Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20148D54616 May 1997Technical Evaluation Rept of IPE Submittal & RAI Responses for Prairie Island Units 1 & 2 Nuclear Generating PlantBoric Acid
Ultimate heat sink
Mission time
Internal Flooding
L-95-059, Technical Evaluation Rept on Third 10-Yr Interval Inservice Insp Exam Plan:Northern State Power Co,Prairie Island Nuclear Generating Plant,Unit 231 December 1995Technical Evaluation Rept on Third 10-Yr Interval Inservice Insp Exam Plan:Northern State Power Co,Prairie Island Nuclear Generating Plant,Unit 2Hydrostatic
VT-2
Incorporated by reference
L-95-056, Technical Evaluation Rept on Third 10-Year Interval Inservice Insp Program Plan:Northern States Power Co, Prairie Island Nuclear Generating Plant,Unit 130 November 1995Technical Evaluation Rept on Third 10-Year Interval Inservice Insp Program Plan:Northern States Power Co, Prairie Island Nuclear Generating Plant,Unit 1Hydrostatic
VT-2
Incorporated by reference
ML20058N8094 November 1993Pump & Valve IST Program Prairie Island Nuclear Generating Plant,Units 1 & 2 Northern States Power Co, TERBoric Acid
Stroke time
Incorporated by reference
Power-Operated Valves
Backfit
ML20116A13731 October 1992Auxiliary Feedwater System RISK-BASED Inspection Guide for the Prairie Island Units 1 and 2 Nuclear Power PlantsProbabilistic Risk Assessment
Emergency Lighting
ML20096G51630 April 1992Trip Rept:Onsite Analysis of Human Factors of Event at Prairie Island 2 on 920220 (Loss of Shutdown Cooling)Reactor Vessel Water Level
ML20063P93118 July 1990Technical Evaluation Rept Prairie Island Nuclear Generating Plant Units 1 & 2 Station Blackout Evaluation
ML20246J92030 June 1988Technical Evaluation Rept for Evaluation of Odcm,Updated Through Rev 9,Prairie Island Nuclear Generating Plant,Units 1 & 2Grab sample
Offsite Dose Calculation Manual
ML20215H67030 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components, Prairie Island 1 & 2, Technical Evaluation ReptSafe Shutdown
ML20211N80731 May 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Indian Point 2,Kewaunee,North Anna 1 & 2 & Prairie Island 1 & 2
ML20210L48025 April 1986Technical Evaluation of Dcrdr for Prairie Island Nuclear Generating Station,Units 1 & 2Emergency Lighting
ML20206H86219 February 1986Technical Evaluation of Dcrdr for Northern States Power Co, Prairie Island Nuclear Generating Plant,Units 1 & 2
ML20137X73530 September 1985IN-PLANT Source Term Measurements at Prairie Island Nuclear Generating Station
ML20133N20931 August 1985Conformance to Reg Guide 1.97,Prairie Island Nuclear Generating Plant,Units 1 & 2Boric Acid
Grab sample
Anticipated operational occurrence
ML20244D38710 July 1985Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant.
ML20244D43830 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities
ML20108D00330 November 1984Conformance to Reg Guide 1.97 Prairie Island Nuclear Generating Plant,Units 1 & 2Boric Acid
ML20111A6477 September 1984Revised, Inservice Insp Program,Prairie Island Nuclear Generating Plant, Technical Evaluation ReptHydrostatic
Dissimilar Metal Weld
ML20077J97316 August 1983Masonry Wall Design,Prairie Island Nuclear Generating Plant,Units 1 & 2, Revised Technical Evaluation ReptTornado Missile
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
ML20076D21217 May 1983Control of Heavy Loads (C-10),Prairie Island Nuclear Generating Plant,Units 1 & 2, Technical Evaluation ReptSafe Shutdown
Boric Acid
Nondestructive Examination
Control of Heavy Loads
ML20077K77323 February 1983Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation ReptHot Short
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20079G9306 December 1982ECCS Repts (F-47),TMI Action Plan Requirements,Northern States Power Co,Praire Island Nuclear Generating Plant Units 1 & 2, Technical Evaluation Rept
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20039A1969 December 1981Equipment Environ Qualification Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment.
ML20040A38530 November 1981ECCS Review,Prairie Island Nuclear Generating Plant,Units 1 & 2, Informal Rept
ML20004D0473 June 1981Auxiliary Feedwater Sys Automatic Initiation & Flow Indication,Prairie Island Units 1 & 2, Technical Evaluation ReptPower-Operated Valves
ML19345E1459 December 1980Draft Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of ESF Reset Controls for Prairie Island Nuclear Generating Plant,Units 1 & 2.
ML19341A9928 December 1980Metallurgical Analysis,W/Attachment A,Stress Analysis of Failed Steam Generator Support Bolts from Prairie Island, Unit 1.
ML19339B82019 September 1980LWR In-Plant Measurement Program, Informal Monthly Progress Rept for Aug 1980
ML19318B13431 March 1980Technical Evaluation of Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Prairie Island Nuclear Generating Plants Units 1 & 2.
ML19225C50621 June 1979Fire Protection in Operating Nuclear Power Stations,Prairie Island Station SER Review, Interim Rept