 Issue dateTitleTopic
ML20155F4444 May 1988Responds to NRC & Request at 880504 Meeting Describing GE Program to Reconfirm Design Adequacy of Associated Circuits in GE Bwrs.Upon Completion of Phases 1 & 2 of Evaluation of Bwrs,Ge Will Submit Summary by 881104
ML20215B1239 June 1987Confirms That Methodologies in XN-NF-79-71,Rev 2,Nov 1981 & Util to NRC Acceptable for Application for Facility Cycle 3 Transients.Nrc Acceptance Will Be Assumed If No NRC Exceptions Received by 870710
ML20214P19119 November 1986Forwards Proprietary NEDC-31336, GE Instrument Setpoint Methodology, Per Lrg Instrument Setpoint Methodology Group .Rept Applicable to Listed Plants & Withheld (Ref 10CFR2.790)
ML20100G06114 March 1985Corrects 850312 Part 21 Rept Re Potential Problem W/Check Valve.Mississippi Power & Light Did Not Perform Low Pressure Injection Insp of Valve Disk.Valves Supplied by Cloy Corps & William Gauge Co
ML20203A07519 November 1984Forwards Notification Ltr Re Problem W/Model C Deluge Valve Which May Affect Fire Protection Sprinkler Sys to Be Mailed to Utils W/Permits to Build & Licenses to Operate Nuclear Power Plants
ML20091L7914 June 1984Responds to IE Info Notice 84-16, Failure of Automatic Sprinkler Sys Valves to Operate. No Design or Mfg Faults Exist in Model C Deluge Valves.Maint Procedure Revised Requiring Smoother Surfaces on New & Existing Valves
ML20070C76310 December 1982Part 21 Rept Re Problem W/Brown Boveri Electric,Inc Low Voltage Circuit Breakers W/Solid State Trip Devices.Units from San Onofre 2 & 3 Failed Due to long-term Degradation of Filter Capacitor C205.Suspect Trip Units Should Be Tested
ML20040D64815 January 1982Forwards Affidavit Requesting Withholding of Proprietary Version of OPS-37A35, Verification of CLASIX-3 Computer Program.
ML20040H51622 December 1981Confirms 811202 Telcon Re Teflon Coating on Shell Id of Aftercooler.Aftercooler Used to Lower Gas Discharge Temp of Drywell Purge Compressor Supplied by Atlas Copco Turbonetics,Inc for Installation of Bechtel Piping Sys
ML19312E7204 April 1980Informs NRC of Possible Defective Matl Shipment to Power Plant.Notification Was Received Per Encl Vendor 800402 Ltr
ML19310A3773 April 1980Notifies NRC of Defective Comsip,Inc Containment Gas Analysis Sys.During Testing,Pump K Deadheaded for Approx 20-s & Pressure at Pump Outlet Exceeded 150 Psig.Pump Discharge Bypass Line to Be Fitted
ML19257B2727 January 1980Forwards Chart Listing Revised Natural Frequency for Valves Supplied to Util.Frequencies Not Yet Available Will Be Evaluated by 800121.Advises of Evaluation of Corrective Action & Lists Valve Evaluation Procedure
ML19262A68630 November 1979Forwards Initial Questions Re FSAR in Response to 791115 Discussion.Requests NRC Assistance in Obtaining Answers to All QuestionsSafe Shutdown
Overspeed trip
ML19210C4677 November 1979Forwards Questions Re Electric Power,Developed During Initial Review of Section 8.1 of FSAR
ML19270H06811 May 1979Responds to IE Bulletins 78-12,12A & 12B Re Reactor Pressure Vessel Welds.No Discrepancies Noted
ML20054E23217 November 1977Forwards Prototype Qualification Test Program for NRC Review.Tests Simulating Typical HPCS Sys Configuration Scheduled for Second Quarter 1978