Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K123 | 14 October 1999 | Revised Positions for DBNPS & Pnpp QA Program | Offsite Dose Calculation Manual Coatings Nondestructive Examination Process Control Program Fire Protection Program |
ML20212J201 | 30 September 1999 | Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico | |
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | |
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | |
NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | 9 August 1999 | SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | Incorporated by reference |
PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Perry Npp.With | |
ML20210J385 | 28 July 1999 | Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second Interval | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20196A195 | 17 June 1999 | Instrument Drift Analysis | |
ML20207G274 | 7 June 1999 | Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in Application | Weld Overlay |
PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With | |
PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored | 12 May 1999 | Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored | Post Accident Monitoring |
ML20206G645 | 3 May 1999 | Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp | Coatings Nondestructive Examination |
PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20206E226 | 29 April 1999 | Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514 | Non-Destructive Examination Weld Overlay Dissimilar Metal Weld |
ML20206D791 | 23 April 1999 | Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7 | |
ML20205P437 | 15 April 1999 | Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal Binding | Power-Operated Valves Backfit |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205G422 | 31 March 1999 | Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1 | |
ML20205S060 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 | Fuel cladding |
ML20206D846 | 31 March 1999 | Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8 | Shutdown Margin Anticipated operational occurrence |
PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20205D310 | 26 March 1999 | Safety Evaluation Supporting Amend 103 to License NPF-58 | Earthquake |
ML20205C376 | 26 March 1999 | Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19 | Exemption Request |
PY-CEI-NRR-2369, Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 | 3 March 1999 | Special Rept:On 990127,PAMI Was Declared Inoperable.Caused by Low Resistance Reading Existing in Circuit That Goes to Drywell.Troubleshooting of Affected Cable Will Commence During RFO on 990227 | Post Accident Monitoring |
PY-CEI-NRR-2372, Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Perry Nuclear Power Plant,Unit 1.With | |
ML20203A596 | 2 February 1999 | Safety Evaluation Accepting Licensee Proposed Revs to Responsibilities of Plant Operations Review Committee as Described in Chapter 17.2 of USAR | |
ML20203A521 | 27 January 1999 | Safety Evaluation Accepting Licensee Calculations Showing That Adequate NPSH Will Be Available for HPCS Pumps | Safe Shutdown Design basis earthquake Earthquake Backfit |
ML20198R892 | 7 January 1999 | SER Accepting Licensee Proposed Amend to TSs to Delete Reference to NRC Policy Re Plant Staff Working Hours & Require Administrative Controls to Limit Working Hours to Be Acceptable | |
ML20204J675 | 31 December 1998 | 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 | |
ML20206B010 | 31 December 1998 | 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl | |
PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With | |
ML20198J003 | 22 December 1998 | SER Accepting Licensee Response to GL 92-08,ampacity Derating Issues for Perry Nuclear Power Plant,Unit 1 | Fire Barrier |
PY-CEI-NRR-2346, Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Perry Nuclear Power Plant,Unit 1.With | |
ML20195F689 | 5 November 1998 | Safety Evaluation Accepting Proposed Reduction in Commitment in Quality Assurance Program to Remove Radiological Assessor Position | |
PY-CEI-NRR-2335, Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Perry Nuclear Power Plant,Unit 1.With | |
PY-CEI-NRR-2329, Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With | |
ML20153B822 | 16 September 1998 | Safety Evaluation Accepting Changes to USAR Section 13.4.3, 17.2.1.3.2.2,17.2.1.3.2.2.3 & App 1A | |
PY-CEI-NRR-2323, Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Perry Nuclear Power Plant,Unit 1.With | |
PY-CEI-NRR-2313, Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 1 | 31 July 1998 | Monthly Operating Rept for July 1998 for Perry Nuclear Power Plant,Unit 1 | |
PY-CEI-NRR-2306, Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 1 | 30 June 1998 | Monthly Operating Rept for June 1998 for Perry Nuclear Power Plant,Unit 1 | |
ML20249A189 | 11 June 1998 | SER on Moderate Energy Line Pipe Break Criteria for Perry Nuclear Power Plant,Unit 1 & Requests Addl Info to Demonstrate That Plant & FSAR in Compliance W/Staff Position & GDC as Discussed in SER | Safe Shutdown Safe Shutdown Earthquake Design basis earthquake Earthquake |
ML20248F353 | 21 May 1998 | Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted | Reverse polarity |
PY-CEI-NRR-2282, Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 1 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Perry Nuclear Power Plant,Unit 1 | |
ML20217D205 | 20 April 1998 | SER Authorizing Licensee to Use Code Case N-524 Until Such Time as Code Case Included in Future Rev of RG 1.147 | Incorporated by reference |
PY-CEI-NRR-2277, Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 1 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Perry Nuclear Power Plant,Unit 1 | |
ML20217D570 | 20 March 1998 | Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 | |
ML20216G390 | 11 March 1998 | SER on Proposed Merger Between Duquesne Light Co & Allegheny Power Sys,Inc | |
ML20216J140 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Perry Nuclear Power Plant,Unit 1 | |
PY-CEI-NRR-2258, Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 1 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Perry Nuclear Power Plant,Unit 1 |