ML20096H45220 May 1992Rev 0 to WVNS-PCP-002, Process Control Plan for Cement Solidification of Sludge Wash Liquid
ML20097G68213 May 1992Rev 0 to WVNS-TP-051, Test Procedure Sludge Wash Cement- Waste Cores:Windows of Composition
ML20096F36612 May 1992Revised Operational Safety Requirements (Osr)/Technical Requirements West Valley Demonstration Project Index & Cancelled Rev 1 to OSR-IRTS-10, Criticality Control During Processing of HLW Through Ion Exchange Columns..
ML20097G67930 April 1992Rev 0 to WVNS-TRO-051, Test Request Sludge Wash Cement- Waste Cores Windows of Composition
ML20096C11024 April 1992Rev 3 to OSR/GP-1, Wvdp Operational Safety Requirements
ML20094G69925 February 1992Operational Readiness Review Plan for Resumption of Irts Operations,Hlw Treatment Phase II - Sludge Wash
ML20091K4649 January 1992Addenda 1,2a,2b & 2c to Rev 5 to WVDP-022, Emergency Plan & Procedures Manual
ML20094E51631 December 1991Rev 10 to WVDP-019, Waste Mgt PlanGrab sample
Met Tower
Earthquake
ML20097G67515 November 1991Rev 2 to WVNS-TPL-70-12, Test Plan Cement Waste Form Qualification of Sludge Wash Liquids
ML20079K32311 October 1991Rev 7 to TR/IRTS-5, Operational Safety Requirements
ML20083F37020 September 1991Rev 0 to Test Procedure WVNS-TP-028B, Water-to-Cement Ratio Variance in Simulated Sludge Wash
ML20079E0085 September 1991Rev 1 to Test Plan WVNS-TPL-70-11, Test Plan for Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid
ML20083E92014 August 1991Rev 0 to TR-IRTS-11, Fissile Matl Mass Balance Across Lwts Evaporator
ML20083F37513 August 1991Rev 0 to Test Procedure WVNS-TP-034, Confirmatory Cube
ML20085K9549 August 1991Rev 0 to OSR-IRTS-10, Criticality Control During Processing of High Level Waste Through Ion Exchange Columns Containing Ti-Treated Zeolite
ML20083F37230 July 1991Rev 0 to Test Summary Rept WVNS-TSR-025, Waste Form Qualification for Cement Solidification of Sludge Wash Liquids
ML20091C22424 July 1991DOE West Valley Project Ofc Operational Readiness Review Plan for Resumption of Integrated Radwaste Treatment Sys Operations,High Level Waste Treatment Phase II - Sludge Wash
ML20083F36016 July 1991Rev 1 to Test Procedure WVNS-TP-028 a, Procedure for Development of Process Control Parameters for Cement Solidification of Sludge Wash Liquids
ML20083F3779 July 1991Rev 0 to Test Request WVNS-TRQ-034, Production of Cement Product from Actual Lab Sludge Wash Liquid
ML20024G98314 May 1991Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid.Safe Shutdown
ML20079B12814 March 1991Draft Rev 0 to Operational Safety Requirement OSR-IRTS-10, Criticality Control During Processing of High-Level Waste Through Ion Exchange Columns Containing TI-Coated Zeolite
ML20079B12131 January 1991Draft E of Rev 7 to Technical Requirement TR/IRTS-5, STS Process Limits
ML20079B12431 January 1990Rev 2 to Operational Safety Requirement OSR/GP-7, Criticality Safety for Liquid Transfers
ML19325F38530 November 1989Rev 0 to WVDP-078, West Valley Demonstration Project Site Specific Plan.Open House
ML19332C8919 November 1989Rev 5 to West Valley Demonstration Project Operation Safety Requirements Document TR-IRTS-5, STS Process Limits.
ML20247D0405 July 1989Rev 3 to TR-IRTS-4, Operational Safety Requirements
ML20097G6844 November 1988Rev 1 to WVNS-TPL-70-7, Test Plan Long Term Testing of Cement Waste Form
ML20040C22931 December 1981Nuclear Matl Control & Accountability Plan for West Valley Nuclear Svcs Co,Inc,West Valley Demonstration Project
ML20011B12631 October 1981West Valley Demonstration Project Environ Safety & Health Program Plan.Non-Destructive Examination
Fire Protection Program
ML19323A21711 March 1980Standy Power Usage, Revision 1