Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20203J092 | 28 February 1998 | Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at McGuire Nuclear Station,Units 1 & 2, Final Rept | Hot Short Safe Shutdown High winds Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Seismically rugged TORMIS Earthquake |
ML20107N037 | 29 February 1996 | Submittal-Only Review of McGuire Nuclear Station Individual Plant Exam of External Events, Draft Rept | Hot Short Safe Shutdown High winds Fire Barrier Earthquake |
ML20107N010 | 29 February 1996 | Submittal-Only Review of Catawba Nuclear Station Individual Plant Exam of External Events, Draft Rept | Hot Short Safe Shutdown High winds Fire Barrier Earthquake |
ML20076K941 | 30 September 1994 | Technical Evaluation Rept:Pumps & Valves Inservice Testing Program,Mcguire Nuclear Station,Units 1 & 2,Duke Power Co | Boric Acid Stroke time Hydrostatic Probabilistic Risk Assessment Incorporated by reference Scaffolding |
ML20080E371 | 31 May 1994 | Technical Evaluation Rept on Second Ten-Year Interval Insp Program Plan | Incorporated by reference |
ML20069L862 | 31 May 1994 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Mcguire Nuclear Power Plant | Stroke time Probabilistic Risk Assessment Overspeed trip |
ML20071F885 | 31 August 1993 | Technical Evaluation Rept McGuire Nuclear Plant Individual Plant Exam Assessment of Human Reliability Analysis,Step 2 Review | Job Performance Measure |
ML20141M214 | 23 March 1992 | Notification of Contract Execution,Task Order 2, IPE Reviews,Internal Events,Front End Only:Mcguire. Contractor: Science & Engineering Assocs,Inc | |
ML20091H033 | 10 December 1991 | Final, Technical Evaluation Rept,Mcguire Nuclear Station, Station Blackout Evaluation | Safe Shutdown |
ML20086G598 | 31 October 1991 | Technical Evaluation:Core Thermal-Hydraulic Methodology Using VIPRE-01,Topical Rept DPC-NE-2004 | |
ML20077E366 | 31 May 1991 | Final Review of LOCA Analysis for Duke Power Co,Catawba & McGuire Units W/B&W Fuel Co Reload Fuel BAW-10174,Rev 1 | Boric Acid Loop seal Fuel cladding |
ML20059E284 | 29 August 1990 | Emergency Preparedness Exercise for 900814-15, Final Rept Per Insp Repts 50-369/90-15 & 50-370/90-15 | |
ML20063P912 | 31 October 1989 | SAIC-88/1943, Technical Evaluation Rept,First Interval Inservice Insp Program,Mcguire Nuclear Station Units 1 & 2 | Ultimate heat sink Hydrostatic VT-2 Incorporated by reference Stress corrosion cracking Dissimilar Metal Weld |
ML20196C164 | 4 February 1988 | Independent Assessment & Analysis, Monthly Progress Rept for Period Ending 880131 | |
ML20237J062 | 19 August 1987 | Technical Evaluation Rept on Duke Power Co McGuire & Catawba Nuclear Stations Spds | Backfit |
ML20215L765 | 31 May 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components,Mcguire 1 & 2, Informal Rept | Safe Shutdown |
ML20215M115 | 30 April 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components, Mcguire Units 1 & 2, Informal Rept | |
ML20211K510 | 30 November 1986 | Input for Ser,Mcguire Nuclear Station Units 1 & 2,Millstone Nuclear Power Station Unit 3,Seabrook Station Units 1 & 2, VC Summer Nuclear Station,Vogtle Electric...Reactor Trip Sys Reliability,Item 4.5.2 of Generic Ltr 83-28 | |
ML20197J464 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Catawba Nuclear Stations 1 & 2,DC Cook Nuclear Power Plants 1 & 2,WB McGuire Nuclear Stations 1 & 2,Sequoyah Nuclear Plants 1 & 2 | |
ML20205J584 | 30 November 1985 | Conformance to Reg Guide 1.97,McGuire Nuclear Station, Units 1 & 2, Preliminary Rept | |
ML20108F484 | 19 November 1984 | Evaluation of Detailed Control Room Design Review Summary Rept, Final Technical Evaluation Rept | |
ML20087Q085 | 13 July 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Technical Evaluation Rept | |
ML20085F252 | 19 May 1983 | Evaluation of McGuire Units 1 & 2 Undervoltage Trip Attachment Failures, Interim Technical Evaluation Rept | |
ML20070R423 | 25 January 1983 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Vols 1 & 2, Technical Evaluation Rept | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20069E799 | 31 August 1982 | Control of Heavy Loads, Draft Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20064N737 | 31 August 1982 | Reliability Analysis of Containment Strength.Sequoyah and McGuire Ice Condenser Containments | Finite Element Analysis Earthquake |
ML20126F254 | 26 August 1982 | Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 | |
ML20050A056 | 10 March 1982 | to Request for Addl Info Re Equipment Environ Qualification Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML20040G497 | 14 December 1981 | Request for Addl Info, Equipment Environ Qualification, Review of Licensees' Resolution of Outstanding Issues from NRC Equipment Environ Qualification Safety Evaluation Repts & TMI Action Plan Installed Equipment. | |
ML20009E266 | 31 July 1981 | Mcguire Nuclear Station Unit 1 Auxiliary Feedwater System Reliability Study Evaluation | Safe Shutdown Earthquake |
ML19350B588 | 1 December 1980 | Rough Draft, Analysis of Hydrogen Mitigation for Degraded Core Accidents in Sequoyah Nuclear Power Plant, Prepared for Ofc of Nuclear Regulatory Research | Squib |
ML19259B282 | 31 May 1978 | Transport of Radionuclides in Urban Environs:Working Draft Assessment. Analyzes the Problem in General & Specifically for New York City | Earthquake Stolen Fatality Exclusive Use Depleted uranium |