Text
.
REQUEST FOR ADDITIONAL INFORMATION QUIPMENT E?NIRO?HE?TIAL QUALIFICATION (EM)
REVIEW OF LICENSEES' RESOLUTION OF OUTSTANDING ISSUES FROM NRC EQUIPMENT ENVIRONMENTAL QUALIFICATION SAFETY EVALUATION REPORTS (SER) AND TMI, ACTION PLAN INSTALLED Q UIPME!?f The Toledo Edison Company Davis-Besse Unit 1 NRC Docket No. 50-346 December 22, 1981 NRC TAC No. 42508 1
?
l Please send a copy of cover letter to NRC Project flanager and complete package to FRC.
FRC mailing address is as follows:
Mr. Cyril J,. Crane Franklin Research Center The Parkway at Twentieth Street l
Philadelphia, PA 19103 Telephone No. 215/448-1353 Te?.ecopy No. 215/448-1296 s Telecepy Confirmation No. 215/443-1215 l
I I
l l
i l
. Franidin Research Center l
A Division of The Franklin Institute The Sen,stran Franen Parkmey, PMe., Pa.191C3 (21S) 448 1000 8202110373 820128 PDR ADOCK 05000346 P
l
.(
BACKGROUND f
Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-l tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment
{
environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues l
from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for each plant.
This request for additional inforn.ation (RFI) is the result of an evaluation of the information provided by letters dated October 12, 1981 [1]
and January 30, 1981 [2].*
FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER Information Requested 1.
In referance to the Licensee's 90-day response [1] to the NRC SER [3], a legible single copy of each of the following qualification documents is requested in order that the FRC evaluation may proceed:
- a. Wyle Laboratories Report No. 44354-1
" Qualification Test Report for Four (4)
NEMA 4 Enclosures," March 8, 1979 (for States, Raychem).
- b. Rosemount Test Report No. 87414, "Investication Radiation Requirement, Model 177 HW," 8/16/74
- Numbers in brackets refer to citations found in the list of references.
nklin Research Center A Dnemen ed The Fransen bummme
I
- c. Foxboro Company Test Report No. T2-1075,
" Radiation Test of E10 Series Differential Pressure Transmitter of the Standard Construction Type," August,1973.
- d. Rosemount Test Report No. 12756B Rev. A, "Rosemount Modified Model 1152 Pressure Transmitter Environmental Class lA Equipment," 12/5/75.
- e. NAMCO Qualification Report, " Estimation 1
of Qualified Life of EA740-20000 Rev. C, D, or E, Revised 2/27/80.
- f. Microswitch Engineering Report No.
~
LTR-24407, " Preliminary Evaluation of
'LS,'
'HS,'
' CMC,'
'PT, ' and ' Series 2 '
Type Switches Under Electrical Aging, Environmental Aging, and Seismic Vibration Tests."
- g. ITT Barton Report No. R3-288A-1, "IEEE 344-1975 Seismic and Radiation Qualification Tests for ITT Barton Differential Pressure Indicating Switches Models 288A and 289A.
- h. Summary Report No. QSR 027-A-01, BWR Equipment Qualification Summary, Barton Model 288 Differential Pressure Switch, 10/2/80.
- i. ITT General Controls Engineering Report No. 721.77.095 ADDENDUM #2,
" Certification of NH90 Series Actuators For 50*C (122"F) Ambient Temperature and 20,000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> Usage at 60% Rated Load,"
5/16/81.
- j. ITT General Controls Engineering Report No. 721.77.095 ADDENDUM i5, " Summary of NH90 (Model B) Series Actuator Supplemental Generic Qualification Testing for Class lE Requirements, outside Containment," 2/10/80.
- k. Letter of 6/4/81 from ASCO to EDS containing materials lists for ASCO coils. & Frank!!n Research Center A Opumen of The Femman tumme
- 1. Letter of 6/18/81 from ASCO to'EDS containing Class A and Class F coil lead wires.
- m. Letter of 6/8/81 from ASCO to Toledo Edison Co. concerning environmental qualification of ASCO valves.
- n. Letter of 9/22/81 from Bailey Meter Co.
I to EDS concerning Bailey Meter Materials lists.
- o. Letter of 5/21/81 from Barksdale to EDS containing Non-Metallic Material List for T2H-M155S Temperature Switch.
- p. Letter of 10/30/75 from Boston Insulated Wire and Cable Co. to Bechtel concerning LOCA si:nulation tests of BIW cable.
- q. Letter of 3/26/81 from Fenwal to EDS concerning non-metallic parts in Fenwal 27120-22 Thermoswitch.
- r. Letter of 4/21/81 from Foxboro to EDS s
concerning environmental qualification of Foxboro transmitte'rs.
- s. Letter of 4/13/81 from General Dynamics to EDS concerning Stator Coil Insulation materials for Electro Dynamic Motors.
- t. Letter of 3/26/81 from Differential Pressure Instruments to EDS concerning non-metallic parts in ITT Barton Pressure Indicating Switches Models 288A and 289A.
- u. Letter of 6/17/81 from D.P.I. to EDS concerning materials used in 288 and 289 ITT Barton Differential Precsure Switch.
- v. Letter of 6/5/81 from Licon to EDS concerning materials in Barton parts Nos.
00068-004-T and 5891-0001-Z.
(
- w. Letter of 6/19/81 from Kerite to EDS concerning submergence of Kerite Cable.
f a
~ ~ -. -.
- x. Letter of 4/27/79 from B&W to TBCO concerning Limitorque test reports.
- y. L'etter of 7/28/80 from B&W to Bechtel concerning Limitorque test reports.
- z. Letter of 11/5/80 from Limitorque to TECO concerning Limitorque test reports.
-r aa. Letter of 6/1/81 from B&W to TECO concerning Limitorque test reports.
bb. Letter of,7/13/81 from Bechtel to EDS concerning Limitorque test reports.
cc. Letter of 7/21/81 from Limitorque to EDS concerning Limitorque test reports.
dd. Letter of 7/7/81 from Limitorque to EDS concerning Limitorque test reports.
ee. Letter of 4/28/81 from Microswitch to EDS containing parts list for Microswitch lLS3.
ff. Letter of 4/2d/81 from Microswitch to EDS containing parts list for Microswitch LSD2B-4N.
gg. Letter of 5/1/81 from Okonite to EDS containing data on EP insulation.
~
hh. Lettar of 9/18/81 from Raychem to EDS
- oncerning Moisture Resistance of WCSF-N Heat Shrink Tubing.
- 11. Letter of 11/10/81 from Rees to Bechtel containing Rees lists of components and materials lists.
l jj. Letter of 3/11/31 from Rees to EDS ccntaining Material List for Pushbutton Switches.
kk. Letter cf 4/2/81 from Rees to EDS containing Material List for Pushbutton Switches..
d r.anklin Research Center 4:
mr- -
4 e
w
- 11. Letter of 7/14/80 from Stanwick to Bechtel containing component materials lists and testing documentation for Stanwick Terminal Blocks.
em. Letter of 2/18/81 from Stanwick to EDS containing component materials lists and testing data for Stanwick Type G Terminal Dlock.
nn. Letter of 1/27/78 from States to Yankee Atomic Electric concerning States NT and ZWM Terminal Blocks.
oo. Letter of 9/18/80 from Southern Company Services concerning Wyle Test Report 44354-1.
pp. Letter of 2/9/81 from States to EDS concerning States TWM and NT Terminal Block materials.
qq. Letter of 12/9/80 from SOR to TECO containing material lists for non-metallic parts in SOR pressure switches.
rr. Letter of 7/9/81 from SOR to EDS concerning qualification of SOR Pressure Switches.
ss. Letter of 7/20/81 from Westinghouse to EDS containing e.vironmental qualification docu.aentation for Westinghcuse Hydrogen Dilution System Motors.
tt. Letter of 8/15/80 from Toledo Edison Co.
to Babcock and Wilcox concerning HPI and LPI pumps.
uu. Telephone conversation of 7/30/81 besween F. Levancesti and J. Thompson en:.c,e ~ne standard test time for Equipment Qualification Tests, t
4 N0) ranMin Reseanch Center A Chenon of The Fransen besmae
,a..
s W.
EDS Calculation 1040-001-038, Arrhenius Model for Rosemount, Foxboro, and Bailey Transmitters.
ww. EDS Calculation 1040-001-040, Iow pH Analysis for Components Tested in a High pH Chemical Spray.
l xx. EDS Calculation 1040-001-042, Chemical Spray Analysis of Safety-Related Components.
yy. Boston Insulated Wire & Cable Company Prototype Test Report flo. 73C212, 6/18/73
- 22. Amphenol SAMS Operation Technical Report 123-1268, "Special Prototype Radiation, Environmental and Short Circuit Testing p
of a Type 2 Low Voltage Power Penetration Assembly used on Davis-Besse Nuclear Power Station Unit No.
1," 3/12/75.
l l
- eb 1 nklin Research Center A Chuman J The Feenaan %
~ -
REFERENCES 1.
R. P. Crouse i
Letter to J. F. Stolz, NRC.
Subject:
Response to SER for the Environmental Qualification of Safety-Related Electrical Equipment at Davis-Besse Nuclear Power Station Toledo Edison Co., 12-Oct-81 Serial No. 750 i
2.
R. P. Crouse Letter to J. Keppler, NRC.
Subject:
Revision 3 of response to IE j
Bulletin 79-01B for Davis-Basse Nuclear Power Station Unit 1 Toledo Edison, 30-Jan-81 1
1-184 3.
Office of Nuclear Reactor Regulation
~
~
Safety Evaluation Report for Davis-Besse Unit 1 Environmental Qualification of Safety-Related Electrical Equipment NRC, 05-Jun-81 e
m A Dhamm of The Frerunn humanume i
- - - -..