Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20062J27431 August 1993Technical Evaulation Rept, Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11
ML20091J09520 December 1991Final Technical Evaluation Rept - Oconee Nuclear Station, Station Blackout EvaluationSafe Shutdown
ML20072P67124 April 1990Second Interval Inservice Insp Program Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation ReptHydrostatic
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20236B80513 March 1989Monthly Progress Rept for Contract NRC-02-87-004 for Period 890204-890303.Financial Data Available in Central Files
ML20245E92731 August 1988Technical Evaluation Rept,Tmi Action--NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Oconee Units 1,2 & 3Loop seal
Anticipated operational occurrence
ML20236E22531 October 1987PRA Application Program for Inspection at Oconee Unit 3Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20235X53031 August 1987Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface Oconee 1,2 & 3
ML20236D91831 July 1987Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAsProbabilistic Risk Assessment
Earthquake
ML20215G28531 March 1987Technical Evaluation Rept for Oconee Nuclear Station Units 1,2 & 3 Response to Us Nrc,Nrr Generic Ltr 83-37, Informal ReptSafe Shutdown
ML20195G25231 March 1987Conformance to Reg Guide 1.97,Oconee Nuclear Station,Units 1,2 & 3, Final Informal ReptBoric Acid
ML20199J20430 June 1986a Review of the OCONEE-3 Probabilistic Risk Assessment Containment Performance,Radiological Source Terms and Risk EstimatesProbabilistic Risk Assessment
Fatality
ML20154R38931 March 1986a Review of the OCONEE-3 Probabilistic Risk Assessment. Internal Events,Core Damage FrequencySafe Shutdown
Mission time
Probabilistic Risk Assessment
Earthquake
Failure to Scram
Manual Operator Action
Loss of condenser vacuum
ML20155K57931 March 1986an Assessment of the Safety Implications of Control at the Oconee 1 Nuclear Plant Final ReportBoric Acid
Stroke time
Probabilistic Risk Assessment
Operator Manual Action
Earthquake
Overspeed trip
Loss of condenser vacuum
ML20154R39231 March 1986a Review of the OCONEE-3 Probabilistic Risk Assessment. External Events,Core Damage FrequencyProbabilistic Risk Assessment
ML20211G94330 December 1985Preliminary Development of an Integrated Approach to the Evaluation of Pressurized Thermal Shock as Applied to the Oconee Unit 1 Nuclear Power PlantLoop seal
Probabilistic Risk Assessment
Earthquake
Coast down
Exclusive Use
Loss of condenser vacuum
ML20210K64530 November 1985PRA InsightsSafe Shutdown
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Earthquake
Turbine Missile
Fatality
ML20138Q69031 October 1985Failure Modes and Effects Analysis (FMEA) of the Ics/Nni Electric Power Distribution Circuitry at the OCONEE-1 Nuclear Plant
ML20151U34815 October 1985Comparison of Plant-Specific Analyses of Pressurized Thermal Shock (Based on Oconee,Calvert Cliffs & Hb Robinson), Technical Ltr Rept
ML20135D34431 August 1985Trac Analyses of Severe Overcooling Transients for the OCONEE-1 PWRShutdown Margin
Loop seal
ML20137S25731 August 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1
ML20209F81530 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1
ML20128G48831 May 1985Conformance to Reg Guide 1.97,Oconee Nuclear Station, Units 1,2 & 3
ML20116P11930 April 1985Assessment of Selected Trac and RELAP5 Calculations for OCONEE-1 Pressurized Thermal Shock Study
ML20209E51730 April 1985Dominant Accident Sequences in OCONEE-1 Pressurized Water ReactorSafe Shutdown
Boric Acid
Loop seal
Probabilistic Risk Assessment
Coast down
ML20127C42911 January 1985Evaluation of Supplemental Info for Detailed Control Room Review,Summary Rept for Oconee Nuclear Station Units 1,2 & 3, Suppl to Final Technical Evaluation Rept
ML20108B40130 September 1984Draft Final Rept,Vol 1, Assessment of Safety Implications of Control at Oconee-1 Nuclear Plant
ML20097F33331 July 1984Possible Modes of Steam Generator Overfill Resulting from Control System Malfunctions at OCONEE-1 Nuclear Plant
ML20093J68620 July 1984Evaluation of Detailed Control Room Design Review Summary Rept for Oconee Nuclear Station,Units 1,2 & 3, Final Technical Evaluation Rept
ML20151K21924 April 1984Preliminary Draft Evaluation of Control Sys Failures Leading to RCS Overcooling in Oconee 1 Power Plant. NUREG/CR-3692, Possible Modes of Steam Generator Overfill Resulting from Control Sys Malfunctions... EnclBoric Acid
ML20080F2934 February 1984Trac Analyses of Severe Overcooling Transients for Oconee-1 PwrShutdown Margin
Loop seal
ML20105C7612 February 1984Masonry Wall Design,Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation ReptFire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20080C25331 July 1983RELAP5 Thermal-Hydraulic Analysis of Pressurized Thermal Shock Sequences for Oconee-1 Pwr
ML20077K8346 April 1983Selected Operating Reactor Issues Program Ii,Rcs Sys Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation ReptHot Short
Safe Shutdown
ML20072J74831 March 1983Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Interim Rept
ML20072S67031 March 1983Control of Heavy Loads (C-10), Oconee Nuclear Power Station Units 1,2 & 3, Technical Evaluation ReptSafe Shutdown
Control of Heavy Loads
ML20073E28414 March 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 3, Technical Evaluation ReptBoric Acid
Fire Barrier
Post Accident Monitoring
ML20073E27211 March 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 2, Technical Evaluation ReptBoric Acid
Post Accident Monitoring
ML20073E2688 March 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Oconee Nuclear Station,Unit 1, Technical Evaluation ReptBoric Acid
Fire Barrier
Post Accident Monitoring
ML20065B22831 January 1983Adequacy of Station Electric Distribution Sys Voltages, Oconee Nuclear Station,Units 1,2 & 3, Informal Rept
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20065F72528 September 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),Oconee Nuclear Station Units 1,2 & 3, Technical Evaluation ReptBoric Acid
Shutdown Margin
Probabilistic Risk Assessment
ML20062B07831 July 1982Socioeconomic Impacts of Nuclear Generating Stations: Oconee Case Study.Docket Nos. 50-269 and 50-270.(Duke Power Company)
ML20054F6384 June 1982Audit of Oconee Procedures & Training for Pressurized Thermal ShockShutdown Margin
ML20244B5616 August 1981Containment Leakage Rate Testing,Oconee Units 1,2 & 3, Technical Evaluation ReptLocal Leak Rate Testing
ML20039F03431 May 1981Reactor Safety Study Methodology Applications Program: Oconee #3 PWR Power Plant
ML20080J30917 April 1981Metallurgical,Stress & Fracture Mechanics Analyses of Cracked Steam Generator Manway Studs from Oconee Unit 3 of Duke Power Co
ML20080J32117 April 1981Attachment 1 to Stress Analysis of Failed Steam Generator Manway Studs from Oconee Unit 3,Duke Power Co
ML19309C47129 February 1980Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station, Informal Rept
ML19296C97830 November 1979Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals,Oconee Nuclear Station,Units 1,2 & 3, Informal Rept