Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20042H010 | 4 April 1990 | Forwards Special Instructions Forwarded to Utils Re X-SAM Sys for Nuclear safety-related Cranes.Instructions Describe Actions for Making Critical Lifts Before Retrofit of Slide Device | |
ML20196E162 | 29 November 1988 | Requests That Proprietary Addendum 2 to Rev 1 to WCAP-10924-P, Westinghouse Large Break LOCA Best Estimate Methodology... Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20206F881 | 14 November 1988 | Requests That WCAP-12042 Be Withheld from Public Disclosure Per 10CFR2.790 | |
ML20155F444 | 4 May 1988 | Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104 | |
ML20147C661 | 16 December 1987 | Requests That Point Beach Unit 2 Evaluation for Vibration Induced Fatigue Be Withheld from Public Disclosure (Ref 10CFR2.790) | |
ML20236T001 | 20 November 1987 | Requests That Proprietary Rept Entitled Point Beach Unit 2 Steam Generator Tube Fatigue Presentation Be Withheld from Public Disclosure (Ref 10CFR2.790(b)(4)).Affidavit Encl | |
ML20237E372 | 16 October 1987 | Requests That Proprietary WCAP 11573, Point Beach Unit 2 Steam Generator Sleeving Rept (Mechanical Sleeves) Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4). Affidavit Encl | |
ML20215L059 | 22 June 1987 | Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl | Hot Short Exemption Request |
NRC-86-3181, Forwards Listed Nonproprietary Documents Re Rod Cluster Control Assembly Performance,Per Request.Topical Rept WCAP-8183, Operational Experience W/Westinghouse Cores Issued for Input to NRC Annual Fuel Performance Rept | 25 November 1986 | Forwards Listed Nonproprietary Documents Re Rod Cluster Control Assembly Performance,Per Request.Topical Rept WCAP-8183, Operational Experience W/Westinghouse Cores Issued for Input to NRC Annual Fuel Performance Rept | |
ML20116A148 | 16 April 1985 | Requests Proprietary Upper Plenum Injection LOCA Program Using SECY-83-472 Methodology Be Withheld (Ref 10CFR2.790) | |
ML20100G206 | 29 November 1984 | Responds to Re Navco BE415 Sway Struts.Four Sway Struts Purchased from Basic Engineers on 800326 & Shipped to Facility on 800828 | |
ML20095F318 | 7 August 1984 | Requests Proprietary Responses to NRC Questions Re Optimized Fuel Assembly Design Be Withheld (Ref 10CFR2.790).Affidavit Encl | |
ML20073Q292 | 27 April 1983 | Authorizes Utilization of Encl Affidavit Supporting Request to Withhold Info Re Steam Generator Repair from Public Disclosure,Per 10CFR2.790 | |
ML20204F812 | 13 April 1983 | Forwards Affidavit AW-80-27 in Support of Request to Withhold Proprietary Info Re Effect of Radiation on Insulating Matls in Westinghouse Medium Motor Per 10CFR2.790 Re Encl Util Draft | |
ML20070U794 | 4 February 1983 | Memorializes 830131 Telcon Resolving Open Procedural Question Re Inadvertent Use of Proprietary Data in Responding to ASLB & Wi Environ Decade Exam | |
ML20062A772 | 15 July 1982 | Submits Application for Withholding Supplemental Info to WCAP-9960, Point Beach Nuclear Plant Steam Generator Sleeving Rept. Affidavit (AW-80-53) Encl | |
ML20054M764 | 7 July 1982 | Memorializes 820707 Telcon.Westinghouse Will Require Until 820722 to Provide Info to Be Released Per ASLB 820526 Memorandum & Order | |
ML20054L515 | 29 June 1982 | Advises That Westinghouse Will Make Info Available Per ASLB 811221 & 0526 Memoranda & Orders.Discussions on How to Accomplish Task Underway | |
ML20054L245 | 28 June 1982 | Requests Withholding Per 10CFR2.790 of Supplementary Info to Steam Generator Sleeve Rept.Pages Withheld (Ref 10CFR2.790) | |
ML20054K496 | 23 June 1982 | Informs That Vendor Will Not Appeal from or File Exceptions to ASLB 820517 Memorandum & Order & to Interlocutory Orders Re Vendor Proprietary Info at This Time | |
ML20052D806 | 3 May 1982 | Advises That Westinghouse Will Not File Reply Brief in Response to Wi Environ Decade Brief.Svc List Encl | |
ML20054C579 | 6 April 1982 | Authorizes Utilization of Affidavit AW-80-53 to Justify Withholding of Reissued Revision 1 to Point Beach Steam Generator Sleeving Rept. | |
ML20050B891 | 30 March 1982 | Forwards RA Wiesemann & Ta Christopher 820329 Affidavits Re 820225 & 0323 Testimony.Svc List Encl.Related Correspondence | |
ML20049K100 | 23 March 1982 | Forwards RA Wiesemann Supplemental Prefiled Testimony. Related Correspondence | |
ML20042A841 | 19 March 1982 | Informs That Westinghouse Rept, Point Beach Steam Generator Sleeving Rept,WCAP-9960,Revision 1 (Proprietary),WCAP-9960, Revision 1, Was Incorrectly Marked.Entire Rept Should Be Considered Proprietary.Corrected Version to Be Sent 820322 | |
ML20042A948 | 4 March 1982 | Authorizes Utilization of Affidavits AW-80-32 & AW-80-53 to Justify Withholding of Revision 1 to Point Beach Steam Generator Sleeving Rept. | |
ML20039D736 | 28 December 1981 | Confirms 811221,23 & 28 Telcons Re Due Date for Westinghouse Actions Per ASLB 811221 Memorandum & Order.Due to Unavailability of Key People,Date for Westinghouse to Respond to Order Revised Until 811231 | |
ML20039B538 | 17 December 1981 | Forwards Westinghouse Reply Brief in Issue of ASLB Jurisdiction to Decline to Afford Proprietary Info Protection from Public Disclosure | |
ML18043B145 | 20 March 1979 | Forwards Proprietary Rept NEDE-23749-1-P, Comparison of Analytical Model for Computing Safety Relief Valve Discharge Line Transient Pressures & Forces to Monticello T-Quencher Test Data. Withheld (Ref 10CFR2.790) |