 Issue dateSiteTitleTopic
ML20199D88730 November 1998FarleyTechnical Evaluation Rept on Third 10-Year Interval Inservice Insp Program Plan,For Plant,Units 1 & 2;Updated Inservice Insp Program PlanBoric Acid
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20198S19430 November 1998VogtleTechnical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan,Southern Nuclear Operating Co, Vogtle Electric Generating Plant,Units 1 & 2Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
L-98-008, Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 130 November 1998Beaver ValleyTechnical Evaluation Rept on Third 10-Year Interval ISI Program Plan:Duquesne Light Co,Beaver Valley Power Station, Unit 1Boric Acid
Hydrostatic
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML20196F92525 November 1998FitzPatrickSafety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for PlantPacking leak
Non-Destructive Examination
Stroke time
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Through-Wall Leakage
Scaffolding
ML20196D83213 November 1998Crystal RiverRev 1 to Crystal River Unit 3 ASME Section Xi,Isi Program Interval 3 & Ten Yr NDE ProgramNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Stress corrosion cracking
Dissimilar Metal Weld
Scaffolding
3F1198-04, Forwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-9808136 November 1998Crystal RiverForwards Second Ten-Year Insp Interval Closeout Summary Rept. Rept Includes Insps & repair-replacements That Occurred 960517-980813Non-Destructive Examination
Hydrostatic
Incorporated by reference
ML20155B67126 October 1998BraidwoodSafety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program PlanBoric Acid
High Radiation Area
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Scaffolding
ML20196H5138 October 1998PerryRev 4,Vol 1 to Inservice Exam Program for Perry Nuclear Power PlantNon-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
Liquid penetrant
Pressure Boundary Leakage
Fire Protection Program
Dissimilar Metal Weld
Grace period
ML20203H88230 September 1998WaterfordTechnical Evaluation Rept on Second 10-year ISI Program Plan:Entergy Operations,Waterford-3 Steam Electric StationVT-2
Incorporated by reference
ML20154B41322 September 1998McGuireRev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling OutagePacking leak
Hydrostatic
Anchor Darling
VT-2
Dissimilar Metal Weld
Scaffolding
ML20153B88118 September 1998FermiSafety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
ML20153B86118 September 1998FermiForwards SE Accepting & Suppls & 0727, Requesting Relief from Certain ISI Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2Nondestructive Examination
PY-CEI-NRR-2310, Submits Inservice Exam Relief Requests for Second 120 Month Interval.Second Interval Will Start on 981118.Attachment 1 Provides Summary & History of Proposed Relief Requests for ISI Program26 August 1998PerrySubmits Inservice Exam Relief Requests for Second 120 Month Interval.Second Interval Will Start on 981118.Attachment 1 Provides Summary & History of Proposed Relief Requests for ISI ProgramBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Foreign Material Exclusion
Pressure Boundary Leakage
Fire Protection Program
Dissimilar Metal Weld
Scaffolding
ML20238F82225 August 1998BraidwoodRev 2 to Braidwood Station Units 1 & 2 Second Interval ISI Program PlanCoatings
ML20236Y5483 August 1998BraidwoodRev 1 to Braidwood Station Units 1 & 2 Second Interval ISI Program PlanBoric Acid
High Radiation Area
Hydrostatic
Coatings
VT-2
Scaffolding
ML20236T84524 June 1998PerryRev 3,Change 3 to Vol 1 of Inservice Examination Program, for PnppNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
B.5.b Mitigating Strategies
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
Scaffolding
NRC-98-0093, Provides Detailed Response to Request for Addl Info Re Relief Request Update for First 10-yr ISI NDE Program19 June 1998FermiProvides Detailed Response to Request for Addl Info Re Relief Request Update for First 10-yr ISI NDE ProgramHydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
HL-5635, Forwards Revs to Third 10-yr Interval Inservice Insp Program,Including Program Introduction,Revised Relief Requests & NUREG-0313 Summary8 June 1998HatchForwards Revs to Third 10-yr Interval Inservice Insp Program,Including Program Introduction,Revised Relief Requests & NUREG-0313 SummaryWeld Overlay
Hydrostatic
VT-2
Dissimilar Metal Weld
ML20248H78725 May 1998WaterfordRev 1 to Waterford Unit 3 Second Interval ISI PlanNon-Destructive Examination
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML20217D20520 April 1998PerrySER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147Incorporated by reference
ML20217D19120 April 1998PerryForwards SE Re Request to Use Code Case N-524 as Alternative to ASME Code Section 11,per 10CFR50.55a(a)(3)(i).NRC Authorizes Use of Code Case N-524 Until Such Time Code Case Included in Future Rev of RG 1.147
ML20217H30616 April 1998BrunswickRev 0 to ISI Program for Class 1,2 & 3 Components & SupportsWeld Overlay
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
Scaffolding
NRC-98-0060, Forwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 199816 April 1998FermiForwards Relief Request Update for First 10-Yr Interval ISI non-destructive Exam Program.Util Requests Review & Approval of Relief Requests by 980710 to Support RF06 Scheduled to Begin in Aug 1998Hydrostatic
Nondestructive Examination
VT-2
ML20216H97616 April 1998Crystal RiverASME Section XI ISI Interval 3,Ten Year (NDE) Program Manual, Effective Aug 14,1998 Through Aug 14,2008Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Stress corrosion cracking
Dissimilar Metal Weld
Scaffolding
ML20217B88324 March 1998VogtleSER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program PlanBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure boundary leak
ML20203H87428 February 1998Title List of Documents Made Publicly Available.December 1-31, 1997
ML20217E73224 February 1998McguireRev 0 to ISI Rept,Unit 2 McGuire 1997 Refueling Outage 11Hydrostatic
Dissimilar Metal Weld
ML20202C47130 January 1998LimerickForwards Summary of ISI Interval ISI Program Request for Relief from Certain ASME Code Requirements,List of ASME Code Cases & Result of Util Review of Current ASME Section XI Bases Describes in First & Second Insp Interval ISI ProgramHydrostatic
Nondestructive Examination
VT-2
Liquid penetrant
ML20217K46230 January 1998SequoyahTechnical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Tva,Sequoyah Nuclear Plant,Units 1 & 2Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure boundary leak
Through Wall Leak
Scaffolding
ML18022B03526 January 1998HarrisRev 0 to Procedure HNP-ISI-002, Shearon Harris Nuclear Power Plant,Isi Program Plan,2nd Interval.Boric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Eddy Current Testing
Liquid penetrant
Dissimilar Metal Weld
Thermal fatigue
ML20199C12313 January 1998ByronSafety Evaluation Granting Second 10-yr Inservice Insp Program Plan Relief RequestBoric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Scaffolding
ML20198R47713 January 1998Davis BesseSER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
Through-Wall Leak
ML17229A61412 January 1998Saint LucieRev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1.Boric Acid
Shutdown Margin
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Moisture barrier
Liquid penetrant
Dissimilar Metal Weld
Scaffolding
ML20199G5666 January 1998FitzPatrickRev 0 to JAF-ISI-0002, Third ISI Interval,Isi Program. W/28 Oversize DrawingsPacking leak
Non-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Moisture barrier
EVT-1
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
Scaffolding
PY-CEI-NRR-2244, Forwards Relief Request IR-031 for Approval to Use ASME Code Case N-524 as Alternative to ASME Section XI Code Requirements at Plant by 980518.Approval Will Facilitate close-out of First 10-year Insp Interval Which Ends 98111818 December 1997PerryForwards Relief Request IR-031 for Approval to Use ASME Code Case N-524 as Alternative to ASME Section XI Code Requirements at Plant by 980518.Approval Will Facilitate close-out of First 10-year Insp Interval Which Ends 981118
ML18150A46616 December 1997SurryISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2VT-2
Liquid penetrant
ML20199H37119 November 1997Grand Gulf
Arkansas Nuclear
River Bend
Waterford
SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50Nondestructive Examination
VT-2
Incorporated by reference
ML20212E08123 October 1997CooperSER Accepting Third 10-yr Interval Insp Program Plan & Associated Requests for Relief for PlantBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure boundary leak
Through-Wall Leak
B16672, Provides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in Ltr28 August 1997MillstoneProvides Response to Second Request for Addl Info Re Third 10-year Interval ISI Program Plan as Requested by 970611 NRC Ltr.Listed Commitments Contained in LtrSafe Shutdown
Hydrostatic
Nondestructive Examination
VT-2
Scaffolding
HL-5437, Forwards Revs to Ei Hatch GL 88-01 & NUREG-0313 Commitments Re Third 10-year Interval Inservice Insp Program30 July 1997HatchForwards Revs to Ei Hatch GL 88-01 & NUREG-0313 Commitments Re Third 10-year Interval Inservice Insp ProgramWeld Overlay
Nondestructive Examination
Dissimilar Metal Weld
ML20148Q2571 July 1997WaterfordRev 0 to Entergy Operations Waterford-3 Steam Electric Station ISI Plan Second 10-Yr IntervalNon-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Dissimilar Metal Weld
ML18150A4449 June 1997SurryVol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003.VT-2
ML20140F60531 May 1997Title List of Documents Made Publicly Available.March 1-31, 1997Hot Short
Safe Shutdown
Boric Acid
Fitness for Duty
Reactor Vessel Water Level
Coatings
VT-2
Earthquake
Backfit
ML20148E52421 May 1997VogtleInservice Insp Program Second 10-yr Interval, Rev 0Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
Scaffolding
ML20137T9949 April 1997SeabrookSafety Evaluation Accepting Proposed Use of ASME Code Case N-524 for North Atlantic Energy Service Corp,Seabrook Station,Unit 1Incorporated by reference
ML20137T9939 April 1997Forwards SE Re 961022 Request for Approval for Use of Alternative Rules of ASME Boiler & Pressure Vessel Code, Section XI Code Case N-524.Based on Evaluation,Request Accepted Pursuant to 10CFR50.551(a)(3)(i)
ML20137T9879 April 1997SeabrookForwards SE Re 961022 Request for Approval for Use of Alternative Rules of ASME Boiler & Pressure Vessel Code, Section XI Code Case N-524.Based on Evaluation,Request Accepted Pursuant to 10CFR50.551(a)(3)(i)
L-96-034, TER on Third 10-Yr Interval ISI Program Plan:Nppd Cns31 March 1997CooperTER on Third 10-Yr Interval ISI Program Plan:Nppd CnsBoric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Pressure boundary leak
Through Wall Leak
ML20136F8507 March 1997Davis BesseRequests Relief from Certain ASME Code Requirements for Inservice Testing & Insp for Plant.Relief Request RR-A14 Requests Relief from Section XI of ASME Code,1896 Edition for Exam of Class 1,2 & 3 Integrally Welded AttachmentsHydrostatic
Pressure Boundary Leakage
ML17229A2535 March 1997Saint LucieRequests Approval to Incorporate Code Case N-524, Alternative Exam Requirements for Longitudinal Welds in Class 1 & 2 Piping Section Xi,Div 1.Scaffolding