Submittal of Revision 4 to Defueled Safety Analysis Report
ML19011A399
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/06/2018
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19011A401 List:
References
Download: ML19011A399 (7)


Text

Al Bates

[LI E"i5"iSO'N*

An EDISON INTERNATIONAL !i Company Manager, Regul atory Affairs &

Overs ight 10 CFR 50.71 December 6, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Updated Final Safety Analysis Report / Defueled Safety Analysis Report, Revised November, 2018 San Onofre Nuclear Generating Station, Units 2 and 3 References :

1) Letter from T. J . Palmisano (SCE) to U. S. Nuclear Regulatory Commission (Document Control Desk) dated December 15, 2016,

Subject:

Docket Nos . 50-361 and 50-362, Updated Final Safety Analysis Report/ Defueled Safety Analysis Report, Revised November, 2016, San Onofre Nuclear Generating Station, Units 2 and 3

2) NRC Regulatory Issue Summary 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents"

Dear Sir or Madam :

In accordance with the requirements of 10 CFR 50.71(e), Southern California Edison (SCE) submits the revision to the Updated Final Safety Analysis Report (UFSAR) for San Onofre Nuclear Generating Station (SONGS), Units 2 and 3. All UFSAR changes reflecting SONGS Units 2 and 3 that were approved prior to October 1, 2018 have been incorporated.

Consistent with the regulations contained in 10 CFR 50. 71 (e ), this update is being provided within 24 months following the previous update submitted on December 15, 2016 (Reference 1 ).

The changes to the FSAR/DSAR update is being provided in total on CD with revised sections noted , satisfying the electronic submittal requirements on 10 CFR 50.4(b )(6) as discussed in Reference 2. A summary of changes for the UFSAR/DSAR is provided in Attachment 1.

Enclosures 1 and 2 are disks containing the SONGS Units 2 and 3 FSAR/DSAR. Enclosure 1 of this submittal contains information that is deemed security-related sensitive information, and the files are requested to be withheld from public disclosure in accordance with 10 CFR 2.390.

Enclosure 2 provides the redacted version of Enclosure 1.

Security-Related Information -

Withhold Under 10 CFR 2.390 Decontrolled Upon Removal of Enclosure 1

~ Ei5'iSCi'N*

Al Bates Man ager, Regulatory Affairs &

Oversight An EDISON INTERNATJONAL l Company There are no commitments contained in this letter or its enclosures .

Should you have any questions or require additional information, please contact me at 949-368-6945.

Sincerely, Enclosure 1: Compact Disk, San Onofre Nuclear Generating Station Units 2 and 3 UFSAR/DSAR, Amended November 2016, Security-Related Information - Withhold Under 10 CFR 2.390 Enclosure 2: Compact Disk, San Onofre Nuclear Generating Station Units 2 and 3 UFSAR/DSAR, Amended November 2016, Redacted 10 CFR 2.390 Attachment 1: Summary of Changes in the Updated Final Safety Analysis Report/Defueled Safety Analysis Report Attachment 2: Preflight Status Report cc: K. Kennedy, Regional Administrator, NRC Region IV M. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 I. Schneider, California Department of Public Health, Radiologic Health Branch Security-Related Information -

Withhold Under 10 CFR 2.390 Decontrolled Upon Removal of Enclosure 1

ENCLOSURE 1 San Onofre Nuclear Generating Station Units 2 & 3 Defueled Safety Analysis Report (DSAR)

November 2018 Security-Related Information -Withhold Under 10 CFR 2.390 11 INFORMATION ONLY NOT CONTROLLED *-

-l'- I*

I Security Related Information I I Withhold Under IO CFR 2.390

ENCLOSURE 2 San Onofre Nuclear Generating Station Units 2 & 3 Defueled Safety Analysis Report (DSAR)

November 2018 Redacted 10 CFR 2.390 1J 1 1

11 11  : I

) ,*

I \1 I

I/ I L I l 1 I

I

,I INFORMATION ONLY NOT CONTR9LLED I 1 I I REDACTED I Withhold Under 10 CFR 2.390 I'

Document Control Desk Attachment 1 Summary of Changes in the Updated Final Safety Analysis Report/

Defueled Safety Analysis Report

1. Chapter 9 Section 9'. 1 Cask handling crane safe load path feature changes Section 9.1 Inclusion of cask storage pool upper shelf purification equipment Section 9.1 Clarification of spent fuel cask drop height Section 9.1 ISFSI Expansion licensing and operations changes Section 9.1 Reduction in low operating temperature limit for cask handling crane bridge Section 9.1.2 Remove criticality analysis for NUHOMS and Hi-Storm casks Section 9.2 Saltwater dilution pumps' strainer material change Section 9.3 Post Cold & Dark removal of Unit 2 diesel generator building sump pump Section 9.5 Reflect removal of electrical power to the containment strobe lights
2. Chapter 9A Section 9A.2 Provision to supply air to Spent Fuel Pool gates Section 9A.2.9 Inclusion of cask storage pool upper shelf purification equipment Section 9A.3.4 Inclusion of cask storage pool upper shelf purification equipment
3. Chapter 11 Section 11 .1 Temporary storage of filtration and demineralizers
4. Chapter 12 Section 12.0 SCE organizational and programmatic responsibility changes
5. Chapter 13 Section 13.1 SCE organizational and programmatic responsibility changes Section 13.5 SCE organizational and programmatic responsibility changes
6. Chapter 15 Section 15.1 Multi-purpose canister cask drop dose analysis changes

Document Control Desk Attachment 2 Preflight Report for SONGS Units 2 and 3 UFSAR/DSAR Files, Amended November 2018 Preflight Reference Document Name File Name (PDF) File Size (kb)

Status SONGS Units 2 & 3 DSAR Chapter 1 Introduction and General Description of SONGS 23 UFSAR DSAR Passed 9,846 Plant Chapter O1 Rev 4 SONGS 23 UFSAR DSAR SONGS Units 2 & 3 DSAR Chapter 2 Chapter 02 Rev 4 Passed 13,102 Site Characteristics Text and Figures SONGS 23 UFSAR DSAR SONGS Units 2 & 3 DSAR Chapter 2 Chapter 02 Rev 4 Site Characteristics Appendices 2.3A through Passed 44,692 Appendices 2.3A through 2.5B 2.5B SONGS Units 2 & 3 DSAR Chapter 2 SONGS 23 UFSAR DSAR Site Characteristics Chapter 02 Rev 4 Passed 42,771 Soil Borings Appendices 2.5C through Appendices 2.5C through 2.5K 2.5K SONGS 23 UFSAR DSAR SONGS Units 2 & 3 DSAR Chapter 2 Chapter 02 Rev 4 Site Characteristics Passed 12,278 Appendices 2.5L through Appendices 2.5L through 2.5T 2.5T SONGS Units 2 & 3 DSAR Chapter 3 SONGS 23 UFSAR DSAR Design of Structures, Components, Passed 16,724 Chapter 03 Rev 4 Equipment and System SONGS Units 2 & 3 DSAR Chapter 4 SONGS 23 UFSAR DSAR Passed 269 Reactor Chapter 04 Rev 4 SONGS Units 2 & 3 DSAR Chapter 5 SONGS 23 UFSAR DSAR Reactor Coolant System and Connected Passed 201 Chapter 05 Rev 4 Systems SONGS Units 2 & 3 DSAR Chapter 6 SONGS 23 UFSAR DSAR Passed 205 Engineered Safety Features Chapter 06 Rev 4 SONGS Units 2 & 3 DSAR Chapter 7 SONGS 23 UFSAR DSAR Passed 221 Instrumentation and Controls Chapter 07 Rev 4 SONGS Units 2 & 3 DSAR Chapter 8 SONGS 23 UFSAR DSAR Passed 194 Electric Power Chapter 08 Rev 4 SONGS Units 2 & 3 DSAR Chapter 9 SONGS 23 UFSAR DSAR Passed 4,988 Auxiliary Systems Chapter 09 Rev 4

Document Control Desk Preflight Reference Document Name File Name (PDF) File Size (kb)

Status SONGS Units 2 & 3 DSAR Appendix 9A San Onofre 2 & 3 Alignment with SONGS 23 UFSAR DSAR NUREG-1738 Chapter 9A Rev 4 Passed 284 SONGS Units 2 & 3 DSAR Appendix SONGS 23 UFSAR DSAR 9A Chapter 9A Rev 4 Passed 175 San Onofre 2 & 3 Alignment with REDACTED NUREG-1738 SONGS Units 2 & 3 DSAR Chapter 10 SONGS 23 UFSAR DSAR Passed 158 Steam and Power Conversion System Chapter 10 Rev 4 SONGS Units 2 & 3 DSAR Chapter 11 SONGS 23 UFSAR DSAR Passed 1,490 Radioactive Waste Management Chapter 11 Rev 4 SONGS Units 2 & 3 DSAR Chapter 12 SONGS 23 UFSAR DSAR Passed 245 Radiation Protection Chapter 12 Rev 4 SONGS Units 2 & 3 DSAR Chapter 13 SONGS 23 UFSAR DSAR Passed 128 Conduct of Operations Chapter 13 Rev 4 SONGS Units 2 & 3 DSAR Chapter 14 SONGS 23 UFSAR DSAR Passed 146 Initial Test Program Chapter 14 Rev 4 SONGS Units 2 & 3 DSAR Chapter 15 SONGS 23 UFSAR DSAR Passed 314 Accident Analyses Chapter 15 Rev 4 SONGS Units 2 & 3 DSAR Appendix SONGS 23 UFSAR DSAR 15G Chapter 15 Appendix 15G Passed 264 Dose Models Rev4 SONGS Units 2 & 3 DSAR Chapter 16 SONGS 23 UFSAR DSAR Passed 104 Technical Specifications Chapter 16 Rev 4 SONGS Units 2 & 3 DSAR Chapter 17 SONGS 23 UFSAR DSAR Topical Report SCE-1 Quality Passed 146 Chapter 17 Rev 4 Assurance Program