Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML15261A4644 September 1998Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Current TSs Re Electrical Distribution Sys & Incorporate New Requirements for Sys Operation, Limiting Conditions for Operation & SRSafe Shutdown
Anticipated operational occurrence
Overspeed trip
ML20198S20219 January 1998Application for License Amend Request for Oconee Nuclear Station Isfsi,Changing Corporate Name of Licensee from Duke Power Co to Duke Energy CorpAffidavit
ML20134L30010 February 1997Application for Amends to Licenses DPR-38,DPR-47 & DPR-55, Revising TS to Reduce Allowable RB Vol Leakage Rate Per Day Limit to Permit Relaxation of Certain Requirements for Operability of Prvs Sys
ML16134A67411 August 1982Application for Amend to License DPR-47,changing Tech Specs Re Reload Design Calculations for Cycle 7
ML20052F2403 May 1982Application for Amend to DPR-55,changing Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits.Proposed Tech Specs, Cycle 7 Reload Rept & Fee Encl
ML15223A76512 January 1982Application to Amend Licenses DPR-38,DPR-47 & DPR-55, Changing Tech Spec Section 3.1.2 Re Heatup,Cooldown & Inservice Test Limitations for Rcs.W/Class I & II Fees
ML16148A44013 November 1981Application to Amend OL Changing Tech Specs Required to Support Operation at Full Rated Power During Cycle 6.Changes Concern Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits
ML20010D20519 August 1981Application for Amend to OL Revising Tech Specs to Extend Cycle 5 Operating Length to 390 Effective Full Power Days Allowing Continued Operation of Facility Until Scheduled Refueling Shutdown in Early Oct
ML15223A73029 May 1981Application for Amend of Licenses DPR-38,DPR-47 & DPR-55, Revising Tech Specs Re Core Protection Safety Limits, Protective Sys Max Allowable Setpoints & Rod Position Limits.Replacement for Core Symmetry Test & Amend Fees Encl
ML19320D49116 July 1980Application for Amend to OL Revising Tech Spec 3.3.1.c Allowing Continued Operation of Unit 2 at Full Rated Power, While Maint Continues on HPI Pump Until 800718
ML19312B8015 July 1978Proposed Amend of Condition 2 to Licenses DPR-38,DPR-47 & DRP-55,allowing Receipt & Possession of Up to Four Fuel Assemblies Irradiated in Crystal River Unit 3