MONTHYEARML20096H4521992-05-20020 May 1992 Rev 0 to WVNS-PCP-002, Process Control Plan for Cement Solidification of Sludge Wash Liquid ML20097G6821992-05-13013 May 1992 Rev 0 to WVNS-TP-051, Test Procedure Sludge Wash Cement- Waste Cores:Windows of Composition ML20096F3661992-05-12012 May 1992 Revised Operational Safety Requirements (Osr)/Technical Requirements West Valley Demonstration Project Index & Cancelled Rev 1 to OSR-IRTS-10, Criticality Control During Processing of HLW Through Ion Exchange Columns.. ML20097G6791992-04-30030 April 1992 Rev 0 to WVNS-TRO-051, Test Request Sludge Wash Cement- Waste Cores Windows of Composition ML20096C1101992-04-24024 April 1992 Rev 3 to OSR/GP-1, Wvdp Operational Safety Requirements ML20094G6991992-02-25025 February 1992 Operational Readiness Review Plan for Resumption of Irts Operations,Hlw Treatment Phase II - Sludge Wash ML20091K4641992-01-0909 January 1992 Addenda 1,2a,2b & 2c to Rev 5 to WVDP-022, Emergency Plan & Procedures Manual ML20094E5161991-12-31031 December 1991 Rev 10 to WVDP-019, Waste Mgt Plan ML20097G6751991-11-15015 November 1991 Rev 2 to WVNS-TPL-70-12, Test Plan Cement Waste Form Qualification of Sludge Wash Liquids ML20079K3231991-10-11011 October 1991 Rev 7 to TR/IRTS-5, Operational Safety Requirements ML20083F3701991-09-20020 September 1991 Rev 0 to Test Procedure WVNS-TP-028B, Water-to-Cement Ratio Variance in Simulated Sludge Wash ML20079E0081991-09-0505 September 1991 Rev 1 to Test Plan WVNS-TPL-70-11, Test Plan for Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid ML20083E9201991-08-14014 August 1991 Rev 0 to TR-IRTS-11, Fissile Matl Mass Balance Across Lwts Evaporator ML20083F3751991-08-13013 August 1991 Rev 0 to Test Procedure WVNS-TP-034, Confirmatory Cube ML20085K9541991-08-0909 August 1991 Rev 0 to OSR-IRTS-10, Criticality Control During Processing of High Level Waste Through Ion Exchange Columns Containing Ti-Treated Zeolite ML20083F3721991-07-30030 July 1991 Rev 0 to Test Summary Rept WVNS-TSR-025, Waste Form Qualification for Cement Solidification of Sludge Wash Liquids ML20091C2241991-07-24024 July 1991 DOE West Valley Project Ofc Operational Readiness Review Plan for Resumption of Integrated Radwaste Treatment Sys Operations,High Level Waste Treatment Phase II - Sludge Wash ML20083F3601991-07-16016 July 1991 Rev 1 to Test Procedure WVNS-TP-028 a, Procedure for Development of Process Control Parameters for Cement Solidification of Sludge Wash Liquids ML20083F3771991-07-0909 July 1991 Rev 0 to Test Request WVNS-TRQ-034, Production of Cement Product from Actual Lab Sludge Wash Liquid ML20024G9831991-05-14014 May 1991 Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid. ML20079B1281991-03-14014 March 1991 Draft Rev 0 to Operational Safety Requirement OSR-IRTS-10, Criticality Control During Processing of High-Level Waste Through Ion Exchange Columns Containing TI-Coated Zeolite ML20079B1211991-01-31031 January 1991 Draft E of Rev 7 to Technical Requirement TR/IRTS-5, STS Process Limits ML20079B1241990-01-31031 January 1990 Rev 2 to Operational Safety Requirement OSR/GP-7, Criticality Safety for Liquid Transfers ML19325F3851989-11-30030 November 1989 Rev 0 to WVDP-078, West Valley Demonstration Project Site Specific Plan. ML19332C8911989-11-0909 November 1989 Rev 5 to West Valley Demonstration Project Operation Safety Requirements Document TR-IRTS-5, STS Process Limits. ML20247D0401989-07-0505 July 1989 Rev 3 to TR-IRTS-4, Operational Safety Requirements ML20097G6841988-11-0404 November 1988 Rev 1 to WVNS-TPL-70-7, Test Plan Long Term Testing of Cement Waste Form ML20040C2291981-12-31031 December 1981 Nuclear Matl Control & Accountability Plan for West Valley Nuclear Svcs Co,Inc,West Valley Demonstration Project ML20011B1261981-10-31031 October 1981 West Valley Demonstration Project Environ Safety & Health Program Plan ML19323A2171980-03-11011 March 1980 Standy Power Usage, Revision 1 1992-05-20
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20096H4521992-05-20020 May 1992 Rev 0 to WVNS-PCP-002, Process Control Plan for Cement Solidification of Sludge Wash Liquid ML20097G6821992-05-13013 May 1992 Rev 0 to WVNS-TP-051, Test Procedure Sludge Wash Cement- Waste Cores:Windows of Composition ML20096F3661992-05-12012 May 1992 Revised Operational Safety Requirements (Osr)/Technical Requirements West Valley Demonstration Project Index & Cancelled Rev 1 to OSR-IRTS-10, Criticality Control During Processing of HLW Through Ion Exchange Columns.. ML20097G6791992-04-30030 April 1992 Rev 0 to WVNS-TRO-051, Test Request Sludge Wash Cement- Waste Cores Windows of Composition ML20096C1101992-04-24024 April 1992 Rev 3 to OSR/GP-1, Wvdp Operational Safety Requirements ML20094G6991992-02-25025 February 1992 Operational Readiness Review Plan for Resumption of Irts Operations,Hlw Treatment Phase II - Sludge Wash ML20091K4641992-01-0909 January 1992 Addenda 1,2a,2b & 2c to Rev 5 to WVDP-022, Emergency Plan & Procedures Manual ML20094E5161991-12-31031 December 1991 Rev 10 to WVDP-019, Waste Mgt Plan ML20097G6751991-11-15015 November 1991 Rev 2 to WVNS-TPL-70-12, Test Plan Cement Waste Form Qualification of Sludge Wash Liquids ML20079K3231991-10-11011 October 1991 Rev 7 to TR/IRTS-5, Operational Safety Requirements ML20083F3701991-09-20020 September 1991 Rev 0 to Test Procedure WVNS-TP-028B, Water-to-Cement Ratio Variance in Simulated Sludge Wash ML20079E0081991-09-0505 September 1991 Rev 1 to Test Plan WVNS-TPL-70-11, Test Plan for Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid ML20083E9201991-08-14014 August 1991 Rev 0 to TR-IRTS-11, Fissile Matl Mass Balance Across Lwts Evaporator ML20083F3751991-08-13013 August 1991 Rev 0 to Test Procedure WVNS-TP-034, Confirmatory Cube ML20085K9541991-08-0909 August 1991 Rev 0 to OSR-IRTS-10, Criticality Control During Processing of High Level Waste Through Ion Exchange Columns Containing Ti-Treated Zeolite ML20091C2241991-07-24024 July 1991 DOE West Valley Project Ofc Operational Readiness Review Plan for Resumption of Integrated Radwaste Treatment Sys Operations,High Level Waste Treatment Phase II - Sludge Wash ML20083F3601991-07-16016 July 1991 Rev 1 to Test Procedure WVNS-TP-028 a, Procedure for Development of Process Control Parameters for Cement Solidification of Sludge Wash Liquids ML20083F3771991-07-0909 July 1991 Rev 0 to Test Request WVNS-TRQ-034, Production of Cement Product from Actual Lab Sludge Wash Liquid ML20024G9831991-05-14014 May 1991 Waste Form Qualification Program for Cement Solidification of Sludge Wash Liquid. ML20079B1281991-03-14014 March 1991 Draft Rev 0 to Operational Safety Requirement OSR-IRTS-10, Criticality Control During Processing of High-Level Waste Through Ion Exchange Columns Containing TI-Coated Zeolite ML20079B1211991-01-31031 January 1991 Draft E of Rev 7 to Technical Requirement TR/IRTS-5, STS Process Limits ML20079B1241990-01-31031 January 1990 Rev 2 to Operational Safety Requirement OSR/GP-7, Criticality Safety for Liquid Transfers ML19325F3851989-11-30030 November 1989 Rev 0 to WVDP-078, West Valley Demonstration Project Site Specific Plan. ML19332C8911989-11-0909 November 1989 Rev 5 to West Valley Demonstration Project Operation Safety Requirements Document TR-IRTS-5, STS Process Limits. ML20247D0401989-07-0505 July 1989 Rev 3 to TR-IRTS-4, Operational Safety Requirements ML20097G6841988-11-0404 November 1988 Rev 1 to WVNS-TPL-70-7, Test Plan Long Term Testing of Cement Waste Form ML20040C2291981-12-31031 December 1981 Nuclear Matl Control & Accountability Plan for West Valley Nuclear Svcs Co,Inc,West Valley Demonstration Project ML20011B1261981-10-31031 October 1981 West Valley Demonstration Project Environ Safety & Health Program Plan ML19323A2171980-03-11011 March 1980 Standy Power Usage, Revision 1 1992-05-20
[Table view] |
Text
b ll
,Q y}G l.-
Records Management t-Fmm : Ext 4074, MS 52 Lew #. HF:92:0562
- Date May 12, 1992
. Subject Controlled Dis.ibution of Revisions to the Operational Safety Requirements / Technical Requirements, Volume VI To Distribution ec:
Original, MS-50B Attached are the following revisions to the Operational Safety Requirements / Technical Requirements, Volume VI, which has been assigned to you under controlled distribution:
e Latest Index OSR-IRTS-10, Rev.1
" Criticality Control During Procesung of e
High Level Waste through lon Exchange Columns Containing Ti Treated Zeolite" CANCELLED Destroy or mark superseded the current Index, and ORS-IRTS-10, Rev. O, (3
and place the attached revisions in your controlled manual accordingly.
L)
Copies made from a controlled document are to be marked UNCONTROLLED before distribution.
To acknowledge receipt of these documents, sign, date, and return the attached controlled distribution receipt acknowledgement to the undersigned by May 27,-1992.
For your conv
'ence, a self-addressed, stamped envelope (off-site recipients only) has been provided.
For on-site recipierts, a return address has been placed on the reverse side of the controlled distribution receipt acknowledger.ent; fold and place in the mail.
(
1 A O N _..
CA.
B. E. Lindbehhr-R1li:ords Proce so Records Management West Valley Nuclear Services Co., Inc.
BEL du -
fv t4:
5 Approved:
C. M. Schiffhaunt, Manager
Attachment:
As stated above pU l}>
./
{\\jI PRC0164.R12 I
I 9205210110 920512 DR PROJ l
ri-32 PDR
e OPERATION ^L SAPETY REQUIREMENTS /TECilNICAL REQUIREMENTS VLST VALLEY DEMONSTRATION PROJECT INDEX former WDP, NTS WDP j
Identif*er_
Ram Title / Contents identiflgIs OSR/GP 1 3
WDP Airborne Radioactive M.11.5.2.4 Release Limits WDP 4.1 OSR CP 1 OSR/TR GP 1 OSR/GP 2 2
Radioactivity Content of Liquid M.11.5.2.5.
Ef fluents Released frva WDP WDP 4.2 OSR CP 2 OSR/TR GP 2 OSR/GP 3 4
Building and Vessel Ventilation H.11.5.2.1.
Systems Operability NFS 5.3, STS 1.1, 1.2, CSS 4.1, 4.2, SRF 8.2, LVTS 5.1 M.11.5.2.7.
WDP 4.14 LWTS 5.2, 4'
NFS 6.5, STS 1.2, CSS 4.2 M 11.5.2.8.
TVS 3.0 M.11.5.2.1 VF 2.2, 2.3 OSR GP 3 OSR/TR GP.3 OSP/GP 4 2
Elfluent and Environmental H.11.5.2.1.B.X Monitoring (WDP 5.1)
OSR CP 4 OSR/TR GP 4 O
PRC0164.R12 i
DATED: 05-12 92
. =.
4 OPERATIONAL SAFET'l REQUIREMENTS / TECHNICAL REQUIkEMENTS VEST VALLEY DEMONSTRATICH PROJECT i
INDEX
.f VVDP Former VVDP, NFS Identifier-Etyt Title / Contents Identifiers 4
OSR/GP 5 3
VVDP Emergency Power Requirements M.11.5.4.3.
NFS 6.4 M.11.5.2.1.D STS 1.3 M.11.5.2.1.0 CSS 4.4 OSR GP 5 OSR/TR CP 5 TR/GP 6 2
Storag) Fequirements for M.11.5.2.1.J Low + Level Waste LAG 1 LAG 2 M 11.5.2.1.1 SRF 8.4 TR GP 6 03R/TR GP 6 OSR/GP 7 2
Criticality Safet) for Liquid M.11.5.2.2.
Transfer VVDP 4.3 OSR GP 7 p
OSd/TR CP 7
(, f 71/GP 8 2
Vater Activity Alarms M.11.5.4.1.
NFS 6.9 TR GP 8 OSR/TR GP 8 TR/GP 9 2
Control of Plant Equipment New Function and Canfiguration TR GP 9 OSR/TR GP 9 OSR/GPi10 2
Airborni Effluent Monitoring M.11.5.4.4.
System Operability NFS 6.5 STS 1.1, 1.2 CSS 4.1 OSR CP-10 OSR/TR GP 10
.0SR/GP 11 3
Storage Canister Loading and M.11.5.1.2.B
. Spacing AEM 6,0 STS 1.4,.
CSS 4.3, LVTS 5.3 OSR GP 11 OSR/TR-GP 11 PRC0164.R12 11 DATED: 05 12-92
OPERATIONAL SAFETY REQUIREMENTS / TECHNICAL REQUIREMENTS VEST VALLEY DEMONSTRATION PROJECT INDEX Former VVDP, NFS VVDP
_Idinlifier-1134 Title / Contents Identifiers OSR/GP 12 2
' Fissile Material Limits and H.11.5.1.1.B Requirements for Vaste Packages CPCRIT 9.1=,
9.3, STS 1.4 TRU 9.1, 9.2 LAG 1 LAG 2 H.11.5.1.1.J RER 1.1 H.11.5 4.1.J RER 1.3 H.11.5.6.1.J RER 1.2 OSR GP 12 OSR/TR GP-12 TR CP 13 1
Evacuation Alarm and Emergency New Paging System operability TR GP 13 OSR/TR GP 13 TR GP 14 1
VVDP Heteorological System New Oper=wility TR GP-14 OSR/TR CP-14 TR GP 15' 1
' Fire Brigade and Emergency New Response Team Training TR GP-15 OSR/TR CP 15 TR/GP 16 2
Plant Fire Protection Systems New TR GP 16 OSR/TR GP 16 OSR/GP 17 0
TN BRP and TN REG Shipping Cask New Lid Installation OSR/GP 18 0
Type B Shipping Cask License New Compliance Documentation-TR/GP-19 0
Area Radiation Detector New Requirements During Cask Fuel Loading LO PRG0164.R12 iii PATED: 05 12-92 l
5
~-
e
.e.
.n.,--
,es
OPERATIONAL SAFETY REQUIREMENTS /TECilNICAL REQUIREMENTS VEST VALLEY DEMONSTRATION PROJECT INDEX WVDP Former VVDP, NFS Identifier Egy.
Title / Content 6 Identifiern OSR/IRTS 1 3
Maintenance of Carbon Steel M.11.5.2.6.
High+ Level Vaste Tank Integrity NFS 4.12 M.11.5.4.2.
NTS 6.3 OSR IRTS I OSR/TR IRTS-1 TR/IRTS 2 3
Control of CSS Recipe for M.11.5.2.2.G Decontaminated Supernatant CSS 4.3 TR IRTS 2 OSR/TR IRTS 2 OSR/IRTS 3 3
Maintenance of Spare HUW M.11.5.2,3.
Storagt Capacity NFS 5.4 OSR IRTS 3 OSR/TR IRTS 3 TR/IRTS 4 4
Depressurization of STS for M.11.5.6.1.D Haintenance TR IRTS 4 OSR/TR IRTS 4
.TR/IRTS 5 7
STS Process Limits H.11.5.1.1.D STS 1.4 TR IRTS 5 OSR/TR IRTS 5 TR IR13 6 2
LWTS Manifold Control - CANCELLED New TR IRTS 6 OSR/TR IRTS 6 TR-IRTS 7 5
Sanipling and Analysis New Requirements for Tank SD 15B M.11.5.1.1.H LWTS 5.3 TR IRTS 7 OSR/TR-IPTS 7 TR/IRTS-8 4
Sampling and Analysis New Requirements for Tanks 5 D 15 TR IRTS 8 Al and A2.
OSR/TR IRTS-8 PRC0161 R12 iv DATED: 05-12 92
. ~.
OPERATIONAL SAFETY REQUIREMENTS / TECHNICAL REQUIREMENTS VEST VALLEY DEMONSTR/. TION PROJECT 1NDex p
WDP Former WDP, NFS Identifier-h Title / Content:
Identifiers 05R IRTS.10 1
Criticality Control During New Processing of High Level Vaste Through Ion Exchange Columns Containing Ti Treated Zeolite.
CANCELLED TR IRTS 11 0
Fissile Material Mass Balance New Aeross the LVTS Evaporator TR.IRTS 12 0
Supernatent Treatment Sydtem (STS) New Feed Requirements f~ '
(L l
O PRC0164.R12-V DATED: 05-12 92 l1
West Valley Doc. Number OSR-IRTS-10 Demonstration Project Revi.1.n meer i
Revision Date 05/12/92 Engineering Release #2203 Per ECN #5185 l
TITLE CRITICALITY CONTROL DURING PROCESSING OF HIGH LEVEL WASTE THROUGH ION EXCHANGE COLUMRS CONTAINING TI-TREATED IEOLITE PREPARED BY els 47.
Prowse Date igany Erig eer APPROVED BY I?f D.
C. Meess Date Cognizant System Tesi
\\
j
/
APPROVED BY
^
m -1 R. A. Humphrey Date.,
Radiation & Sal S Mee Chair.
APPROVED BY 1 LUT\\ hlf O D. L. Shugara Date Quality Assu nce P. J. Valenti cute APPROVED BY Fa'cilities Manager b\\@
D. J. Harward Data b 1
l APPROVED BY i
Radla ion & Safety Department Mana'g r i
West Valley Nuclear Services Co., Inc.
P.O. Box 191 RLW4241: R3 DOE Approved DW: 92:0546
(
West Valley, NY 14171-0191 Dated: April 17, 1992 g
WW1816, Rev.1 r
--,a,
-r
,n.
_._.m.m._
.. _. _ _ _.. _ _ _ _. - - ~.,.. _., _. _ _ _. _.. _ _ _. _ _ _ _. _ _ _
i OSR-!RTS-10 t
Rev. 1 RrcoRD OF REVISION l
EttocEDUPE i
2f there are changed to the procedure, the revision number increases by one.
'these changes are indicated in the lef t margin of the body by an arrow (>) at the beginning of the paragraph that contains a change.
Examoles
> The arrow in the snargin indicates change.
f Revision on Egv. No.
Descriotion of chang.9s Paat10 Dated 0
original Issue All 10/11/91 1
CANCEL Per ECN-$185 All 05/12/92 DOE Approved: DW 02:0546 t
f d
I i
/
a
'.- s i
WV-1807, Rev. 1 "t
RLW4241.RJ