Issue date | Title | Topic | |
---|---|---|---|
ML19325E900 | 19 October 1989 | Forwards Text of Info Communicated to All Util W/ Westinghouse NSSS Design on Pressurizer Safety Valve Set Pressure Deviation Info Request Response | Loop seal |
ML18031B136 | 16 January 1987 | Forwards Updates of TVA Activities for Wks of 870119 & 26 | |
ML20213F383 | 15 July 1985 | Requests Suspension of Low Power Testing at Facility Until Investigation of Accident Causing Hot Shutdown of Plant & Review of Training of Personnel & Condition of Equipment Complete | |
ML20213F387 | 11 July 1985 | Requests Immediate Halt of Low Power Testing at Facility Until Investigation of 850710 Accident in Which Valve Sys in Primary Containment Bldg Improperly Left Open Releasing Gas Into Atmosphere Complete | |
ML20102A353 | 11 July 1984 | FOIA Request for W Butler 810407 Memo Re H2 Combustion, Evaluation of Glow Plug Igniter Concept for Use in Sequoyah Nuclear Plant, & M Berman 830524 Memo Re Mod of Nuclear Reactor Containment Atmosphere | |
ML20127B808 | 8 June 1984 | Advises That Responses to Questions Re Safety Significance of Low Power or Normal Operation W/Tech Spec & Surveillance Procedure Errors Raised in Congressman Markey Inadequate | |
ML20023D555 | 19 May 1983 | Requests to Make Limited Appearance Statement at OL Hearings | |
ML20073P879 | 25 April 1983 | Provides Info on ECCS Analyses & Max & Min Upper Head Injection Delivery Vol Consistent W/Plant Tank Nominal Setpoint Results | |
ML19290C732 | 5 February 1980 | Confirms That,Effective 800211,limit of Liability Under Policy NF-247 Issued to TVA Will Be Increased to $124 Million | |
ML19269E959 | 12 September 1979 | Forwards Responses to Geosciences Branch Questions Transmitted by 790810 Ltr.Responses Will Be Incorporated in Amend 62 to FSAR.W/15 Oversized Drawings | |
ML20137H026 | 27 June 1978 | Announces Signing of Renegotiated Contracts W/Dow Chemical Co for Supply to Dow of Steam from Util Plant & Electricity from Util Electric Sys | |
ML20137D635 | 9 January 1978 | Requests Delay in Issuance of Ols,Pending Resolution of Cluster of 46 micro-earthquakes Northwest of Lake Anna Dam. Site Seismic Design Questioned | Earthquake |
ML20086D481 | 20 June 1977 | Advises That Addl Conservatism Being Administratively Added to Tech Specs for Max Critical Power Ratio Limits,In Light of GE | |
ML20085G980 | 8 September 1973 | Telecopy AO BFAO-739T:on 730908,fuse Blown in HPCI Inverter Power Supply.Reactor Pressure Immediately Reduced to 120 Psig | |
ML20235D829 | 7 September 1971 | Requests Copies of 710422 Twx Re 710422-0505 Plant Operation W/Inoperative HPCI Sys & AEC 710429 Reply Sent to Util & G Merritt of State of Mn Pollution Control Agency | |
ML19329D326 | 15 March 1971 | Confirms 710208 Decision Withdrawing as Intervenor & Witness in Midland & Shoreham Hearings.Certificate of Svc Encl | |
ML20084V115 | 29 September 1969 | Submits Results of Investigation of RCPB Valves | |
ML20101U669 | 5 July 1968 | Responds to Re Release of Two Remaining Stub Tubes for Repair.Unable to Determine How Meaningful Info Could Be Obtained from Surveillance Program to Expose Clad & Unclad Samples of Stub Tube Matl | |
ML20084C182 | 25 June 1968 | Responds to NRC Re Release of Two Remaining Stub Tubes for Repair.Insufficient Technical Justification Exists to Phase Out Tube Sample Surveillance Program.Stub Tube Repair Operation Proceeding W/O Sample Surveillance Program | |
ML20235A305 | 28 September 1964 | Lists Util Representatives Who Will Attend ACRS 641007 Meeting in Washington,Dc to Discuss Bodega,Per 640928 Telcon | |
ML20234F148 | 12 May 1964 | Requests That Bodega Questions Be Sent by Collect Telegram, Per Telcon | |
ML20234A761 | 8 May 1964 | Twx Requesting Response to & Stds for Control Rods | |
ML20234E205 | 30 April 1964 | Informs That Listed Persons Will Be Brought to ACRS 640508 Meeting | |
ML20234B905 | 25 July 1963 | Informs That If Meeting Desired for Util Bodega Bay Earthquake design,630801 & 02 Dates Preferred | Earthquake |
ML20235A645 | 12 June 1963 | Informs That Calls for Rd Not Received | |
ML20234B985 | 12 June 1963 | Informs That Amends 3 to Suppl & Parts I & III Forms Will Be Mailed on 630613 | |
ML20234B155 | 26 April 1963 | Advises That Proposal Submitted to GE on Scope Limited to Dynamic Analysis of GE Installations for Ground Motion Specified by Util Not Yet Accepted | Earthquake |