Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22333A820 | 30 November 2022 | Defueled Safety Analysis Report, Revised November 2022 | |
ML20343A227 | 24 November 2020 | Submittal of Defueled Safety Analysis Report, Revised November 2020 | Aging Management |
ML20343A226 | 24 November 2020 | Defueled Safety Analysis Report, Revised November 2020 | Safe Shutdown Boric Acid Loop seal High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Incorporated by reference Tornado-Generated Missile Tornado Generated Missile Design basis earthquake Earthquake Fire Protection Program |
ML19011A209 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 4, Reactor | Fuel cladding |
ML19011A210 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | |
ML19011A215 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 10, Steam and Power Conversion System | |
ML19011A211 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 6, Engineered Safety Features | |
ML19011A212 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid |
ML19011A205 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Appendices 2.5L Through 2.5T | Design basis earthquake Earthquake |
ML19011A206 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 2, Site Characteristics | High winds Offsite Dose Calculation Manual Hydrostatic Met Tower Operating Basis Earthquake Design basis earthquake Earthquake |
ML19011A202 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Appendices 2.3A Through 2.5B | |
ML19011A201 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Ultimate heat sink Incorporated by reference Design basis earthquake |
ML19011A203 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Appendices 2.5C Through 2.5K | |
ML19011A208 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Tornado Missile Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Finite Element Analysis FLEX Tornado Generated Missile Tornado Missile Protection Design basis earthquake Earthquake Weak link |
ML19011A214 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Tornado Missile Time to boil Hydrostatic Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Control of Heavy Loads Fuel cladding Siren Overexposure |
ML19011A213 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 8, Electric Power | |
ML19011A216 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Loop seal Offsite Dose Calculation Manual Anticipated operational occurrence |
ML19011A399 | 6 December 2018 | Submittal of Revision 4 to Defueled Safety Analysis Report | |
ML19011A226 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Master Contents | Finite Element Analysis Earthquake |
ML19011A225 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 9A Redacted | |
ML19011A224 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 17, Quality Assurance | |
ML19011A223 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 16, Technical Specifications | |
ML19011A221 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 15, Accident Analyses | Earthquake |
ML19011A220 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 15, Appendix 15G, Dose Models Used to Evaluate the Consequences of Accidents Analyzed with the Alternative Source Term Methodology | Deep Dose Equivalent |
ML19011A219 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 14, Initial Test Program | |
ML19011A218 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 13, Conduct of Operations | Minimum staff |
ML19011A217 | 6 December 2018 | Revision 4 to Defueled Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Grab sample Coatings Recently irradiated fuel |
ML16357A393 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 12, Radiation Protection | High Radiation Area Grab sample Coatings Recently irradiated fuel |
ML16357A398 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 16, Technical Specifications | |
ML16357A395 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 14, Initial Test Program | |
ML16357A286 | 15 December 2016 | Transmittal of Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report | |
ML16357A303 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 9 - Appendix 9A | |
ML16357A391 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 10, Steam and Power Conversion System | |
ML16357A298 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | |
ML16357A300 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 6, Engineered Safety Features | |
ML16357A301 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid |
ML16357A302 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 8, Electric Power | |
ML16357A394 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 13, Conduct of Operations | Minimum staff |
ML16357A396 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 15, Appendix 15G Dose Models | Deep Dose Equivalent |
ML16357A297 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 4, Reactor | Fuel cladding |
ML16357A397 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 15, Accident Analyses | Earthquake |
ML16357A400 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Summary of Changes | Safe Shutdown Boric Acid Ultimate heat sink |
ML16357A402 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Master Table of Contents | Finite Element Analysis Earthquake |
ML16357A392 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Loop seal Offsite Dose Calculation Manual Anticipated operational occurrence |
ML16357A304 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Tornado Missile Time to boil Hydrostatic Nondestructive Examination Emergency Lighting Tornado-Generated Missile Design basis earthquake Control of Heavy Loads Fuel cladding Siren Overexposure |
ML16357A290 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Ultimate heat sink Incorporated by reference Design basis earthquake |
ML16357A293 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 2, Site Characteristics, Appendices 2.5L Through 2.5T | Design basis earthquake Earthquake |
ML16357A294 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 2, Site Characteristics | High winds Offsite Dose Calculation Manual Hydrostatic Met Tower Operating Basis Earthquake Design basis earthquake Earthquake |
ML16357A295 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Tornado Missile Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Finite Element Analysis FLEX Tornado Generated Missile Tornado Missile Protection Design basis earthquake Earthquake Weak link |
ML16357A292 | 15 December 2016 | Revised Updated Final Safety Analysis Report/Defueled Safety Analysis Report, Chapter 2, Site Characteristics, Appendices 2.5C Through 2.5K |