1
- ^
- ENCLOSURE
- r.
REQUEST FOR ADDITIONAL INFORMATION EQUIPMENT E?NIRONMENTAL QUALIFICATION (EEQ)
REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES 8
FROM NRC EQUIPMENT E?NIRO?iMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI ACTION PLAN INSTALLED EQUIPMENT Duke Power Company
, McGuire Unit 1 m
NIC Docket No. 50-369 December 14, 1981 NRC TA' ' No. 4 253 8 C
f 00 Franklin Research Center A Division cf The Franklin Institute The Benprna FrarMn Pa%.PNa Fa. 19103(215) 448 1000 9202160140 820125 PDR ADDCK 05000369 P
- . 57' RFI-CS257-521 BACKGROUND Franklin Research Center (FPC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors..FRC will; perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.
This request for additional information (RFI) is the result of an evaluation of the information provided by the letter dated August 17, 1981
[1].
- FRC previously requested TMl Action Plan information by telephone memorandum dated September 8, 1981 [2].
A.
FPC PIVIEW OF THE LICENSEE'S 90-DAY RESPCNSE TO THE NPC EEQ SER Information Requested Date Received by FRC**
1.
In reference to the Licensee's 90-day response [1] to the NRC SER [3), a legible single ecpy of each of the following qualification documents is requested in order that the FRC evaluation may proceeds a.
Duke Letter, Parker te Denton December 19, 1979 Pages 4C, SC
~c. 4 Joy / Reliance Test Report FF-14 282 Pages 7C, 8C o
- Numbers in brackets refer to citations found in the 1[st of references.
- This column will be completed by FRC as the requested infot.tation is received.
nM. Research Center A bewan ed TN Fw h 0
,m 4
0 RFI-CS257-521 Date Received by FRC**
a d.
Supplemental Technical Paper TA-4081 Pag-a 7C, 6C e.
Joy / Reliance Test Report NUC-9 Supplement, 4/14/80 Pages 7C, 8 f.
Valcor Test Report QR-57300-5220-1-1 May 15, JS79 Page llc g.
Solon Test Report A293-80 Page 15C h.
Solon Test Report A294-80 Page 15C 1.
D. G. O'Frien Test Report ER-252 Page 16C j.
D. G. O'Brien Test Report ER-227 Page 16C k.
D. G. O'Brien Test Report ER-247 Pa,ye 16C 1.
Okonite Test Report N-1 Page 17C m.
Okonite Test Report FN-1 Page 17C
- n. " Okonite Test Report 110E Page 17C o.
Okonite Test Peport K-O-1, September 1979 Page 18C p.
Namco Test Report, March 3,1978 Page 23C 1
q.
Namco Test Report, February 20, 1978 Page 23C
- Numbers in brackets refer to citations found'in the list of* references.
- Tbis column will be co=pleted by FRC as the requested information is received..
nidin Research Center
~. ~ - -
.e ;
~ '
3 I:
e.
RFI-C5257-521
-Date Received by FRC**'
c.
3M Test Report 44390-1 Rev 4, Page 24C
~
-s s.
Memo to File. MC-13 62.03, July 9, 1981 Pages 4R,i6R, 7R t.
Reliance Letter, 8/3/80 Page 31R, 34R'
~
u.
Gould. Report OM-302-618 Page 36R
,i v.
Nelson Electric Letter 6/27/80 J
Page 37R w.
Westinghouse Transformer Div. Report 11/11/77 Page 38R i
x.
Westinghouse Life Statement, 11/14/77 Page 38R y.
Micro Switch Report Letter #15027-1 Page 40R z.
Barton Test Report 43904-1 Page 41R aa.
Duke Analyses on Westinghouse Testing:
MCC 1381.05-00-0101, MCC 1381.05-00-0102 Pages lH, 25, 3H, 4H, SH bb.
M. L. Ward, Letter to File MCM 1320.00 7/17/80 Page 6H cc.
Buss =an Manufacturing Report, 3/13/79 Pages 10H, 11H, 12H, 13H 4
dd.
Duke Steam Production Qualification Test Facility Report TR-028 Page 25H ee.
Rotork Test Report TR3025, April 1980 Page 29H ff.
NAMCO Test Report for EA-170-302, 3/28/80 Page 30H
- Numbers in brackets refer to citations found in the list.o'f rEfere5ce~s'[ '
~
- This column will be' completed by FaC as the requested information is received.-
A il000 Franklin Researth Center A h at Tk fe %
U
i
.. _ 4 _
... ~
e.
.J
.t RFI-C5257-521T B.
FRC REVIEW OF INSTAI. LED TMI ACTION PLAN ITEMS Information Requested
- Oa'te Received by FRC**'
l.
Reference 1 does not provide adequate detail with respect to identification of TMI Action.
Plan' equipment installed as of 1/1/81.
~
a.
Identification of.all THI Action Plan equipment installed as of 1/1/81 is
~
requested.
b.
Identification of' TMI Action Plan equipment installed with implementation c-dates af ter 1/1/81 is requested.
c.
The correlation of these equipment items with the specific sections of 'NUREG-0737
[4] presented below (as applicable) is r e que sted.
For PRRs, Sections:
IIEl.2, IIE4.2, IIE3.1, IIG1, IIF2, IID3, IIK2.10 (B&W),' IIB 3, IIE4.1.
[The correlation is needed to ensure that all items are' included in the
- review, e.g.,
if a transmitter is identified as a TMI Action Plan. item, are the cable and terminal blocks associated with the device also identified?)
d.
For all installed TMI Action Plan equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-OlB format) is requested.
e.
FRC requests that Duke insure that the environdental conditions are specified for all TMI Action Plan equipment to be
- reviewed, e.g.,
the postulated accident condition including profiles and also the normal service conditions.
f.
The approximate installation date for the TMI Action Plan equipment items is requested so that the appecpriate qualification criteria (NUREG-0588 cr DOR A
.4-Nbranklin Research Center..
A Dhmm af The FM W
'm 4
RFI-C5257-521 Date Received by FRC**
Guidelines) can be used in the EEQ evaluation.
(FRC previously requested this information in Reference 3.)
2.
The qualification documents, e.g., the actual
{
test reports and associated correspondence cited as evidence of qualification listed on the SCER sheets, for all identified. TNI Action Plan equipment are requested.
[The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]
s; 3.
Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 -
technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.
C.
INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED 1.
The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RFI.
2.
The Licensee may transmit the requested information as follows:
o complete package directly to the NRC project manager or o copy of cover letter to NRC project manager and complete package to FRC.
FRC mailing address is as follows:
Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentie'th Street
~
Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 4 '
bl") Franklin Research Center A Dhame af De Fm hemmas n
'l sa.
4.,
4
- s RFI-C5257-521 PLFERENCES 1
1.
W. O. Parker, Jr.
Iatter to H. R. Denton and E. G. Adensam, NRC.
Subject:
' McGui're Nuclear Station, Environmental Qualification of Equipment, Response to NBC Staff Safety Evaluaticn Report
'~
Duke Power Co=pany, 17-Aug-81 2.
Telephone Meoorandum C. J. Crane, J. A. Murphy (FIC) with N. B. Lee (NBC)g S. Copp (Licensing; Duke Power), D. Murdoch (EEQ Engineer), T. Harrell (EEQ Engineer)
Subject:
Request for Information, McGuire Unit 1 8-Sep-81 3.
Office of Nuclear Reactor Regulation Safety Evaluation Report for McGuire Unit 1 Environmental Qualification of Safety-Related Electrical Equipment NRC, 17-Apr-81 4.
NUREG-0737, " Clarification of M Action Plan Requirements" NRC, November 1980 n
Obl Frank 5n Researth Center A!>=mun of Tk Pm w
,