Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20197D075 | 20 January 1998 | Corrected Rev 1 of Ltr Rept, Review of 971003 Entergy Ampacity Derating RAI Response | Fire Barrier |
ML20151S566 | 20 January 1998 | Review of 971003 Entergy River Bend Ampacity Derating RAI Response, Ltr Rept to USNRC 980120 Rev 1 | Fire Barrier |
ML20140G662 | 21 March 1997 | Rev 0 to, Review of 961219 Entergy River Bend RAI Response & Supplemental Ampacity Derating Calculations | Fire Barrier |
ML20128H535 | 7 June 1996 | Rev 0 to, Review of River Bend Station Fire Barrier Ampacity Assessments, Ltr Rept | Fire Barrier |
ML20129A864 | 11 April 1996 | Plant TER of IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding Probabilistic Risk Assessment |
ML20129A850 | 9 April 1996 | Plant TER on IPE Front End Analysis | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment |
ML20129A858 | 29 February 1996 | TER of Plant IPE Back-End Submittal | Internal Flooding Probabilistic Risk Assessment Hardened vent |
ML20127E318 | 18 September 1992 | Technical Evaluation of Topical Rept EA-CA-91-001-M (Steady State Core Physics Methods for BWR Design & Analysis) for Gulf States Util Co | Shutdown Margin |
ML20091J162 | 30 December 1991 | Ter,River Bend Station,Unit 1,Station Blackout Evaluation, Final Rept | Safe Shutdown |
ML20195F113 | 31 October 1988 | Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components: River Bend-1 | |
ML20155E371 | 31 July 1988 | Technical Evaluation Rept Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification River Bend Station,Unit 1 | |
ML20149M497 | 29 February 1988 | Technical Evaluation Rept for Evaluation of Offsite Dose Calculation Manual,Rev 1,River Bend Station Unit 1 | Offsite Dose Calculation Manual |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20236P711 | 31 July 1987 | Technical Evaluation Rept on First 10-Yr Interval Inservice Insp Program Plan:River Bend Station Unit 1, Final Informal Rept | Weld Overlay VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20207S520 | 30 November 1986 | Technical Evaluation Rept for River Bend Station on SER Outstanding Issue (8) - Mark III Containment Sys Issues - Humphrey Safety Concerns (Hsc) | |
ML20136F653 | 31 December 1985 | Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | Nondestructive Examination |
ML20244D769 | 30 November 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,River Bend Unit 1 | |
ML20133B068 | 31 July 1985 | Review & Evaluation of Tdi Diesel Engine Reliability & Operability - River Bend Station Unit 1 | Hydrostatic Nondestructive Examination Finite Element Analysis Liquid penetrant |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20128H779 | 30 June 1985 | Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20126E986 | 31 May 1985 | Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Technical Evaluation Rept | |
ML20126K893 | 31 March 1985 | Conformance to Reg Guide 1.97,River Bend Station,Units 1 & 2 | Fuel cladding |
ML20108C039 | 8 February 1985 | Pump & Valve Operability Assurance Audit, Technical Evaluation Rept | Stroke time Hydrostatic Anchor Darling |
ML20096D912 | 31 August 1984 | Control of Heavy Loads at Nuclear Power Plants,River Bend Station Unit 1 (Phase I) | Safe Shutdown Control of Heavy Loads |
ML20054H881 | 31 May 1982 | Control of Heavy Loads at Nuclear Power Plants,River Bend Station,Units 1 & 2, Draft Technical Rept | Safe Shutdown Control of Heavy Loads |