Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18065A616 | 31 March 1996 | Nonproprietary Consumers Power Co Reactor Vessel Neutron Fluence Measurement Program for Palisades Nuclear Plant - Cycles 1 Through 11. | |
ML18065A610 | 29 February 1996 | Non-proprietary Consumers Power Co Palisades Surveillance Specimen Annealing Recovery Program. | |
ML17311B344 | 30 September 1995 | Safety Analysis Rept for Use of Advanced Zr Based Cladding Matl in PVNGS Unit 2 Batch J Demonstration Fuel Assemblies. | Fuel cladding |
ML18064A698 | 31 March 1995 | Nonproprietary Rev 1 to Palisades Loss of Load Analysis. | |
ML18065A310 | 31 October 1994 | Non-proprietary Status Rept on CEOG Activities Concerning Primary Water Stress Corrosion Cracking of Inconel-600 Penetrations. | Boric Acid Non-Destructive Examination |
ML18064A590 | 19 October 1994 | Non-Proprietary Palisades Loss of Load Analysis. | |
ML17310B247 | 28 February 1994 | Nonproprietary Analysis of 137 Degree Capsule from APS Palo Verde Unit 2 Reactor Vessel Radiation Surveillance Program. | |
ML18058B874 | 31 May 1993 | Reactor Vessel Neutron Fluence Measurement Program for Cpc,Results to End of Cycle 9. | |
ML20128E074 | 31 July 1992 | Nonproprietary Pvngs,Unit 1 EOC 3 Exam Rept | |
ML17305B514 | 30 April 1991 | Suppl 2 to, Annual Rept on C-E ECCS Codes & Methods for 10CFR50.46. | Boric Acid Fuel cladding |
ML18057A966 | 9 November 1990 | Review & Analysis of SRP Chapter 15 Events for Palisades W/ 15% Variable High Power Trip Reset. | Shutdown Margin Anticipated operational occurrence Rod Drop Event Coast down |
ML18057A498 | 30 September 1990 | Preliminary ANF-90-078, Palisades Cycle 9 - Analysis of SRP Chapter 15 Events. | |
ML18057A497 | 31 August 1990 | Rev 2 to Disposition of SRP Chapter 15 Events for Palisades Cycle 9. | |
ML17305A605 | 28 February 1990 | Annual Rept on C-E ECCS Codes & Methods for 10CFR50.46, Suppl 1 | Fuel cladding |
ML20197H623 | 28 February 1990 | Rev 1 to Palisades Large Break Loca/Eccs Analysis W/ Increased Radial Peaking | Earthquake Fuel cladding |
ML19327C195 | 31 October 1989 | Nonproprietary Palo Verde Nuclear Generating Station-Unit 1 End-of-Cycle 2 Fuel Exam Rept. | |
ML17223A697 | 30 April 1989 | Annual Rept on C-E ECCS Codes & Methods for 10CFR50.46. | Fuel cladding |
ML20154J434 | 7 September 1988 | Rev 1 to Palisades Cycle 8:Disposition & Analysis of SRP Chapter 15 Events | Shutdown Margin Anticipated operational occurrence Rod Drop Event Coast down |
ML20195H030 | 13 June 1988 | Nonproprietary Low Flow Trip Setpoint & Thermal Margin Analysis for Three Primary Coolant Pump Operation of Palisades Reactor | Coast down |
ML20195H074 | 13 June 1988 | Nonproprietary Vol 1 of Palisades Modified Reactor Protection Sys Rept-Disposition of SRP Chapter 15 Events | Shutdown Margin Anticipated operational occurrence |
ML20195H327 | 13 June 1988 | Nonproprietary Vol 2 of Palisades Modified Reactor Protection Sys Rept:Analysis of Chapter 15 Events | Shutdown Margin Anticipated operational occurrence |
ML20155G710 | 31 May 1988 | End-Of-Cycle 1 Surveillance Fuel Exam Rept | |
ML20150E666 | 29 February 1988 | Charging Pump Gas Binding & Cracked Block Evaluation Rept | Boric Acid Finite Element Analysis |
ML20235M221 | 13 July 1987 | Nonproprietary Rev 01-NP to Modified Statistical Combination of Uncertainties | |
ML20236B621 | 30 June 1987 | Structural & Seismic Evaluation of Palo Verde Charging Pump Block | |
ML20206J826 | 7 April 1987 | Rev 1 to Thermal Analysis of West Engineered Safeguards Room of Palisades Nuclear Power Plant | |
ML18059A456 | 31 May 1986 | Status & Suggested Course of Action for Nondenting-Related Primary-Side IGSCC of Westinghouse-Type Sg. | Boric Acid Nondestructive Examination Finite Element Analysis |
ML20155J523 | 31 May 1986 | Rev 1 to Functional Design Requirement for Core Protection Calculator | Anticipated operational occurrence |
ML20155J505 | 31 May 1986 | Rev 1 to Functional Design Requirements for Control Element Assembly Calculator | Anticipated operational occurrence |
ML20155J491 | 31 May 1986 | Rev 0 to Core Protection Calculator/Control Element Assembly Calculator Software Mods for CPC Improvement Program Reload Data Block | Anticipated operational occurrence |
ML20151Z064 | 31 January 1986 | Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines | |
ML20151Z052 | 31 January 1986 | Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure | |
ML20210E487 | 31 December 1985 | Comprehensive Vibration Assessment Program for Palo Verde Generating Station Unit 2 (Sys 80 Nonprototype-Category 1), Evaluation of Pre-Core Hot Functional Insp Program, Preliminary Rept | |
ML20134N302 | 31 July 1985 | Rev 00 to Functional Design Requirement for Core Protection Calculator | Anticipated operational occurrence |
ML20134N294 | 31 July 1985 | Rev 00 to Functional Design Requirement for Control Element Assembly Calculator | Anticipated operational occurrence |
ML20111C133 | 28 February 1985 | Nonproprietary Rev 1-NP to, Response to NRC Questions on Core Protection Calculator Software,Palo Verde Nuclear Generating Station,Unit 1 | |
ML20111C117 | 31 January 1985 | Rev 1 to Comprehensive Vibration Assessment Program for Palo Verde Nuclear Generating Station Unit 1 (Sys 80 Prototype),Evaluation of Predictions & Pre-Core Hot Functional Measurement & Insp Programs | Flow Induced Vibration |
ML17298B539 | 30 November 1984 | Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for Cessar Sys 80. | Hydrostatic |
ML17298B540 | 30 November 1984 | Summary Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3. | |
ML20099D451 | 30 September 1984 | Analysis of Capsules T-330 & W-290 from CPC Palisades Reactor Vessel Radiation Surveillance Program | |
ML20100J226 | 30 September 1984 | Rev 2 to Core Protection Calculation/Control Element Assembly Calculator Sys Phase I Software Verification Test Rept | |
ML20100J254 | 30 September 1984 | Rev 2 to Core Protection Calculation/Control Element Assembly Calculator Sys Phase II Software Verification Test Rept | |
ML20100J282 | 30 September 1984 | Rev 1 to Palo Verde Nuclear Generating Station Cycle 1 Core Protection Sys & Control Element Assembly Calculator Data Base Listing | |
ML20237J313 | 31 August 1984 | Rev 1 to Final Rept on Palo Verde Nuclear Generating Station Reactor Coolant Pumps | Hydrostatic Nondestructive Examination Liquid penetrant Coast down |
ML17298B499 | 31 August 1984 | Errata to CEN-267(V)-NP & Rev 1-NP, Final Rept on Performance Evaluation of Palo Verde Control Element Assembly Shroud. | |
ML20238E734 | 31 August 1984 | Nonproprietary Rept on Palo Verde Nuclear Generating Station LPSI Pumps Failure to Start. Related Documentation Encl | |
ML20094F632 | 31 July 1984 | Rev 0 to Calculation of Trip Setpoint Values,Plant Protection Sys | Backfit |
ML20084F027 | 20 April 1984 | Suppl 1 to Analysis of Axial Power Distribution Limits for Palisades Nuclear Reactor at 2530 Mwt:Sensitivity Studies | |
ML20087J831 | 9 March 1984 | LOCA-ECCS Analysis for 2125 Mwt Operation & 50% Steam Generator Tube Plugging | |
ML20087J819 | 9 March 1984 | Plant Transient Analysis for Palisades Nuclear Power Plant W/50% Steam Generator Plugging | Anticipated operational occurrence Coast down |