Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-2019-188, CFR 50.59(d)(2) Summary Report of Changes, Test and Experiments October 29, 2017 to April 11, 20197 October 2019CFR 50.59(d)(2) Summary Report of Changes, Test and Experiments October 29, 2017 to April 11, 2019Safe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Hydrostatic
Temporary Modification
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Exemption Request
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
ML17088A32412 April 2018COL Appendix C, ITAAC, Attachment 1
ML17088A32112 April 2018COL Appendix C, ITAACSafe Shutdown
Boric Acid
Health Physics Network
Loop seal
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Squib
Emergency Lighting
Tornado Generated Missile
Open Phase Condition
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Offsite Circuit
Flow Induced Vibration
L-2016-199, 10 CPR 50.59(d)(2) Summary of Changes, Tests, and Experiments Evaluation Report for the Period 10/22/2014 - 04/29/201631 October 201610 CPR 50.59(d)(2) Summary of Changes, Tests, and Experiments Evaluation Report for the Period 10/22/2014 - 04/29/2016Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Anticipated operational occurrence
Hydrostatic
Temporary Modification
FLEX
Missed surveillance
Surveillance Frequency Control Program
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
L-2013-276, Submittal of Summary Report of Changes, Tests and Experiments to 10 CFR 50.59(d)(2) for May 16, 2011 to April 17, 201311 October 2013Submittal of Summary Report of Changes, Tests and Experiments to 10 CFR 50.59(d)(2) for May 16, 2011 to April 17, 2013Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Time to boil
Hydrostatic
Met Tower
Temporary Modification
Missed surveillance
Operability Determination
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Grace period
Power change
Coast down
Unidentified leakage
Power Uprate
L-2004-108, CFR 50.59 Report3 May 2004CFR 50.59 ReportSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Hydrostatic
Emergency Lighting
Locked High Radiation Area
Missed surveillance
Foreign Material Exclusion
Operability Determination
Earthquake
Power-Operated Valves
Power Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Recently irradiated fuel
Continuous fire watch
Scaffolding
Grace period
Power change
Downpower
Coast down
Unidentified leakage