ML20096F366

From kanterella
Jump to navigation Jump to search
Revised Operational Safety Requirements (Osr)/Technical Requirements West Valley Demonstration Project Index & Cancelled Rev 1 to OSR-IRTS-10, Criticality Control During Processing of HLW Through Ion Exchange Columns..
ML20096F366
Person / Time
Site: West Valley Demonstration Project
Issue date: 05/12/1992
From: Lindbergh B, Schiffhauer C
WEST VALLEY NUCLEAR SERVICES CO., INC.
To:
References
REF-PROJ-M-32 PROC-920512, NUDOCS 9205210110
Download: ML20096F366 (8)


Text

b ll

,Q y}G l.-

Records Management t-Fmm : Ext 4074, MS 52 Lew #. HF:92:0562

- Date May 12, 1992

. Subject Controlled Dis.ibution of Revisions to the Operational Safety Requirements / Technical Requirements, Volume VI To Distribution ec:

Original, MS-50B Attached are the following revisions to the Operational Safety Requirements / Technical Requirements, Volume VI, which has been assigned to you under controlled distribution:

e Latest Index OSR-IRTS-10, Rev.1

" Criticality Control During Procesung of e

High Level Waste through lon Exchange Columns Containing Ti Treated Zeolite" CANCELLED Destroy or mark superseded the current Index, and ORS-IRTS-10, Rev. O, (3

and place the attached revisions in your controlled manual accordingly.

L)

Copies made from a controlled document are to be marked UNCONTROLLED before distribution.

To acknowledge receipt of these documents, sign, date, and return the attached controlled distribution receipt acknowledgement to the undersigned by May 27,-1992.

For your conv

'ence, a self-addressed, stamped envelope (off-site recipients only) has been provided.

For on-site recipierts, a return address has been placed on the reverse side of the controlled distribution receipt acknowledger.ent; fold and place in the mail.

(

1 A O N _..

CA.

B. E. Lindbehhr-R1li:ords Proce so Records Management West Valley Nuclear Services Co., Inc.

BEL du -

fv t4:

5 Approved:

C. M. Schiffhaunt, Manager

Attachment:

As stated above pU l}>

./

{\\jI PRC0164.R12 I

I 9205210110 920512 DR PROJ l

ri-32 PDR

e OPERATION ^L SAPETY REQUIREMENTS /TECilNICAL REQUIREMENTS VLST VALLEY DEMONSTRATION PROJECT INDEX former WDP, NTS WDP j

Identif*er_

Ram Title / Contents identiflgIs OSR/GP 1 3

WDP Airborne Radioactive M.11.5.2.4 Release Limits WDP 4.1 OSR CP 1 OSR/TR GP 1 OSR/GP 2 2

Radioactivity Content of Liquid M.11.5.2.5.

Ef fluents Released frva WDP WDP 4.2 OSR CP 2 OSR/TR GP 2 OSR/GP 3 4

Building and Vessel Ventilation H.11.5.2.1.

Systems Operability NFS 5.3, STS 1.1, 1.2, CSS 4.1, 4.2, SRF 8.2, LVTS 5.1 M.11.5.2.7.

WDP 4.14 LWTS 5.2, 4'

NFS 6.5, STS 1.2, CSS 4.2 M 11.5.2.8.

TVS 3.0 M.11.5.2.1 VF 2.2, 2.3 OSR GP 3 OSR/TR GP.3 OSP/GP 4 2

Elfluent and Environmental H.11.5.2.1.B.X Monitoring (WDP 5.1)

OSR CP 4 OSR/TR GP 4 O

PRC0164.R12 i

DATED: 05-12 92

. =.

4 OPERATIONAL SAFET'l REQUIREMENTS / TECHNICAL REQUIkEMENTS VEST VALLEY DEMONSTRATICH PROJECT i

INDEX

.f VVDP Former VVDP, NFS Identifier-Etyt Title / Contents Identifiers 4

OSR/GP 5 3

VVDP Emergency Power Requirements M.11.5.4.3.

NFS 6.4 M.11.5.2.1.D STS 1.3 M.11.5.2.1.0 CSS 4.4 OSR GP 5 OSR/TR CP 5 TR/GP 6 2

Storag) Fequirements for M.11.5.2.1.J Low + Level Waste LAG 1 LAG 2 M 11.5.2.1.1 SRF 8.4 TR GP 6 03R/TR GP 6 OSR/GP 7 2

Criticality Safet) for Liquid M.11.5.2.2.

Transfer VVDP 4.3 OSR GP 7 p

OSd/TR CP 7

(, f 71/GP 8 2

Vater Activity Alarms M.11.5.4.1.

NFS 6.9 TR GP 8 OSR/TR GP 8 TR/GP 9 2

Control of Plant Equipment New Function and Canfiguration TR GP 9 OSR/TR GP 9 OSR/GPi10 2

Airborni Effluent Monitoring M.11.5.4.4.

System Operability NFS 6.5 STS 1.1, 1.2 CSS 4.1 OSR CP-10 OSR/TR GP 10

.0SR/GP 11 3

Storage Canister Loading and M.11.5.1.2.B

. Spacing AEM 6,0 STS 1.4,.

CSS 4.3, LVTS 5.3 OSR GP 11 OSR/TR-GP 11 PRC0164.R12 11 DATED: 05 12-92

OPERATIONAL SAFETY REQUIREMENTS / TECHNICAL REQUIREMENTS VEST VALLEY DEMONSTRATION PROJECT INDEX Former VVDP, NFS VVDP

_Idinlifier-1134 Title / Contents Identifiers OSR/GP 12 2

' Fissile Material Limits and H.11.5.1.1.B Requirements for Vaste Packages CPCRIT 9.1=,

9.3, STS 1.4 TRU 9.1, 9.2 LAG 1 LAG 2 H.11.5.1.1.J RER 1.1 H.11.5 4.1.J RER 1.3 H.11.5.6.1.J RER 1.2 OSR GP 12 OSR/TR GP-12 TR CP 13 1

Evacuation Alarm and Emergency New Paging System operability TR GP 13 OSR/TR GP 13 TR GP 14 1

VVDP Heteorological System New Oper=wility TR GP-14 OSR/TR CP-14 TR GP 15' 1

' Fire Brigade and Emergency New Response Team Training TR GP-15 OSR/TR CP 15 TR/GP 16 2

Plant Fire Protection Systems New TR GP 16 OSR/TR GP 16 OSR/GP 17 0

TN BRP and TN REG Shipping Cask New Lid Installation OSR/GP 18 0

Type B Shipping Cask License New Compliance Documentation-TR/GP-19 0

Area Radiation Detector New Requirements During Cask Fuel Loading LO PRG0164.R12 iii PATED: 05 12-92 l

5

~-

e

.e.

.n.,--

,es

OPERATIONAL SAFETY REQUIREMENTS /TECilNICAL REQUIREMENTS VEST VALLEY DEMONSTRATION PROJECT INDEX WVDP Former VVDP, NFS Identifier Egy.

Title / Content 6 Identifiern OSR/IRTS 1 3

Maintenance of Carbon Steel M.11.5.2.6.

High+ Level Vaste Tank Integrity NFS 4.12 M.11.5.4.2.

NTS 6.3 OSR IRTS I OSR/TR IRTS-1 TR/IRTS 2 3

Control of CSS Recipe for M.11.5.2.2.G Decontaminated Supernatant CSS 4.3 TR IRTS 2 OSR/TR IRTS 2 OSR/IRTS 3 3

Maintenance of Spare HUW M.11.5.2,3.

Storagt Capacity NFS 5.4 OSR IRTS 3 OSR/TR IRTS 3 TR/IRTS 4 4

Depressurization of STS for M.11.5.6.1.D Haintenance TR IRTS 4 OSR/TR IRTS 4

.TR/IRTS 5 7

STS Process Limits H.11.5.1.1.D STS 1.4 TR IRTS 5 OSR/TR IRTS 5 TR IR13 6 2

LWTS Manifold Control - CANCELLED New TR IRTS 6 OSR/TR IRTS 6 TR-IRTS 7 5

Sanipling and Analysis New Requirements for Tank SD 15B M.11.5.1.1.H LWTS 5.3 TR IRTS 7 OSR/TR-IPTS 7 TR/IRTS-8 4

Sampling and Analysis New Requirements for Tanks 5 D 15 TR IRTS 8 Al and A2.

OSR/TR IRTS-8 PRC0161 R12 iv DATED: 05-12 92

. ~.

OPERATIONAL SAFETY REQUIREMENTS / TECHNICAL REQUIREMENTS VEST VALLEY DEMONSTR/. TION PROJECT 1NDex p

WDP Former WDP, NFS Identifier-h Title / Content:

Identifiers 05R IRTS.10 1

Criticality Control During New Processing of High Level Vaste Through Ion Exchange Columns Containing Ti Treated Zeolite.

CANCELLED TR IRTS 11 0

Fissile Material Mass Balance New Aeross the LVTS Evaporator TR.IRTS 12 0

Supernatent Treatment Sydtem (STS) New Feed Requirements f~ '

(L l

O PRC0164.R12-V DATED: 05-12 92 l1

West Valley Doc. Number OSR-IRTS-10 Demonstration Project Revi.1.n meer i

Revision Date 05/12/92 Engineering Release #2203 Per ECN #5185 l

TITLE CRITICALITY CONTROL DURING PROCESSING OF HIGH LEVEL WASTE THROUGH ION EXCHANGE COLUMRS CONTAINING TI-TREATED IEOLITE PREPARED BY els 47.

Prowse Date igany Erig eer APPROVED BY I?f D.

C. Meess Date Cognizant System Tesi

\\

j

/

APPROVED BY

^

m -1 R. A. Humphrey Date.,

Radiation & Sal S Mee Chair.

APPROVED BY 1 LUT\\ hlf O D. L. Shugara Date Quality Assu nce P. J. Valenti cute APPROVED BY Fa'cilities Manager b\\@

D. J. Harward Data b 1

l APPROVED BY i

Radla ion & Safety Department Mana'g r i

West Valley Nuclear Services Co., Inc.

P.O. Box 191 RLW4241: R3 DOE Approved DW: 92:0546

(

West Valley, NY 14171-0191 Dated: April 17, 1992 g

WW1816, Rev.1 r

--,a,

-r

,n.

_._.m.m._

.. _. _ _ _.. _ _ _ _. - - ~.,.. _., _. _ _ _. _.. _ _ _. _ _ _ _. _ _ _

i OSR-!RTS-10 t

Rev. 1 RrcoRD OF REVISION l

EttocEDUPE i

2f there are changed to the procedure, the revision number increases by one.

'these changes are indicated in the lef t margin of the body by an arrow (>) at the beginning of the paragraph that contains a change.

Examoles

> The arrow in the snargin indicates change.

f Revision on Egv. No.

Descriotion of chang.9s Paat10 Dated 0

original Issue All 10/11/91 1

CANCEL Per ECN-$185 All 05/12/92 DOE Approved: DW 02:0546 t

f d

I i

/

a

'.- s i

WV-1807, Rev. 1 "t

RLW4241.RJ

.. _.. _,,.,,, _