Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23338A257 | 14 December 2023 | Kairos Power LLC - Summary Record of Decision | Environmental Justice |
ML23209A659 | 23 August 2023 | Hermes Draft Construction Permit | |
ML23192A766 | 22 August 2023 | Draft Summary Rod for Kairos Hermes Test Reactor CP | Environmental Justice |
ML23055A676 | 28 February 2023 | KP-TR-018-NP, Revision 2, Postulated Event Analysis Methodology | Safe Shutdown Shutdown Margin Mission time Anticipated operational occurrence Coatings Earthquake Coast down Tristructural Isotropic |
ML22286A242 | 13 October 2022 | Kairos Power, LLC - Postulated Event Analysis Methodology | Mission time |
ML22244A248 | 30 September 2022 | Kairos Power LLC, Changes to Postulated Event Analysis Methodology Technical Report (KP-TR-018) | Safe Shutdown Shutdown Margin Coast down |
ML22272A599 | 29 September 2022 | Enclosure 5: KP-TR-018-NP, Rev. 1, Postulated Event Analysis Methodology | Safe Shutdown Shutdown Margin Mission time Anticipated operational occurrence Coatings Earthquake Coast down Tristructural Isotropic |
ML22272A598 | 29 September 2022 | Enclosure 4: KP-TR-017-NP, Rev. 1, KP-FHR Core Design and Analysis Methodology | Safe Shutdown Shutdown Margin Anticipated operational occurrence Coatings Power change Tristructural Isotropic |
ML22243A139 | 30 August 2022 | Enclosure 2: Changes to Non-Proprietary Portions of KP-TR-017-P, Revision 0 (Non-Proprietary) | Safe Shutdown Shutdown Margin |
ML22224A201 | 12 August 2022 | Enclosure 1: Changes to Postulated Event Analysis Methodology Technical Report (KP-TR-018) | Mission time Tristructural Isotropic |
ML22193A240 | 1 August 2022 | Issuance of Environmental Scoping Summary Report for the Review of the Kairos Hermes Test Reactor Construction Permit Application | |
ML22170A000 | 21 June 2022 | Excerpt from Title 18 of the City of Oak Ridge Municipal Code: Reference for the Kairos Hermes Construction Permit Application | Grab sample Accidental discharge |
ML22130A738 | 8 February 2022 | DOE-EM Weekly Bulletin Regarding New Perspective on K-25 with Viewing Platform: Reference for Kairos Hermes CP Application | |
ML22049B559 | 30 September 2021 | Kairos Power, LLC, Postulated Event Analysis Methodology, Chapter 3, Capability of Evaluation Models | Safe Shutdown Mission time Earthquake |
ML22106A003 | 31 July 2021 | Addendum 2 to the Supplemental Sampling and Analysis Plan for the Ettp: Reference for the Kairos Hermes CP Application | |
ML22107A000 | 18 February 2021 | City of Oak Ridge Capital Improvement Program for 2022-2027: Reference for Kairos Hermes CP Application | Coronavirus |
ML22170A001 | 30 November 2020 | Capacity Report on Low Level Waste to the Texas Commission on Environmental Quality | |
ML22157A452 | 19 November 2020 | City of Oak Ridge Zoning Ordinance: Reference for Kairos Hermes CP Application | Hydrostatic Open House |
ML22071A002 | 30 September 2015 | DOE-OR-01-2666 K-33 Title Transfer Document (EIS Reference for Kairos Hermes CP Application) | Incorporated by reference |
ML22071A003 | 12 September 2015 | DOE-OR-01-2676 K-31 Title Transfer Document (EIS Reference for Kairos Hermes CP Application) | Incorporated by reference |
ML22118A305 | 31 October 2010 | National Park Service: Federal Land Manager'S Air Quality Related Values Work Group (Flag): Reference for the Kairos CP Application |