Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20134L3001997-02-10010 February 1997 Application for Amends to Licenses DPR-38,DPR-47 & DPR-55, Revising TS to Reduce Allowable RB Vol Leakage Rate Per Day Limit to Permit Relaxation of Certain Requirements for Operability of Prvs Sys ML16134A6741982-08-11011 August 1982 Application for Amend to License DPR-47,changing Tech Specs Re Reload Design Calculations for Cycle 7 ML20052F2401982-05-0303 May 1982 Application for Amend to DPR-55,changing Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits.Proposed Tech Specs, Cycle 7 Reload Rept & Fee Encl ML15223A7651982-01-12012 January 1982 Application to Amend Licenses DPR-38,DPR-47 & DPR-55, Changing Tech Spec Section 3.1.2 Re Heatup,Cooldown & Inservice Test Limitations for Rcs.W/Class I & II Fees ML16148A4401981-11-13013 November 1981 Application to Amend OL Changing Tech Specs Required to Support Operation at Full Rated Power During Cycle 6.Changes Concern Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits ML20010D2051981-08-19019 August 1981 Application for Amend to OL Revising Tech Specs to Extend Cycle 5 Operating Length to 390 Effective Full Power Days Allowing Continued Operation of Facility Until Scheduled Refueling Shutdown in Early Oct ML15223A7301981-05-29029 May 1981 Application for Amend of Licenses DPR-38,DPR-47 & DPR-55, Revising Tech Specs Re Core Protection Safety Limits, Protective Sys Max Allowable Setpoints & Rod Position Limits.Replacement for Core Symmetry Test & Amend Fees Encl ML19320D4911980-07-16016 July 1980 Application for Amend to OL Revising Tech Spec 3.3.1.c Allowing Continued Operation of Unit 2 at Full Rated Power, While Maint Continues on HPI Pump Until 800718 ML19312B8011978-07-0505 July 1978 Proposed Amend of Condition 2 to Licenses DPR-38,DPR-47 & DRP-55,allowing Receipt & Possession of Up to Four Fuel Assemblies Irradiated in Crystal River Unit 3 1997-02-10
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML15261A4641998-09-0404 September 1998 Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55, Respectively,Revising Current TSs Re Electrical Distribution Sys & Incorporate New Requirements for Sys Operation, Limiting Conditions for Operation & SR ML20198S2021998-01-19019 January 1998 Application for License Amend Request for Oconee Nuclear Station Isfsi,Changing Corporate Name of Licensee from Duke Power Co to Duke Energy Corp ML20134L3001997-02-10010 February 1997 Application for Amends to Licenses DPR-38,DPR-47 & DPR-55, Revising TS to Reduce Allowable RB Vol Leakage Rate Per Day Limit to Permit Relaxation of Certain Requirements for Operability of Prvs Sys ML16134A6741982-08-11011 August 1982 Application for Amend to License DPR-47,changing Tech Specs Re Reload Design Calculations for Cycle 7 ML20052F2401982-05-0303 May 1982 Application for Amend to DPR-55,changing Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits.Proposed Tech Specs, Cycle 7 Reload Rept & Fee Encl ML15223A7651982-01-12012 January 1982 Application to Amend Licenses DPR-38,DPR-47 & DPR-55, Changing Tech Spec Section 3.1.2 Re Heatup,Cooldown & Inservice Test Limitations for Rcs.W/Class I & II Fees ML16148A4401981-11-13013 November 1981 Application to Amend OL Changing Tech Specs Required to Support Operation at Full Rated Power During Cycle 6.Changes Concern Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits ML20010D2051981-08-19019 August 1981 Application for Amend to OL Revising Tech Specs to Extend Cycle 5 Operating Length to 390 Effective Full Power Days Allowing Continued Operation of Facility Until Scheduled Refueling Shutdown in Early Oct ML15223A7301981-05-29029 May 1981 Application for Amend of Licenses DPR-38,DPR-47 & DPR-55, Revising Tech Specs Re Core Protection Safety Limits, Protective Sys Max Allowable Setpoints & Rod Position Limits.Replacement for Core Symmetry Test & Amend Fees Encl ML19320D4911980-07-16016 July 1980 Application for Amend to OL Revising Tech Spec 3.3.1.c Allowing Continued Operation of Unit 2 at Full Rated Power, While Maint Continues on HPI Pump Until 800718 ML19312B8011978-07-0505 July 1978 Proposed Amend of Condition 2 to Licenses DPR-38,DPR-47 & DRP-55,allowing Receipt & Possession of Up to Four Fuel Assemblies Irradiated in Crystal River Unit 3 1998-09-04
[Table view] |
Text
REGULATORY NFORMATION DISTRIBUTION SEEM (RIDS)
ACCESSION NBR:8208240234 DOC.DATE: 82/08/11' NOTARIZED: YES DOCKET #
FACIL:50-287 Oconee Nuclear Station, Unit 3, D0uke Power Co. 05000287 AUTH.NAME AUTHOR AFFILIATION TUCGERHB, Duke Power Co.
RECIPNAME RECIPIENT AFFILIATION DENTONH.R. Office of Nuclear Reactor Regulation, Director STOLZJ.F. Operating Reactors Branch 4
SUBJECT:
Application for amend to License DPR-47,changing Tech Specs re reload design calculations for Cycle 7. 5& 0/ &
DISTRIBUTION CODE: AQO1S COPIES RECEIVED:LTR -. ENCLL0 SIZE:_- ,
TITLE: OR Submittal: General Distribution NOTES:AEOD/Ornstein:1cy, 05000287 C S-ra RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL 10 CODE/NAME LTTR ENCL ORB #4 BC 01 7 7 INTERNAL: ELD/HDS4 1 0 NRR/DHFS DEPYO8 1 1 NRR/DL DIR 1 1 ORAB 1 0 NRR/DSI/RAB I 1 EG FI 04 1 1 RGN2 1 1 EXTERNAL: ACRS 09 10 10 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 NOTES: 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 27
DUKE POWER COMPANY P. 0. BOX 33189 TELEPHONE: AREA 704 GENERAL OFFIAES 373-4011 422 SOUTH CHURCH STREET CHARLOTTE, N. C. 28242 August 11, 1982 Mr. Harold R. Denton., Director Office 6f Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. Johfi F: :Stolz, Chief Operating Reactors .Branch No. 4
Subject:
Oconee Nuclear Station Unit 3 Docket No. 50-287.
Dear Sir:
Pursuant to.10 CFR 50, 950.90, please find attached proposed changes to the Oconee Nuclear Station (ONS) Technical Specifications which are required to support the operation of Oconee Unit 3 at full rated power during Cycle 7. This submittal includes minor revisions to the reload results provided in our May 3, 1982 submittal. As indicated in the May 3, 1982 letter, Oconee Unit 3 was shut down to begin the refueling cycle 17 EFPD short of the Cycle 7 window as included in that report; thus, a reanalysis was required.
Startup testing of Oconee Unit 3, Cycle 7 will be performed in accordance with the report entitled, "Oconee Nuclear Station Generic Startup Physics Test Program",
initially approved by NRC letter dated March 23, 1981 and as modified by Duke letter dated May 29, 1981. The current schedule at Oconee is dictated by the repairs to the Auxiliary Feedwater Headers, but a review and response by Septem ber 27, 1982 is requested to ensure the unit can be restarted when the repairs are complete.
This proposed license amendment concerning the reload design.calculations for Oconee 3, Cycle 7 was conducted consistent with Duke Technical Report NFS-1001, "Oconee Nuclear Station Reload Design Methodology" which was reviewed and accepted by the Staff in a letter dated July 29, 1981. This submittal provides minor revisions to our May 3, 1982 submittal and thus, no additional fees are necessary.
Very truly yours, H. B. Tucker, Vice President Nuclear Production Department JFN/php Attachment 820 8 24O~A 0.
Mr. Harold R. Denton, Director August 11, 1982 Page 2 cc: Mr. James P.. O'Reilly, Regional Administrator 1U. S. Nuclear Regulatory -Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. W. T. Orders NRC Resident Inspector Oconee Nuclear Station
Mr. Harold R. Denton, Director August 11, 1982 Page 3 H. B. TUCKER, being duly sworn,, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.
H. B. Tucker, Vice President Subscribed and sworn to before me this 11th day of August, 1982 Notary Public My Commission Expires:
Febiuary 15, 1987