NMP2L2677, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 3 July 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | |
NMP1L3186, Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | 15 December 2017 | Seventh Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable ... | Tornado Missile FLEX Battery sizing Hardened vent |
RS-17-067, Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. | 30 June 2017 | Sixth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under. | Tornado Missile FLEX Hardened vent |
RS-17-045, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | 30 March 2017 | Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations | Decommissioning Funding Plan |
RS-16-046, Annual Property Insurance Status Report | 29 March 2017 | Annual Property Insurance Status Report | |
RS-16-236, Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe. | 14 December 2016 | Fifth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable Operation Under Severe. | Tornado Missile FLEX Fukushima Dai-Ichi Battery sizing Hardened vent |
RS-16-089, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 1 July 2016 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Ultimate heat sink FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
RS-16-111, Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 30 June 2016 | Fourth Six-Month Status Report for Phases 1 & 2 Overall Integrated Plan in Response to 06/06/13 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | Tornado Missile FLEX Fukushima Dai-Ichi Battery sizing Hardened vent |
RS-16-094, Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isl | 25 April 2016 | Property Insurance Status Report for Braidwood Station, Byron Station, Calvert Cliffs, Clinton Power, Dresden Nuclear, LaSalle County, Limerick Generating, Nine Mile Point, Oyster Creek, Peach Bottom, Quad Cities, R.E Ginna, Three Mile Isla | |
RS-16-032, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RS-16-028, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- Basis External Events (Order Number EA-12-049) | Boric Acid High winds Shutdown Margin Mission time Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation Frazil ice |
RS-16-029, Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 February 2016 | Sixth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Ultimate heat sink Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
RS-16-006, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 4 January 2016 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Frazil ice Battery sizing Earthquake Fire Protection Program GOTHIC Seismic Walkdown Report |
RS-15-296, Submits Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 15 December 2015 | Submits Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RS-15-206, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RS-15-218, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Frazil ice Battery sizing Earthquake |
RS-15-207, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
RS-15-219, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 August 2015 | Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | High winds Ultimate heat sink Emergency Lighting Functionality Assessment FLEX Spent Fuel Pool Instrumentation Earthquake |
RS-15-153, Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | 30 June 2015 | Second Six-Month Status Report for Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe.. | Tornado Missile FLEX Hardened vent |
RS-15-061, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | 20 February 2015 | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) | Boric Acid Shutdown Margin Ultimate heat sink Tornado Missile Emergency Lighting FLEX Spent Fuel Pool Instrumentation Frazil ice |
RS-15-062, R. E. Ginna - February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) | 20 February 2015 | R. E. Ginna - February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (EA-12-051) | Spent Fuel Pool Instrumentation |
RS-15-055, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | 20 February 2015 | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) | Spent Fuel Pool Instrumentation |
RS-15-054, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 20 February 2015 | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid Shutdown Margin Safe Shutdown Earthquake FLEX Tornado Generated Missile Frazil ice |
RS-15-057, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 19 February 2015 | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown Ultimate heat sink Emergency Lighting FLEX Fukushima Dai-Ichi Containment Hardened Vent |
RS-15-058, February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 19 February 2015 | February 2015 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Operating Basis Earthquake FLEX Spent Fuel Pool Instrumentation |
L-14-035, December 2014 Six-Month Status Report in Response to Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 16 December 2014 | December 2014 Six-Month Status Report in Response to Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | FLEX Hardened vent |
L-14-029, August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 26 August 2014 | August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid Shutdown Margin Ultimate heat sink Tornado Missile Emergency Lighting FLEX Frazil ice |
L-14-030, August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 26 August 2014 | August 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Mission time Safe Shutdown Earthquake Operating Basis Earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake |
ML14069A318 | 27 February 2014 | February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Frazil ice Earthquake |
ML14069A180 | 24 February 2014 | February 2014 Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Safe Shutdown Earthquake Operating Basis Earthquake Spent Fuel Pool Instrumentation |
ML13098A084 | 27 March 2013 | Decommissioning Funding Status Report | Decommissioning Funding Plan |
ML121450014 | 23 May 2012 | NFPA 805 LAR Status Matrix - May 2012 | |
ML12024A376 | 28 December 2011 | State-of-the-Art Reactor Consequence Analyses, Current Status and Next Steps | |
ML092310145 | 13 August 2009 | Report on the Status of New York State Pollutant Discharge Elimination System Permit - Renewal | |
ML090850400 | 26 March 2009 | Units, 1 & 2, Nine Mile Point, Units, 1 & 2, and R.E. Ginna, 2009 Decommissioning Funding Status Report: Year End 2008 | |
ML072320382 | 23 August 2007 | Status of the Acceptance Review Part One of the Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3 | Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Exemption Request Earthquake |
ML071410078 | 17 May 2007 | Post-Accident Monitoring Report | Reactor Vessel Water Level |
ML071080262 | 30 March 2007 | Biennial Report: Status of Decommissioning Funding Per 10 CFR 50.75(f)(1) | |
ML050940024 | 29 March 2005 | Plants 2005 Report on Status of Decommissioning Funding | |
ML041890435 | 18 April 2004 | Event # 40684, Nine Mile Point Re Residual Heat Removal System Isolation Due to a Rise in Reactor Pressure | |
ML032390717 | 20 August 2003 | Report on Status of New York State Pollutant Discharge Elimination System | Grab sample Zebra Mussel |
ML022820464 | 27 September 2002 | Status of Nine Mile Point Nuclear Station State Pollutant Discharge Elimination System Permit | Grab sample Zebra Mussel Incorporated by reference |
ML022600292 | 17 September 2002 | Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR | |
ML022400798 | 1 February 2002 | E-mail from Beth Wetzel Bulletin 2001-01 Status Report | |
ML022400781 | 18 January 2002 | E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report | |
ML17037B956 | 29 June 1976 | Letter Concerning Recent Events and Conclusions Concerning a Generic Review of Anticipated Transients with Scram and Requesting Additional Analyses and Identification of Design Changes by December 30, 1976 | |