IR 05000297/1999201 | 2 March 1999 | Insp Rept 50-297/99-201 on 990209-12.No Violations Noted. Major Areas Inspected:Routine,Announced Insp Included Onsite Review of Various Aspects of Licensee Programs Concerning Conduct of Operations & Emergency Preparedness | |
ML20217C050 | 18 March 1998 | Notice of Violation from Insp on 980120-23.Violation Noted: Licensee Developed Various Health Physics Instructions That Were Reviewed & Approved by Reactor Health Physicist,But Not by Radiation Protection Committee | |
ML20217C072 | 18 March 1998 | Insp Rept 50-297/98-201 on 980120-23.Violations Noted.Major Areas inspected:on-site Review of Selected Aspects of Licensee Class II Nonpower Research Reactor Operation Including;Safeguards,Security Program & Matl Control | |
IR 05000297/1997201 | 9 September 1997 | Insp Rept 50-297/97-201 on 970609-12.No Violations Noted. Major Areas Inspected:Review of Selected Conditions & Records Since Last Insp & Verification of CA Previously Committed to by Licensee | |
IR 05000297/1993002 | 15 October 1993 | Partially Withheld Insp Rept 50-297/93-02 on 930928-29 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected: Procedures,Fixed Site Physical Protection of Special Nuclear Matl of Low Strategic Significance & Matl Control | |
ML20217C669 | 8 July 1991 | Exam Rept 50-297/OL-91-01 on 910603-04.Exam Results:Both Applicants Passed Exam | |
IR 05000297/1990002 | 14 November 1990 | Insp Rept 50-297/90-02 on 901029-1101.No Violations or Deviations Noted.Major Areas Inspected:Review & Oversight of Reactor Activities | |
IR 05000297/1989003 | 28 September 1989 | Partially Withheld Insp Rept 50-297/89-03 on 890907 (Ref 10CFR2.790).No Violations or Deviations Noted.Major Areas Inspected:Nuclear Matl Accounting Records & Repts & Physical Inventory | |
IR 05000297/1989002 | 15 September 1989 | Partially Withheld Insp Rept 50-297/89-02 on 890817 (Ref 10CFR2.790).No Noncompliance Noted.Major Areas Inspected: Plans & Procedures,Repts of Safeguards Events & Fixed Site Physical Protection of SNM of Low Strategic Significance | |
ML20245G232 | 2 August 1989 | Notice of Violation from Insp on 890628-30.Violations Noted: Failure to Provide Adequate Training to Radiation Safety Ofc Personnel Performing Contamination Surveys & Failure to Follow Environ Procedures for Collecting Air Filters | |
ML20245G237 | 1 August 1989 | Insp Rept 50-297/89-01 on 890628-30.Violation Noted Major Areas Inspected:Staff Organization,Training,Radiation Control & Surveillance Activities,Environ Monitoring & Transportation Activities | |
ML20205R000 | 2 November 1988 | Notice of Violation from Insp on 880926-29.Violation Noted: Failure to Have & Maintain Approved Procedures Utilized by Radiation Protection Ofc to Conduct Liquid Effluent & Environ Sample Radiological Analyses | |
IR 05000297/1988004 | 31 October 1988 | Insp Rept 50-297/88-04 on 880926-29.Violations Noted.Major Areas Inspected:Onsite Review of Licensee Radiation Protection Program,Including Staff Organization,Training, Radiation Control & Surveillance Activities | High Radiation Area Stolen |
ML20195J364 | 13 June 1988 | Notice of Violation from Insp on 880523-26.Violation Noted: Reactor Safeguards Advisory Group Did Not Meet During 870408-880225 | |
IR 05000297/1988003 | 9 June 1988 | Insp Rept 50-297/88-03 on 880523-26.Violation Noted.Major Areas Inspected:Recent Activities to Reduce & Monitor Pool Leakage & Completed Biennial Insp of Licensee | Nondestructive Examination Unidentified leakage |
ML20154D256 | 5 May 1988 | Exam Rept 50-297/OL-88-02 on 880426.Exam Results:Reactor Operator Passed | |
IR 05000297/1988001 | 4 April 1988 | Insp Rept 50-297/88-01 on 880301-04.No Violations or Deviations Noted.Major Areas Inspected:Leaks in RCS Piping Outside Reactor Bldg & in Isolable Portion of Reactor Primary Sys within Bldg | Hydrostatic Unidentified leakage |
PNO-II-88-015B, on 880229,licensee Informed NRC That 1 Mwt Pool Reactor Had Been Shutdown Due to Primary Coolant Leak Outside Containment.Two Leaks Identified.Util Plans to Isolate Leak & Test Further to Assure That Leak Is in Liner | 24 March 1988 | PNO-II-88-015B:on 880229,licensee Informed NRC That 1 Mwt Pool Reactor Had Been Shutdown Due to Primary Coolant Leak Outside Containment.Two Leaks Identified.Util Plans to Isolate Leak & Test Further to Assure That Leak Is in Liner | |
PNO-II-88-015A, analysis of Reactor Water Sample Indicates That Concentrations of Radionuclides Less than NRC Limit for Release to Unrestricted Area.Cold Leg Has Been Drained & Leg Currently Being Drained | 3 March 1988 | PNO-II-88-015A:analysis of Reactor Water Sample Indicates That Concentrations of Radionuclides Less than NRC Limit for Release to Unrestricted Area.Cold Leg Has Been Drained & Leg Currently Being Drained | |
PNO-II-88-015, on 880229,licensee Informed NRC That Unit,A 1 Mwt Pool Reactor Had Been Shut Down Due to Primary Coolant Leak Outside Containment.Region II Has Dispatched Both Health Physics & Operations Inspector to Review Event | 1 March 1988 | PNO-II-88-015:on 880229,licensee Informed NRC That Unit,A 1 Mwt Pool Reactor Had Been Shut Down Due to Primary Coolant Leak Outside Containment.Region II Has Dispatched Both Health Physics & Operations Inspector to Review Event | |
ML20150B237 | 23 February 1988 | Exam Rept 50-297/OL-88-01 on 880202-03.Exam Results:One of Two Reactor Operators Passed Written Exam & Operating Exam & Senior Reactor Operator Passed Both Exams | |
PNO-V-88-013A, on 880114,reactor Bldg Overpressurization Occurred.Investigation Revealed That High/Low Pressure Trip Circuit for Train 'B' Fan Trip Circuit Inoperable.Licensee Continuing Investigation to Determine Root Cause | 19 February 1988 | PNO-V-88-013A:on 880114,reactor Bldg Overpressurization Occurred.Investigation Revealed That High/Low Pressure Trip Circuit for Train 'B' Fan Trip Circuit Inoperable.Licensee Continuing Investigation to Determine Root Cause | |
ML20235W080 | 9 October 1987 | Notice of Violation from Insp on 870929-30.Violation Noted: Operating Procedures for Radiation Control Not Written &/Or Followed for Listed Incidents | |
ML20235W088 | 7 October 1987 | Insp Rept 50-297/87-03 on 870929-30.Violations Noted. Major Areas Inspected:Internal & External Exposure Control & Assessment,Control of Radioactive Matl & Contamination, Surveys,Monitoring & Transportation of Radioactive Matl | High Radiation Area |
ML20206D385 | 2 April 1987 | Notice of Violation from Insp on 870316-18 | |
IR 05000297/1987001 | 27 March 1987 | Insp Rept 50-297/87-01 on 870316-18.Violations Noted:Failure to Post Required Documents,Failure to Comply W/Dot Requirements for Transportation of Radioactive Matls & Failure to Verify Authorization of Intended Recipient | High Radiation Area |
IR 05000297/1986002 | 4 June 1986 | Partially Withheld Insp Rept 50-297/86-02 on 860521-22 (Ref 10CFR2.790 & 73.21).No Noncompliance Noted.Major Areas Inspected:Plans & Procedures,Safeguards Events Repts & Low Strategic Significance SNM Fixed Physical Protection | |
ML20211A438 | 19 May 1986 | Exam Rept 50-297/OL-86-01 on 860423-24.Exam Results:All Five Candidates Passed Oral & Written Exams | Shutdown Margin |
IR 05000297/1986001 | 14 May 1986 | Insp Rept 50-297/86-01 on 860414-18.No Violation or Deviation Noted.Major Areas Inspected:Biennial Research Reactor Insp,Including Logs & Records,Review & Audit, Requalification Training & Procedures | Shutdown Margin |
ML20054H098 | 21 April 1982 | Notice of Violation from Insp on 820315-19 | |
IR 05000111/1982002 | 21 April 1982 | IE Insp Repts 50-111/82-02 & 50-297/82-01 on 820315-19. Noncompliance Noted:Control Room Left Unattended & Reactor Safeguards Advisory Group Not Convened Semiannually | Fuel cladding |
IR 05000160/1978004 | 20 October 1978 | IE Inspec Repts 50-160/78-04, 50-276/78-02, 50-297/78-04 & 70-0386/78-04 on 780926-27 During Which No Items of Noncompliance Were Noted.Major Areas Inspec Incl:Nuc Matl Control & Accounting Procedures Review | |
IR 05000297/1978003 | 2 October 1978 | Inspec Rept 50-297/78-03 on 780817 During Which No Items of Noncompliance Were Noted.Major Area Inspected:Physical Security Plan |