ML20217G21615 October 1999Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for AmendFuel cladding
ML20207G2267 June 1999SER Accepting Proposed Mod to Each of Four Core Shroud Stabilizers for Implementation During Current 1999 Refueling Outage at Plant,Unit 1
ML20206U53517 May 1999SER Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant, Units 1 & 2Backfit
ML20155E2002 November 1998Safety Evaluation Approving NMP 980227 Request for Extension of Reinspection Interval for Core Shroud Vertical Welds at NMP1 from 10,600 Hours to 14,500 Hours of Hot Operation
ML20154D8405 October 1998Safety Evaluation Accepting Proposed Changes Related to PT Limits in Plant,Unit 1 TSsHydrostatic
ML20217F43419 March 1998SER Related to Proposed Restructuring New York State Electric & Gas Corp,Nine Mile Point Nuclear Station,Unit 2
ML20198H99429 December 1997SE Supporting Approval of Application Re Long Island Power Authority Aquisition of Long Island Lighting Co,Subject to Discussed Condition
ML20197C4773 January 1997Safety Evaluation Supporting Nine Mile Point Unit 1 Reactor & Turbine Building Blowout Panels
ML20197C4542 January 1997Safety Evaluation Supporting Resolution of Nine Mile Point Reactor/Turbine Building Pressure Relief Panel Outside Design Basis IssueFinite Element Analysis
ML20056H47527 August 1993Safety Evaluation Accepting Licensee Proposal for Continued Insp & Repair of Flaw in Weld Joining HPCS Nozzle Safe to safe-end ExtensionWeld Overlay
Nondestructive Examination
ML20205R13131 October 1988Safety Evaluation Supporting Amend 101 to License DPR-63Exemption Request
ML20153F3854 May 1987SER Accepting Util 870301 & 0407 Requests for Rev to Tech Specs,Modifying MSIV Actuation Control Sys,Per IEEE Std 279 & GDC 21
ML20153F36730 April 1987Safety Evaluation Accepting Util 870311 Proposed Changes to Tech Spec Tables 2.2.1-1,3.6.1.2-1 & 3.6.3-1 Re MSIV-closure Setpoint
ML20238C7128 April 1987Safety Evaluation Concluding That Facility May Resume Operation W/O Leakage Control Sys But w/post-accident Leakage Mgt
ML20153F3517 February 1987Safety Evaluation Accepting Util Latest Design Mods to MSIV Actuation Control Sys,Per IEEE 279 & GDC 21
ML20238C6505 February 1987Safety Evaluation Accepting MSIVs for Facility Operation Up to First Refueling,Contingent on Successful Completion of Preoperational Tests & Prototype Testing Program.Briefing for Commissioner Asselstine Re MSIVs & SALP Input Also EnclHigh Radiation Area
Stroke time
Weld Overlay
Finite Element Analysis
Liquid penetrant
ML20238C5802 February 1987Safety Evaluation Concluding That Facility May Resume Startup Testing & Operation for First Operating Cycle W/ Installed Refurbished Msivs.Necessity of Addl Leak Testing to Be Determined After Review of Prototype Test ResultsCoatings
ML20238C13327 October 1986Safety Evaluation Accepting Refurbished MSIVs for Plant Use Up to First Refueling,Contingent on Prototype Test Performance.Conditions StatedWeld Overlay
Liquid penetrant
ML20238C11622 October 1986Safety Evaluation Supporting Schedular Exemption from GDC 54 & 55 Re MSIV Operability to Permit Fuel Load.Salp Input Also EnclSystematic Assessment of Licensee Performance
Exemption Request
ML20153F62927 August 1986Safety Evaluation Concurring W/Applicant 860703 Exemption Request Re Testing of 16 Relief Valves,Per 10CFR50,App JHydrostatic
Exemption Request
ML20197C05127 October 1978Safety Evaluation Rept Supporting Amend 1 to CPPR-112
ML20244E27015 November 1974Suppl 1 to AEC SER Re Licensee Conversion from Provisional OL to full-term OL for UtilBackfit