Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20248C088 | 8 September 1989 | Forwards Ref Matls to Accompany NUREG-0683,final Suppl 3 | Safe Shutdown Ultimate heat sink Grab sample Fire Barrier Coatings Emergency Lighting Fire Protection Program Fire Watch Early Warning Fire Detection Scaffolding Weak link |
ML20134D755 | 9 May 1985 | Forwards Water Data Used to Prepare Document, Analysis of Possible Options for Reducing Occupational Dose from TMI-2 Basement | |
ML20126G081 | 5 March 1985 | FOIA Request for TMI Emergency Evacuation Plan | |
ML20086A104 | 28 September 1983 | Forwards TMI-1 Steam Generator Elastic Fracture Mechanics & Load Characterization, Technical Evaluation Rept | |
ML20084E011 | 8 April 1983 | Forwards TMI-1 Steam Generator Degradation & Repair, Final Technical Evaluation Rept | |
ML20070V207 | 7 January 1983 | Forwards Request for Refs Listed in Topical Rept 008, Rev 1,per NRC .Refs Necessary for Preparation of Technical Evaluation Rept | |
ML20078B544 | 18 November 1982 | Forwards Minutes of 821018-19 Meetings W/Util in Bethesda,Md Re Steam Generator Repair Process Update & Return to Svc Overview | Flow Induced Vibration |
ML20054J217 | 11 May 1982 | FOIA Request for Documents & Records Re DOE Decision to Accept Entire TMI-2 Nuclear Reactor Core & NRC Decision to Enter Into Memorandum of Understanding W/Doe | |
ML20093C043 | 19 February 1982 | Notifies That Upon Implementation of Mods to Control Bldg Ventilation Sys Program Will Meet Criteria Identified in NUREG-0737 Item III.D.3.4, Control Room Habitability. Mods Include Addition of Redundant Low Leakage Dampers | |
ML19350B079 | 2 March 1981 | Urges on Behalf of Whitmoyer Labs,Inc Restart of TMI-1 W/O Bypassing Safe Operating Procedures.Cost of Electric Power Should Be Lower | |
ML20002B352 | 4 December 1980 | Requests Action to Expedite Restart as Facility Was Not Involved in TMI-2 Accident | |
ML20049A343 | 1 December 1980 | Urges Restart of TMI-1 | |
ML20003C889 | 5 August 1980 | Reviews EPRI Evaluation Re Potential Conservatisms & Ranges of Uncertainity in WASH-1400 Analysis of Iodine Release for Tmlb Sequence.More Research Required.Prof Qualifications & Certificate of Svc Encl | |
ML19323F213 | 7 May 1980 | Forwards App C of Responses to Interrogatories.Consists of Telephone Survey Forms for Evaluation of Effect of Incident on Local Residents | |
ML19290F001 | 19 November 1979 | Forwards Fire Protection Design Review.Discusses Fire Detectors,Automatic Sprinkler Sys,Fire Barrier Penetrations, Thermal Insulation of Valves,Emergency Feedwater Pump Penetration,Cable Separation & Relay Room Protection | Safe Shutdown Fire Barrier Coatings Design basis earthquake |
ML19250C341 | 19 November 1979 | Forwards Input to TMI-1 Design Review & Supplemental Items | |
ML19210D045 | 13 November 1979 | Forwards Comments on Item 3.1.0 of Fire Protection Safety Evaluation.Will Require Licensee to Quantify Pressure Differential Between Areas Where Proposed Penetration Seals Will Be Installed | Fire Barrier |
ML20062H293 | 24 April 1979 | Forwards Requested Summary of Telcon | |
ML19210A361 | 11 September 1978 | Lists J Riopelle Major Concerns Re 780817 TMI-1 Draft Safety Evaluation:Establish Program to Hydrotest All Fire Hoses at 220 Psi,Inspect Fire Hydrants for Drainage Prior to Freezing Weather & Provide 1-1.5 Hose Capability | |
ML19210A357 | 1 September 1978 | Recommends That Electrical Supervision Be Required on All Control Valves in Fire Protection Systems Protection Areas Containing or Exposing safety-related Equipment | Safe Shutdown |
ML20147B021 | 1 September 1978 | Advises That Review of Fire Protection for Facility Noted Areas of Plant Where Fire Could Affect Safe Shutdown & Release of Radioactivity.Presents Different Points of View on Value of Supervision by Util | Safe Shutdown |