL 88-01 & NUREG-0313 Commitments Re Third 10-year Interval Inservice Insp Program | Weld Overlay Nondestructive Examination Dissimilar Metal Weld |
ML20148Q257 | 1 July 1997 | Waterford | Rev 0 to Entergy Operations Waterford-3 Steam Electric Station ISI Plan Second 10-Yr Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML18150A444 | 9 June 1997 | Surry | Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. | VT-2 |
ML20140F605 | 31 May 1997 | Title List of Documents Made Publicly Available.March 1-31, 1997 | Hot Short Safe Shutdown Boric Acid Fitness for Duty Reactor Vessel Water Level Coatings VT-2 Earthquake Backfit | |
ML20148E524 | 21 May 1997 | Vogtle | Inservice Insp Program Second 10-yr Interval, Rev 0 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML20137T994 | 9 April 1997 | Seabrook | Safety Evaluation Accepting Proposed Use of ASME Code Case N-524 for North Atlantic Energy Service Corp,Seabrook Station,Unit 1 | Incorporated by reference |
ML20137T993 | 9 April 1997 | Forwards SE Re 961022 Request for Approval for Use of Alternative Rules of ASME Boiler & Pressure Vessel Code, Section XI Code Case N-524.Based on Evaluation,Request Accepted Pursuant to 10CFR50.551(a)(3)(i) | ||
ML20137T987 | 9 April 1997 | Seabrook | Forwards SE Re 961022 Request for Approval for Use of Alternative Rules of ASME Boiler & Pressure Vessel Code, Section XI Code Case N-524.Based on Evaluation,Request Accepted Pursuant to 10CFR50.551(a)(3)(i) | |
L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns | 31 March 1997 | Cooper | TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Pressure boundary leak Through Wall Leak |
ML20136F850 | 7 March 1997 | Davis Besse | Requests Relief from Certain ASME Code Requirements for Inservice Testing & Insp for Plant.Relief Request RR-A14 Requests Relief from Section XI of ASME Code,1896 Edition for Exam of Class 1,2 & 3 Integrally Welded Attachments | Hydrostatic Pressure Boundary Leakage |
ML17229A253 | 5 March 1997 | Saint Lucie | Requests Approval to Incorporate Code Case N-524, Alternative Exam Requirements for Longitudinal Welds in Class 1 & 2 Piping Section Xi,Div 1. | Scaffolding |