Category:Report
MONTHYEARML23338A2572023-12-14014 December 2023 Kairos Power LLC - Summary Record of Decision ML23209A6592023-08-23023 August 2023 Hermes Draft Construction Permit ML23192A7662023-08-22022 August 2023 Draft Summary Rod for Kairos Hermes Test Reactor CP ML23055A6762023-02-28028 February 2023 KP-TR-018-NP, Revision 2, Postulated Event Analysis Methodology ML22286A2422022-10-13013 October 2022 Kairos Power, LLC - Postulated Event Analysis Methodology ML22244A2482022-09-30030 September 2022 Kairos Power LLC, Changes to Postulated Event Analysis Methodology Technical Report (KP-TR-018) ML22272A5992022-09-29029 September 2022 Enclosure 5: KP-TR-018-NP, Rev. 1, Postulated Event Analysis Methodology ML22272A5982022-09-29029 September 2022 Enclosure 4: KP-TR-017-NP, Rev. 1, KP-FHR Core Design and Analysis Methodology ML22243A1392022-08-30030 August 2022 Enclosure 2: Changes to Non-Proprietary Portions of KP-TR-017-P, Revision 0 (Non-Proprietary) ML22224A2012022-08-12012 August 2022 Enclosure 1: Changes to Postulated Event Analysis Methodology Technical Report (KP-TR-018) ML22193A2402022-08-0101 August 2022 Issuance of Environmental Scoping Summary Report for the Review of the Kairos Hermes Test Reactor Construction Permit Application ML22170A0002022-06-21021 June 2022 Excerpt from Title 18 of the City of Oak Ridge Municipal Code: Reference for the Kairos Hermes Construction Permit Application ML22130A7382022-02-0808 February 2022 DOE-EM Weekly Bulletin Regarding New Perspective on K-25 with Viewing Platform: Reference for Kairos Hermes CP Application ML22049B5592021-09-30030 September 2021 Kairos Power, LLC, Postulated Event Analysis Methodology, Chapter 3, Capability of Evaluation Models ML22106A0032021-07-31031 July 2021 Addendum 2 to the Supplemental Sampling and Analysis Plan for the Ettp: Reference for the Kairos Hermes CP Application ML22107A0002021-02-18018 February 2021 City of Oak Ridge Capital Improvement Program for 2022-2027: Reference for Kairos Hermes CP Application ML22170A0012020-11-30030 November 2020 Capacity Report on Low Level Waste to the Texas Commission on Environmental Quality ML22157A4522020-11-19019 November 2020 City of Oak Ridge Zoning Ordinance: Reference for Kairos Hermes CP Application ML22071A0022015-09-30030 September 2015 DOE-OR-01-2666 K-33 Title Transfer Document (EIS Reference for Kairos Hermes CP Application) ML22071A0032015-09-12012 September 2015 DOE-OR-01-2676 K-31 Title Transfer Document (EIS Reference for Kairos Hermes CP Application) ML22118A3052010-10-31031 October 2010 National Park Service: Federal Land Manager'S Air Quality Related Values Work Group (Flag): Reference for the Kairos CP Application 2023-08-23
[Table view] Category:Miscellaneous
MONTHYEARML23338A2572023-12-14014 December 2023 Kairos Power LLC - Summary Record of Decision ML23209A6592023-08-23023 August 2023 Hermes Draft Construction Permit ML22193A2402022-08-0101 August 2022 Issuance of Environmental Scoping Summary Report for the Review of the Kairos Hermes Test Reactor Construction Permit Application ML22107A0002021-02-18018 February 2021 City of Oak Ridge Capital Improvement Program for 2022-2027: Reference for Kairos Hermes CP Application 2023-08-23
[Table view] Category:Memoranda
MONTHYEARML24008A0802024-01-0808 January 2024 Kairos Power LLC, Summary of 11/2/2023, Public Meeting to Discuss Material Control and Accounting ML23318A5162023-11-30030 November 2023 Implementation of Provisions from Consultations Under Section 106 of the National Historic Preservation Act on the Kairos Hermes Test Reactor CP Review ML23220A1992023-09-0707 September 2023 Consideration of New Information Regarding Potential Cumulative Impacts from the Proposed Kairos Hermes 2 Test Reactor on the Kairos Hermes Construction Permit Review ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report ML23156A6682023-06-0606 June 2023 Summary of February 9, 2022, Public Meeting on the Kairos Herme Preliminary Safety Analysis Report ML23117A0052023-05-0101 May 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 3, Design of Structures, Systems and Components ML23117A0502023-04-29029 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 12, Conduct of Operations ML23117A0272023-04-28028 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 10, Experimental Facilities and Utilization ML23117A0112023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 6, Engineered Safety Features ML23117A0172023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 8, Electric Power Systems ML23117A0022023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 1, the Facility ML23117A0082023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 4, Reactor Description ML23117A0032023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 2, Site Characteristics ML23117A0102023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 5, Heat Transport Systems ML23117A0192023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 9, Auxiliary Systems ML23117A0302023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 11, Radiation Protection and Waste Management ML23117A0522023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 13, Accident Analysis ML23117A0612023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 14, Technical Specifications ML23117A0652023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 16, Other License Considerations ML23117A0692023-04-27027 April 2023 Kairos Non-Power Reactor Hermes Construction Permit Application - Safety Evaluation for Chapter 17, Decommissioning and Possession-Only License Amendments ML23031A1602023-03-21021 March 2023 Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application ML22196A3882022-08-24024 August 2022 Memorandum from T.Dozier to K.Erwin - Summary Report for Environmental Audit of the Kairos Hermes Test Reactor Construction Permit Application ML22193A2402022-08-0101 August 2022 Issuance of Environmental Scoping Summary Report for the Review of the Kairos Hermes Test Reactor Construction Permit Application ML22169A0092022-04-12012 April 2022 NPS Scoping Comments on Kairos Test Reactor 2024-01-08
[Table view] |
Text
August 1, 2022 MEMORANDUM TO: Kenneth Erwin, Chief Environmental Review New Reactors Branch Division of Rulemaking, Environmental and Financial Support Office of Nuclear Material Safety and Safeguards Signed by Dozier, Tamsen FROM: Tamsen Dozier, Project Manager on 08/01/22 Environmental Review New Reactors Branch Division of Rulemaking, Environmental and Financial Support Office of Nuclear Material Safety and Safeguards
SUBJECT:
ISSUANCE OF ENVIRONMENTAL SCOPING
SUMMARY
REPORT ASSOCIATED WITH THE U.S. NUCLEAR REGULATORY COMMISSION STAFFS REVIEW OF THE KAIROS HERMES TEST REACTOR CONSTRUCTION PERMIT APPLICATION (EPID NO. L-2021-NEW-12)
Pursuant to section 51.29 of title 10 of the Code of Federal Regulations (10 CFR), the U.S.
Nuclear Regulatory Commission (NRC) staff conducted the environmental scoping process and solicited public comments from February 18, 2022, to April 19, 2022 (87 FR 9394). This process informed the scope of the staffs environmental review of the application for a construction permit submitted by Kairos for a test reactor termed Hermes. The scoping process is an important step in the development of the draft EIS.
As part of the scoping process, the staff held a public environmental scoping meeting via webinar on March 23, 2021, to solicit public input regarding the scope of the environmental review. A summary of the scoping meeting is publicly available in the NRCs Agencywide Document Access and Management System (ADAMS) at https://www.nrc.gov/reading-rm/adams.html ML22110A018. To begin the search, select Begin Web-based ADAMS Search.
For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov.
CONTACTS: Tamsen Dozier, NMSS/REFS Peyton Doub, NMSS/REFS 301-415-2272 301-415-6703
K. Erwin 2 At the conclusion of the scoping process, the staff prepared the enclosed environmental scoping summary report identifying comments received during the scoping period. In accordance with 10 CFR 51.29(b), the staff will send a copy of the scoping summary report to each participant in the scoping process (who provided mailing information). The next step in the environmental review process is the issuance of the draft EIS. Notice of the availability of the draft EIS and the procedures for providing comments will be published in the Federal Register. The current schedule for the issuance of the draft EIS may be found on the project website at https://www.nrc.gov/reactors/non-power/hermes-kairos.html.
Docket No. 50-7513
Enclosure:
As stated cc: Listserv
Package: ML22194A014 Memorandum: ML22193A240 Report: ML22178A051 OFFICE PM:REFS LA:REFS OGC (NLO)
NAME TDozier AWalker-Smith RHarper DATE 07/13/22 07/14/22 07/20/22 OFFICE BC:REFS PM:REFS NAME KErwin (PDoub for) TDozier DATE 08/01/22 08/01/22