ML16148A440

From kanterella
Jump to navigation Jump to search
Application to Amend OL Changing Tech Specs Required to Support Operation at Full Rated Power During Cycle 6.Changes Concern Core Protection Safety Limits,Protective Sys Max Allowable Setpoints & Rod Position Limits
ML16148A440
Person / Time
Site: Oconee 
Issue date: 11/13/1981
From: Parker W
Duke Power Co
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML16148A441 List:
References
NUDOCS 8111170371
Download: ML16148A440 (4)


Text

RE&GUL,tr4RY*FR-V1ATIO\\i DISTRIBUTION SlW MW (RIDS)

CESi, WBRI81.114-70.371 DUC.DATE:v 81/14/.13 NOTARIZED:; YES' 00OZKETn FACILI:50 ',-2170 Oconeei Nuclear Statibn, Un~; t, 2',. Duke' Povqer Cb; 050.00270 AUTHI.NAMEI AUfl-m AFFILlATION

?ARKEWr',.O's Dukal Power: Co..

R EC IP.-NAMEA RECIPIENTI AFFILIAfION STOLZ,Ji,F.

Ober 'ting. Resctors Branch, 4 SUBJECXT:; A~pl icatil ot t'o, amen,;. OQL; changing.

thl Specs required,: to supportt: operation ait: fufll rated power-, during9, Cycli 5.Chanqe&5' concern corei protection; saftty 1liritsfprotettive! syS% TijoX al a~fWbie' 1oDts & rod position: limits..

DISTRIBUTIOJN CODE!:

AOP01S:

LOPIES RECEIVE:LTR ENCLI 9W_% SIZE 3

+/-Z TITLEV: Gene'ral: D-is~ribution, for' if'teri Vssuance'of Operating, License

'OTES:AOD/Ornste, n:,,Icc-050,00270*

RECIPIENT!

COPIES; RECIPIENT:

COPIES' I0( COOE'/NAM:EI LTITR ENCLt ID C0?NMI rr NL ACTIION::

OR31 44~ BC, 0i 13; 13 INTERNAL,:: ELO) 1 0

1;&E

~

W6 2

2'

,NR',,YDHFS DEPY05.

11 1

IJRR,/DLI DIR 14 1

N1 X4A 0

MIRR /DS I,-/ R AB I

1I 0;!;; := IL ll 041' 1 EXTERNALl. A CR-0.9 1

lb 1 LFD-R 03i N RC P D R 0?

1-. 1 N ST.C 05 1

Wz TWfAL NU. 18ERI OF. COPIES' REQUIRED:.' LfTTR ENCLt

-4f

DUKE POWER COMPANY POWER BUILDING 422 SOUTH CHURCH STREET, CHARLOTTE, N. C. 28242 WILLIAM 0. PARKER,JR.

VICEPRESIDENT TELEPHONE: AREA 704 STEAM PRODUCTION November 13, 1981 373-4083 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Mr. J. F. Stolz, Chief Operating Reactors Branch No. 4

Subject:

Oconee Nuclear Station Unit 2 Docket No. 50-270

Dear Sir:

Pursuant to 10CFR50, 550.90, please find attached proposed changes to the Oconee Nuclear Station (ONS) Technical Specifications which are required to support the operation of Oconee Unit 2 at full rated power during Cycle 6.

This proposal contains changes which concern the following:

1. Core Protection Safety Limits of Specification 2.1;
2. Protective System Maximum Allowable Setpoints of Specification 2.3;
3. Rod Position Limits of Specification 3.5.2.

Also attached is Babcock and Wilcox Report BAW-1691, "Oconee Unit 2, Cycle 6 Reload Report."

This report includes a summary of Cycle 6 operating param eters and contains the safety analyses supporting the operation of Oconee 2, Cycle 6 core at rated power in accordance with the Technical Specifications provided.

Startup testing of Oconee Unit 2, Cycle 6 will be performed in accordance with the.report entitled, "Oconee Nuclear Station Generic Startup Physics Test Program", initially approved by NRC letter dated March 23, 1981 and as modified by Duke letter dated May 29, 1981.

This proposed revision to the ONS Technical Specifications is considered to be a Class IV amendment. Therefore, pursuant to 10CFR170, §170.12, please find enclosed a check in the amount of $12,300 for all applicable licensing fees.

8111170371 8111131)

I PDR ADOCK 05000270)

P PDR

Mr. Harold R. Denton, Director November 13, 1981 Page 2 Very truly yours, William 0.. Parker, Jr.

JLJ/php Attachments

Mr. Harold R. Denton, Director November 13, 1981 Page 3 WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this request for amendment of the Oconee Nuclear Station Technical Specifications, Appendix A to Facility Operating Licenses DPR-38, DPR-47 and DPR-55; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

William 0. Parker, Jr., Ace President Subscribed and sworn to before me this 13th day of November, 1981 Notary Public My Commission Expires:

September 20, 1984