ML17284A90031 October 1999Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR
GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1 October 1999LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With
ML17284A89430 September 1999Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr
ML20217E26930 September 1999Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With
ML18107A55730 September 1999Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 LtrSafe Shutdown
Temporary Modification
Coast down
ML18107A55830 September 1999Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 LtrSafe Shutdown
Temporary Modification
ML20217G15230 September 1999Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20212D07114 September 1999Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident VulnerabilitiesHot Short
Safe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Earthquake
ML20212A33614 September 19991999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included
ML20211N0452 September 1999Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & BindingSafe Shutdown
Power-Operated Valves
Backfit
ML20211N0162 September 1999Safety Evaluation Supporting GL 95-07 to License NPF-42Safe Shutdown
Power-Operated Valves
Backfit
ML18107A53031 August 1999Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 LtrSafe Shutdown
Temporary Modification
ML18107A53131 August 1999Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913Safe Shutdown
Temporary Modification
Coast down
ML20212A02531 August 1999Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With
ML17284A88031 August 1999Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr
ML20212A02031 August 1999Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With
ML20217P64530 August 1999Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer ApprovedBackfit
ML18107A50326 August 1999LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 LtrTime of Discovery
Offsite Dose Calculation Manual
ML18107A52012 August 1999Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF).VT-2
ML20210P04410 August 1999Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20210Q8335 August 1999Rev 4 to Callaway Cycle 10 Colr
ML20210T9483 August 1999Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1Probabilistic Risk Assessment
Large early release frequency
ML17284A86931 July 1999Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr
ML20210T44531 July 1999Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With
ML20216D87931 July 1999Rev 3 to Callaway Cycle 10 Colr
ML18107A48131 July 1999Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 LtrSafe Shutdown
Temporary Modification
ML18107A48231 July 1999Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 LtrSafe Shutdown
Temporary Modification
ML20210R57431 July 1999Monthly Operating Rept for July 1999 for Wolf Creek Generating Station
ML20210H65330 July 1999SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1Boric Acid
High Radiation Area
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Scaffolding
ML20210J15629 July 1999Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts ReptHydrostatic
Pressure and Temperature Limits Report
ML18107A46928 July 1999LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 LtrHot Short
Safe Shutdown
Fire Barrier
Fire Protection Program
Hourly Fire Watch
ML17292B74220 July 1999LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr
ML18107A4446 July 1999LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 LtrMissed surveillance
ML18107A4212 July 1999LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 LtrEnforcement Discretion
Large early release frequency
ML18107A4321 July 1999LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 LtrTime of Discovery
ML18107A4331 July 1999LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 LtrTime of Discovery
ML18107A5211 July 1999Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF).Hydrostatic
VT-2
ML18107A43430 June 1999Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 LtrSafe Shutdown
Temporary Modification
ML18107A43530 June 1999Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 LtrSafe Shutdown
Temporary Modification
ML20210R59230 June 1999Revised Monthly Operating Rept for June 1999 for Wolf Creek Generating Station
ML20209H08230 June 1999Monthly Operating Rept for June 1999 for Wolf Creek Generating Station
ML17292B72730 June 1999Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20209H08830 June 1999Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With
ML18107A39517 June 1999LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr
ML18107A3669 June 1999LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr
ML18107A3552 June 1999LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 LtrTime of Discovery
ML20195D5262 June 1999Safety Evaluation Approving Proposed ISI Program Alternative for Limited Reactor Vessel Shell Weld Exams & Relief Request from Requirements of ASME Code,Section XINondestructive Examination
Incorporated by reference
ML18107A3541 June 1999LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 LtrTime of Discovery