 Issue dateTitleTopic
ML20149G20916 July 1997Safety Evaluation Granting Order Terminating Facility License R-117 for Univ of Il at Urbana-Champaign Lopra
ML20133N75121 January 1997Safety Evaluation Supporting Amend 6 to License R-117Fuel cladding
ML20091L77331 July 1995Illinois Lopra Reactor-Annual Rept for Aug 1994 - Jul 1995
ML20080K86728 February 1995Decommissioning Plan for Univ of Il Lopra
ML20072C68312 August 1994Ro:Damage Noted on Aluminum Clad Fuel Element in Lopra Reactor.Suspect Damage Occurred in Nov 1993 When Burr Removed from Lopra Upper Grid Plate.Fuel Element Removed from Lopra Core & Wrapped in Polyethylene
ML20072L50031 July 1994Illinois Lopra Reactor Annual Rept for Aug 1993 - Jul 1994
ML20056H32431 August 1993Forwards Annual 10CFR50.59 Rept Per Section 6.7.f of TSs
ML20127C89731 July 1992Annual Rept Aug 1991 - Jul 1992 Illinois Lopra Reactor
ML20085E00131 July 1991Illinois Lopra Reactor Annual Rept for Aug 1990 - Jul 1991
ML20059M14031 July 1990Annual Rept Aug 1989 - Jul 1990,Illinois Lopra Reactor
ML20058L07626 July 1990Univ of Illinois Nuclear Reactor Lab Operator Requalification Program
ML20055J39411 July 1990Revised Univ of Illinois Nuclear Reactor Lab Operator Requalification Program
ML20042D82231 January 1990Site Description Nuclear Reactor Lab,Univ of Illinois.
ML20248E10830 September 1989SAR for Low Power Reactor AssemblyShutdown Margin
ML20248E13331 July 1989Annual Rept for 880801-890731
ML20245D69331 July 1988Annual Rept Illinois Lopra Reactor Aug 1987 - Jul 1988Deep Dose Equivalent
ML20236N1514 August 1987Safety Evaluation Supporting Amend 4 to License R-117
ML20235K05831 July 1987Annual Rept,Aug 1986-Jul 1987
ML20214Q27018 September 1986Part 21 Rept Re Defective Interlock in Control Rods During Movement to Full Up Position.Initially Reported on 860915. Corrective Action Will Be Taken by Univ of Illinois & Univ of California at Irvine
ML20210Q54331 July 1986Annual Rept,Low Power Reactor Assembly Reactor
IA-85-826, Partially Released Commission Paper Recommending NRC Response to co-owner Petition for Exemption from License Fee for Withdrawn CP Be in Form of Order.Draft Order Encl25 November 1985Partially Released Commission Paper Recommending NRC Response to co-owner Petition for Exemption from License Fee for Withdrawn CP Be in Form of Order.Draft Order Encl
ML20199E86425 November 1985Partially Released Commission Paper Recommending NRC Response to co-owner Petition for Exemption from License Fee for Withdrawn CP Be in Form of Order.Draft Order Encl
ML20137F31031 July 1985Annual Rept,Aug 1984 - Jul 1985
ML20098C75631 July 1984Annual Rept,Aug 1983 - Jul 1984
ML20076B44710 August 1983Followup Part 21 Rept Re Emergency Diesel Generator 2B-B in Parsons-Peebles Electric Products Synchronous Generator S/N 14701228,supplied by Ge.Plants Supplied W/Generators Identified.Notification Ltr to GE Encl
ML20080L18031 July 1983Annual Rept,Illinois Lopra Reactor,Aug 1982 - Jul 1983
ML20062N60723 August 1982Annual Operating Rept,810801-820801
ML20054K15323 June 1982Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects
ML20050B02219 March 1982Final Deficiency Rept 2 Re Failure of Transamerica Delaval to Correct Violations Identified During Audits 79V-38 & 80V-39 Promptly,Due to Improper QA Program Implementation, Initially Reported on 820114.Also Reported Per Part 21
ML20010H85625 September 1981Annual Rept,Il Lopra Reactor,800801-810801.
ML20140B2911 September 1981Amend 16 to PSAR, Emergency Response Rept. Amend Constitutes Addendum I of Psar.Affidavit Encl
ML20010H40831 August 1981Ok Corp Commission Black Fox Station Economic Viability Study.
ML20008F9844 May 1981First Interim Deficiency Rept,Initially Reported 810402,re Tornado Depressurization Design Deficiencies.Ventilation Analysis for Intake & Essential Raw Cooling Water Pumping Stations Performed.Next Rept Will Be Submitted by 810909
ML19343B5018 December 1980Part 21 Rept Re Reactor Protection Sys Flexible Conduit Defect Causing Hot Shorts If Improperly Grounded.Caused by Paint on Panel Surfaces or High Resistance Connection to Panel Survaces Where Termination Modules Are MountedHot Short
ML19344F5775 September 1980Annual Rept,Aug 1979-Aug 1980,IL Lopra Reactor.
ML20039E89931 January 1980Containment Loads Rept,Mark III Containment, Revision 4
ML19256F20026 November 1979First Interim Deficiency Rept Re Nonconformance in Metal Conduits.Damaged Threads,Burrs & Flaked Galvanized Coating Detected.Defective Parts Will Be Returned to Triangle Pwc & All Conduits Inspected
ML20039E89230 September 1979Interim Containment Loads Rept,Mark III Containment, Revision 3Safe Shutdown
Hydrostatic
Feedwater Controller Failure
Earthquake
ML19207C4431 August 1979Annual Operating Rept for Aug 1978-Jul 1979
ML19208D67527 July 1979Supplemental Rept, Response to NUREG-0578,App A,TMI-2 Lessons Learned Task Force Short Term RecommendationsSafe Shutdown
Anticipated operational occurrence
Backfit
ML19209A6432 July 1979Revised BVTR-1-0, QA Program Description.
ML19282A0389 May 1979Annual Financial Rept 1978.
ML19282A0379 May 1979Annual Financial Rept 1978.
ML19269C61329 January 1979Amend 14 to PSAR Updating Following Areas:Eccs Performance, Qualification of Preoperational & Startup Testing Personnel, Expansive Structures & Interim Rept Mark III Containment, Revision 2.Hydrostatic
ML20148J1132 November 1978Interim Rept Re Geologic Inves of Subj Facil Excavation. Identifies Anomalies:Depression in Coal,Offset Along West Flank Anomaly,Offset in Northwestern Excavation.No Tectonic Indication W/Oversize Drawings Available in Central Files