Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-96-028, TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear Plant30 August 1996TER on Third 10-Yr Interval Inservice Insp Program Plan: Consumers Power Co for Palisades Nuclear PlantHydrostatic
VT-2
Incorporated by reference
ML18065A47827 June 1995Plant TER on IPE Front End Analysis.Mission time
Internal Flooding
Probabilistic Risk Assessment
ML18065A47931 May 1995Plant TER on IPE Submittal Human Reliability Analysis Final Rept.Probabilistic Risk Assessment
ML18065A48030 April 1995TER of Plant IPE Back-End Submittal - Final Rept.Probabilistic Risk Assessment
Backfit
ML18059B16031 January 1994Safe-End to Pipe Cracking.
ML18058A22918 February 1992Draft Technical Evaluation Rept, Pump & Valves Inservice Testing Program - Palisades Nuclear Plant.Boric Acid
High Radiation Area
Stroke time
Cold shutdown justification
Power-Operated Valves
Power Operated Valves
ML20059P04627 September 1990Notification of Contract Execution,Task Order 2,to NDE Support at Palisades Nuclear Power Plant. Contractor:Tet,Inc
ML18054B44628 February 1990Draft Insights Into Palisades PORV & Block Valve Tests, Technical Evaluation ReptStroke time
Hydrostatic
ML18054A75531 December 1988Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing for Palisades.Loop seal
Anticipated operational occurrence
ML18052B19330 June 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28, Reactor Trip Sys Vendor Interface,Calvert Cliffs-1 & -2, Millstone-2 & Palisades, Final Informal Rept
ML18052B15530 April 1987Final Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Palisades, Informal Rept
ML18052B05530 April 1987Conformance to Generic Ltr 83-28,Item 2.2.1 -- Equipment Classification for All Other Safety-Related Components: Palisades, Final Informal Rept
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML18052B05130 March 1987Technical Evaluation Rept for Palisades Plant,Response to NRR Generic Ltr 83-37, Interim Informal ReptSafe Shutdown
Offsite Dose Calculation Manual
Process Control Program
ML18052A83112 January 1987Evaluation of Spent Fuel Racks Structural Analysis, Cpc,Palisades Plant, Technical Evaluation ReptSafe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Earthquake
Fuel cladding
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20235L51131 July 1986Conformance to Reg Guide 1.97,Palisades Plant, Technical Evaluation ReptBoric Acid
ML20127D90631 May 1985Conformance to Reg Guide 1.97,Palisades PlantBoric Acid
ML20086D38129 November 1983PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Palisades Plant, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML18051A63814 October 1983Control of Heavy Loads (C-10),CPC Palisades Plant, Technical Evaluation ReptSafe Shutdown
Nondestructive Examination
Control of Heavy Loads
ML18051A65710 October 1983Review of Licensee Response to Design Codes,Design Criteria & Loading Combination (SEP,III-7.B),Palisades Plant, Draft Supplementary Technical Evaluation ReptTornado Missile
Earthquake
ML18051A4302 March 1983Selected Operating Reactors Issues Program Ii,Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept
ML20072J27628 February 1983Ser,Pump & Valve Inservice Testing Program,Palisades Nuclear Plant, Interim ReptBoric Acid
Power-Operated Valves
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML18047A61114 October 1982ECCS Repts (F-47) TMI Action Plan Requirements,Palisades Plant, Technical Evaluation Rept
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20126F25426 August 1982Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982
ML20027D22231 July 1982Redundant DHR Capability,Palisades Nuclear Power Plant.Safe Shutdown
ML18047A57029 June 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69), Request for Addl Info
ML20052H50230 April 1982Redundant Decay Heat Removal Capability,Palisades Nuclear Power Plant, Preliminary ReptSafe Shutdown
ML20050A68131 March 1982Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the Systematic Evaluation ProgramSafe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML18046B28120 January 1982to Design Codes,Design Criteria & Loading Combinations, Draft Technical Evaluation Rept
ML18046B28231 December 1981Structural Review of the Palisades Nuclear Power Plant Unit 1 Containment Structure Under Combined Loads for the SEP
ML18046B17718 December 1981Suppl to Rept EGG-EA-5317.
ML20039A45230 November 1981Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept
ML20039A68230 November 1981SEP Topic V-11.A,Electrical,Instrumentation,& Control Features for Isolation of High & Low Pressure Sys,Palisades Nuclear Station, Informal ReptPower-Operated Valves
ML18046B17330 November 1981Degraded Grid Protection for Class IE Power Sys,Palisades Plant,Docket 50-255,TAC 10043, & Adequacy of Station Electric Distribution Sys Voltages,Palisades Plant,Docket 50-255,TAC 12780.
ML18046A97631 October 1981Review of Operating Experience History of Palisades Nuclear Power Plant for NRC Sep.Safe Shutdown
Shutdown Margin
Ultimate heat sink
Emergency Lighting
Earthquake
Pressure Boundary Leakage
ML18046A64414 May 1981Nonproprietary Version of Equipment Environ Qualification, Palisades Plant, Final Technical Evaluation ReptSafe Shutdown
Boric Acid
Backfit
Affidavit
ML20008F78930 April 1981Adequacy of Station Electric Distribution Sys Voltages, Palisades Plant, Informal Rept for Apr 1981
ML20003A16031 January 1981Seismic Review of the Palisades Nuclear Power Plant Unit 1 as Part of the Systematic Evaluation Program
ML19341B38431 December 1980Technical Evaluation Rept,Degraded Grid Protection for Class IE Power Sys,Palisades Plant.
ML18067A78331 July 1969CPC Palisades Plant,Auxiliary Building Job 5935,Seismic Analysis.Earthquake
ML18067A78430 June 1969CPC Palisades Plant,Reactor Building Job 5935,Seismic Analysis.Earthquake