Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23044A36615 February 2023Calendar Year 2022 Reactor Oversight Process Baseline Inspection Program Completion - Region III
IR 05000250/20200063 March 2021Annual Assessment Letter for Turkey Point Nuclear Plant, Unit 3 and Unit 4 Report 05000250/2020006 and 05000251/2020006Fitness for Duty
Operator Manual Action
Open Phase Condition
Exemption Request
Power-Operated Valves
COVID-19
L-2019-046, Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update25 March 2019Stations - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance UpdateDecommissioning Funding Plan
Authorized possession limits
L-2017-040, Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update30 March 2017Decommissioning Funding Status Reports/Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance UpdateDecommissioning Funding Plan
L-2016-146, Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications26 July 2016Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications
L-2016-068, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated Plan20 June 2016Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of FLEX Final Integrated PlanSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
SBK-L-16011, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)11 February 2016Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
Severe Accident Management Guideline
NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan16 December 2015Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated PlanBoric Acid
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Time Critical Operator Action
Frazil ice
B.5.b Mitigating Strategies
Earthquake
GOTHIC
ML15356A10215 December 2015Final Compliance in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Ultimate heat sink
FLEX
Spent Fuel Pool Instrumentation
L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan10 December 2015Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated PlanBoric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
L-2015-291, Final Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation10 December 2015Final Compliance with EA-12-051 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
NRC 2015-0056, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Safe Shutdown
Boric Acid
Shutdown Margin
Tornado Missile
Internal Flooding
FLEX
Time Critical Operator Action
B.5.b Mitigating Strategies
GOTHIC
SBK-L-15138, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Boric Acid
Mission time
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
L-2015-215, Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)20 August 2015Fifth Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)Boric Acid
Shutdown Margin
Ultimate heat sink
Tornado Missile
Internal Flooding
Operator Manual Action
FLEX
Earthquake
Minimum staff
L-2015-193, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)11 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Internal Flooding
FLEX
L-2015-194, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)11 August 2015Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051)Spent Fuel Pool Instrumentation
SBK-L-15026, NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
SBK-L-15025, NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-127 February 2015NextEra Energy Seabrook, Llc'S Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-0Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
L-2015-017, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)26 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)Boric Acid
High winds
Shutdown Margin
Internal Flooding
FLEX
L-2014-243, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events27 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventsBoric Acid
High winds
Shutdown Margin
Internal Flooding
FLEX
SBK-L-14154, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No EA- 12-05 1)26 August 2014Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No EA- 12-05 1)FLEX
Spent Fuel Pool Instrumentation
ML14076A03313 March 2014NRC Response Letter to Don Tilbury Regarding Remarks at the December 18, 2013 Public Meeting for Seabrook Station (W/Enclosures)Fukushima Dai-Ichi
Earthquake
ML14064A19328 February 2014Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
NRC 2014-0014, Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 February 2014Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
NRC 2014-0013, NextEra Energy Point Beach. Llc'S Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event28 February 2014NextEra Energy Point Beach. Llc'S Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External EventSafe Shutdown
Boric Acid
Shutdown Margin
Tornado Missile
Internal Flooding
FLEX
Time Critical Operator Action
B.5.b Mitigating Strategies
SBK-L-14041, Second Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)27 February 2014Second Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)FLEX
SBK-L-14042, Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2014Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)FLEX
Spent Fuel Pool Instrumentation
L-2014-041, Florida Power and Light Company'S Turkey Point Units 3 & 4, Second Six-Month Status Report in Response to 03/12/2012, Commission Order Modifying Licenses with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Exte26 February 2014Florida Power and Light Company'S Turkey Point Units 3 & 4, Second Six-Month Status Report in Response to 03/12/2012, Commission Order Modifying Licenses with to Requirements for Mitigation Strategies for Beyond-Design-Basis External ExternSafe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Internal Flooding
FLEX
Tornado Generated Missile
Tornado Missile Protection
L-2013-254, First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)28 August 2013First Overall Integrated Plan Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Shutdown Margin
Ultimate heat sink
FLEX
SBK-L-13158, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation28 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool InstrumentationMission time
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
NRC 2013-0077, NextEra Energy Point Beach, Llc'S First Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2013NextEra Energy Point Beach, Llc'S First Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
NRC 2013-0078, NextEra Energy Point Beach, Llc'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Numb28 August 2013NextEra Energy Point Beach, Llc'S First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EABoric Acid
Shutdown Margin
Tornado Missile
FLEX
Time Critical Operator Action
B.5.b Mitigating Strategies
L-2013-253, St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses27 August 2013St. Lucie'S First Six-Month Status Report to the Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify LicensesFLEX
Spent Fuel Pool Instrumentation
L-2013-249, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)21 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA- 12-049)Safe Shutdown
FLEX
L-2013-248, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation(Order Number EA- 12-051)21 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation(Order Number EA- 12-051)Spent Fuel Pool Instrumentation
L-2013-103, Decommissioning Funding Status Reports25 March 2013Decommissioning Funding Status ReportsDecommissioning Funding Plan
ML12145001423 May 2012NFPA 805 LAR Status Matrix - May 2012
ML12024A37628 December 2011State-of-the-Art Reactor Consequence Analyses, Current Status and Next Steps
L-2009-055, Units 1 and 2, Decommissioning Funding Status Reports27 March 2009Units 1 and 2, Decommissioning Funding Status Reports
L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results21 February 2008Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection ResultsWeld Overlay
NRC 2007-0078, Corrective Action Program Commitment Status Update30 August 2007Corrective Action Program Commitment Status Update
ML07093055529 March 2007Decommissioning Fund Status Report
ML06096013127 March 2006Decommissioning Fund Status Report
ML06132020615 February 2006E-mail from D. Croulet of Entergy to Various, Regarding Monitoring Well Status - February 15, 2006-0600
L-HU-05-008, Decommissioning Funding Status Reports31 March 2005Decommissioning Funding Status Reports
SBK-L-05038, Decommissioning Funding Status Report25 March 2005Decommissioning Funding Status Report
ML0506300702 March 2005January Monthly Report on the Status of Open TIAs Assigned to NRR
ML05012026112 January 2005December Monthly Report on the Status of Open TIAs Assigned to NRRBoric Acid
ML04348024229 December 2004November Monthly Report on the Status of Open TIAs Assigned to NRRBoric Acid
L-HU-04-040, Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures24 September 2004Nuclear Management Company, LLC, Implementation Status of Independent Spent Fuel Storage Installation Interim Compensatory Measures