Issue date | Title | Topic | |
---|---|---|---|
ML17284A900 | 31 October 1999 | Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR | |
GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With | 1 October 1999 | LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With | |
ML17284A894 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr | |
ML20217E269 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With | |
ML18107A557 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr | Safe Shutdown Temporary Modification Coast down |
ML18107A558 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr | Safe Shutdown Temporary Modification |
ML20217G152 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20212D071 | 14 September 1999 | Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Earthquake |
ML20212A336 | 14 September 1999 | 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included | |
ML20211N045 | 2 September 1999 | Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding | Safe Shutdown Power-Operated Valves Backfit |
ML20211N016 | 2 September 1999 | Safety Evaluation Supporting GL 95-07 to License NPF-42 | Safe Shutdown Power-Operated Valves Backfit |
ML18107A530 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr | Safe Shutdown Temporary Modification |
ML18107A531 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 | Safe Shutdown Temporary Modification Coast down |
ML20212A025 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With | |
ML17284A880 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr | |
ML20212A020 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With | |
ML20217P645 | 30 August 1999 | Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer Approved | Backfit |
ML18107A503 | 26 August 1999 | LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr | Time of Discovery Offsite Dose Calculation Manual |
ML18107A520 | 12 August 1999 | Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). | VT-2 |
ML20210P044 | 10 August 1999 | Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20210Q833 | 5 August 1999 | Rev 4 to Callaway Cycle 10 Colr | |
ML20210T948 | 3 August 1999 | Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 | Probabilistic Risk Assessment Large early release frequency |
ML17284A869 | 31 July 1999 | Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr | |
ML20210T445 | 31 July 1999 | Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With | |
ML20216D879 | 31 July 1999 | Rev 3 to Callaway Cycle 10 Colr | |
ML18107A481 | 31 July 1999 | Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr | Safe Shutdown Temporary Modification |
ML18107A482 | 31 July 1999 | Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr | Safe Shutdown Temporary Modification |
ML20210R574 | 31 July 1999 | Monthly Operating Rept for July 1999 for Wolf Creek Generating Station | |
ML20210H653 | 30 July 1999 | SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 | Boric Acid High Radiation Area Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20210J156 | 29 July 1999 | Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts Rept | Hydrostatic Pressure and Temperature Limits Report |
ML18107A469 | 28 July 1999 | LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr | Hot Short Safe Shutdown Fire Barrier Fire Protection Program Hourly Fire Watch |
ML17292B742 | 20 July 1999 | LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr | |
ML18107A444 | 6 July 1999 | LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr | Missed surveillance |
ML18107A421 | 2 July 1999 | LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr | Enforcement Discretion Large early release frequency |
ML18107A432 | 1 July 1999 | LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr | Time of Discovery |
ML18107A433 | 1 July 1999 | LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr | Time of Discovery |
ML18107A521 | 1 July 1999 | Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). | Hydrostatic VT-2 |
ML18107A434 | 30 June 1999 | Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr | Safe Shutdown Temporary Modification |
ML18107A435 | 30 June 1999 | Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr | Safe Shutdown Temporary Modification |
ML20210R592 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station | |
ML20209H082 | 30 June 1999 | Monthly Operating Rept for June 1999 for Wolf Creek Generating Station | |
ML17292B727 | 30 June 1999 | Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20209H088 | 30 June 1999 | Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With | |
ML18107A395 | 17 June 1999 | LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr | |
ML18107A366 | 9 June 1999 | LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr | |
ML18107A355 | 2 June 1999 | LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr | Time of Discovery |
ML20195D526 | 2 June 1999 | Safety Evaluation Approving Proposed ISI Program Alternative for Limited Reactor Vessel Shell Weld Exams & Relief Request from Requirements of ASME Code,Section XI | Nondestructive Examination Incorporated by reference |
ML18107A354 | 1 June 1999 | LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr | Time of Discovery |