Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant | 30 August 1996 | TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant | Hydrostatic VT-2 Incorporated by reference |
ML18065A478 | 27 June 1995 | Plant TER on IPE Front End Analysis. | Mission time Internal Flooding Probabilistic Risk Assessment |
ML18065A479 | 31 May 1995 | Plant TER on IPE Submittal Human Reliability Analysis Final Rept. | Probabilistic Risk Assessment |
ML18065A480 | 30 April 1995 | TER of Plant IPE Back-End Submittal - Final Rept. | Probabilistic Risk Assessment Backfit |
ML18059B160 | 31 January 1994 | Safe-End to Pipe Cracking. | |
ML18058A229 | 18 February 1992 | Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant. | Boric Acid High Radiation Area Stroke time Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML20059P046 | 27 September 1990 | Notification of Contract Execution,Task Order 2,to NDE Support at Palisades Nuclear Power Plant. Contractor:Tet,Inc | |
ML18054B446 | 28 February 1990 | Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation Rept | Stroke time Hydrostatic |
ML18054A755 | 31 December 1988 | Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades. | Loop seal Anticipated operational occurrence |
ML18052B193 | 30 June 1987 | Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept | |
ML18052B155 | 30 April 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept | |
ML18052B055 | 30 April 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept | |
ML20214R743 | 31 March 1987 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 | |
ML18052B051 | 30 March 1987 | Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal Rept | Safe Shutdown Offsite Dose Calculation Manual Process Control Program |
ML18052A831 | 12 January 1987 | Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation Rept | Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake Fuel cladding |
ML20210Q448 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept | |
ML20235L511 | 31 July 1986 | Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation Rept | Boric Acid |
ML20127D906 | 31 May 1985 | Conformance to Reg Guide 1.97,Palisades Plant | Boric Acid |
ML20086D381 | 29 November 1983 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML18051A638 | 14 October 1983 | Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation Rept | Safe Shutdown Nondestructive Examination Control of Heavy Loads |
ML18051A657 | 10 October 1983 | Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation Rept | Tornado Missile Earthquake |
ML18051A430 | 2 March 1983 | Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept | |
ML20072J276 | 28 February 1983 | Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim Rept | Boric Acid Power-Operated Valves |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML18047A611 | 14 October 1982 | ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20027D222 | 31 July 1982 | Redundant DHR Capability,Palisades Nuclear Power Plant. | Safe Shutdown |
ML18047A570 | 29 June 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info | |
ML20052H502 | 30 April 1982 | Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary Rept | Safe Shutdown |
ML20050A681 | 31 March 1982 | Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation Program | Safe Shutdown Earthquake Finite Element Analysis Earthquake |
ML18046B281 | 20 January 1982 | to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept | |
ML18046B282 | 31 December 1981 | Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP | |
ML18046B177 | 18 December 1981 | Suppl to Rept EGG-EA-5317. | |
ML20039A452 | 30 November 1981 | Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept | |
ML20039A682 | 30 November 1981 | SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal Rept | Power-Operated Valves |
ML18046B173 | 30 November 1981 | Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780. | |
ML18046A976 | 31 October 1981 | Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep. | Safe Shutdown Shutdown Margin Ultimate heat sink Emergency Lighting Earthquake Pressure Boundary Leakage |
ML18046A644 | 14 May 1981 | Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation Rept | Safe Shutdown Boric Acid Backfit Affidavit |
ML20008F789 | 30 April 1981 | Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981 | |
ML20003A160 | 31 January 1981 | Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program | |
ML19341B384 | 31 December 1980 | Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant. | |
ML18067A783 | 31 July 1969 | CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis. | Earthquake |
ML18067A784 | 30 June 1969 | CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis. | Earthquake |