Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20042E584 | 12 April 1990 | Urges Commission to Consider Citizens for Fair Util Regulation Request to Delay Full Power Licensing of Plant Until Issue Raised by Residents Can Be Further Investigated & Resolved.Related Correspondence | |
ML20012D210 | 26 February 1990 | Expresses Concerns Re SALP Process & NRC Decision to Issue SALP Rept W/O Adequate Consideration of Negative Findings | Systematic Assessment of Licensee Performance |
ML20006B647 | 25 January 1990 | Forwards 900124 Ltr to Util Re Licensee 900122 Response to Case 900110 Ltr & Advises That Ltr self-explanatory & Contains Info Needed to Resolve Matters Raised in Case 900110 Ltr from Bp Garde to Recipient | |
ML20005G693 | 10 January 1990 | Forwards Corrected 900109 Ltr Re Analytical Evaluation of Station Svc Water Sys by Case Consultant J Doyle | |
ML19354D765 | 10 January 1990 | Forwards Revised Pages to Analytical Evaluation of Station Svc Water Sys for Comanche Peak & Requests That Previously Sent Pages ES-32 & ES-33 Be Replaced W/Revised ES-32 & ES-33 & Pages 208 & 209 W/Revised Pages 208,209 & 210 | |
ML19332C621 | 20 October 1989 | FOIA Request for Documents Re Down Grading of Severity Level III Violation at Plant in Insp Rept 50-445/88-47 & 50-445/88-42 & Hs Phillips June 1989 Memo to NRC | |
ML20248J356 | 15 October 1989 | Request for Stay Filed by Citizens for Fair Util Regulation CLI-88-12.* Forwards Stay for Filing | |
ML19332E319 | 12 October 1989 | Requests Opportunity to Make Brief Presentation Re Plant at Commission Informational Meeting on 891019 in Rockville,Md, Per 891011 Telcon W/B Hill.Dallas Morning News 890612 Article Encl | |
ML19332F818 | 10 October 1989 | Requests Appearance Before Commission 891019 Briefing to Address Concerns Re Pending NRC Decision on Plant Licensing. Request for Stay of Fuel Load & Low Power Testing Until Appellate Review Complete,Being Forwarded Separately | |
ML19327A916 | 8 September 1989 | FOIA Request for Ofc of Investigations Rept Re Testing of Fasteners Installed at Facility | |
ML20247B524 | 14 July 1989 | Forwards Certificate of Svc as Replacement for Certificate Signed on 890713 by M Lyons & Signature Page to Replace Original.W/Certificate of Svc | |
ML20246A658 | 28 June 1989 | Requests Verification of Evacuation Time Estimates as Stated in 1987 Nuclear Power Safety Rept for Plant by 890717 | |
ML20236D796 | 13 March 1989 | Submits First Formal Request for NRC Action Re Unit 1 1982 RCS Primary Cold Hydrostatic Test,Per 880630 Joint Stipulation Among Case,Util & Nrc.Documented Request for Action Encl | Hydrostatic VT-2 |
ML20236C500 | 13 March 1989 | Forwards Technical Evaluation of Comanche Peak Steam Electric Station 1982 Hydro Test & ASME Section XI VT-2 Test | Hydrostatic VT-2 |
ML20196F743 | 11 November 1988 | Responds to 881007 Correspondence from NUMARC to NRC Re Beliefs & Interpretation of Plant Settlement.Numarc Attempts to Influence Commission Inappropriate.Served on 881201 | |
ML20154G729 | 12 September 1988 | Forwards Citizens for Fair Util Regulation First Suppl to 880811 Request for Hearing & Petition for Leave to Intervene | |
ML20206H482 | 9 September 1988 | FOIA Request for Documents in Connection W/Insp Repts 50-445/88-51 & 50-446/88-47 Between 880707-0802 | |
ML20205E947 | 22 August 1988 | FOIA Request for Documents Re NRC 880707-0802 Insp of Activities Authorized by NRC CPs CPPR-126 & CPPR-127 | |
ML20207E564 | 12 August 1988 | Forwards Corrected Page 6 to 880811 Petition for Hearing & Petition for Leave to Intervene | |
ML20207E515 | 11 August 1988 | Forwards Request for Hearing & Petition for Leave to Intervene by Citizens for Fair Util Regulation | |
ML20244D980 | 8 July 1988 | Clarifies Position Re Notices of Intent to File Motion for Intervention & Substitution of Parties,Motion to Proceed as J Doe & Motion to Make Public Any Settlement Agreements Enacted by Parties in above-styled Case | |
ML20150D503 | 8 July 1988 | Forwards Motions to Intervene & for Sua Sponte Filed on Behalf of Citizens for Fair Util Regulation & Individual Residents | |
ML20150D509 | 7 July 1988 | Forwards Substitute Pleadings of Petitioner J Doe | |
ML20196G844 | 29 June 1988 | Expresses Opposition to Licensee Request for Extension of CP Completion Date for Unit.Three CP Application Dockets Urged to Be Consolidated for All Matters Since Underlying Issue Identical to All | |
ML20206E760 | 9 June 1988 | FOIA Request for Documents Generated by NRC Re Findings of Comanche Peak Rept Review Group (CPRRG/NUREG-1257) | |
ML20154H649 | 21 May 1988 | Requests to Be Advised of Projected Schedule for Issuance of Sser Re Each Remaining Project Status Repts,Including Collective Evaluation Rept & Collective Significance Rept. Related Correspondence | |
ML20154H756 | 17 May 1988 | Forwards Pf Mckee on Technical Concerns Re Pipe Support Design Issues | Coatings Finite Element Analysis Backfit |
ML20154F006 | 11 May 1988 | Forwards Listed Documents,Per Roisman ,Including Technical Analysis Corp QA Program at Comanche Peak Steam Electric Station & Southern Engineering Rept on Rural Electric Cooperatives. W/Svc List.Related Correspondence | Safe Shutdown Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Systematic Assessment of Licensee Performance Battery sizing Earthquake Liquid penetrant Backfit |
ML20154E482 | 6 May 1988 | Advises That Listed Documents Received Per Agreement Reached W/Minority Owners Re Discovery in Proceeding.Summary & Conclusions of Technical Analysis Corp Document Encl.Related Correspondence | |
ML20206C165 | 21 April 1988 | Forwards Notarized & Signed Authorization Granting MD Kohn Access to Any & All Documents Re Request | |
ML20151P046 | 15 April 1988 | Forwards Initial Complaint of J Goese & Amended Complaint of R Radelich in Order to Keep Board Informed of Potentially Significant Info Re Proceedings.Questions Raised Re How Applicant Reinsp Program Being Implemented | Coatings |
ML20206C159 | 29 February 1988 | FOIA Request for Documents Re Correspondence Between Util & NRC Regarding Use of Incorrect Stiffness Values for Class I Stress Analysis Performed by Westinghouse,Allegations & Improper or Unethical Conduct | |
ML20148J751 | 5 January 1988 | FOIA Request for Documents Re 871231 Insp Repts 50-445/87-27 & 50-446/87-20 & Notice of Violation | |
ML20147A728 | 10 December 1987 | Appeals Denial of FOIA Request for Documents Re Rf Warnick to Wg Counsil Forwarding Insp Repts 50-445/87-11 & 50-446/87-09 on 870605-0707 | |
ML20237B653 | 9 December 1987 | Advises That Proposed Procedure in Does Not Solve Problem of Accessing Documents.Nothing in Ltr Obviates Need for Continuing W/Foia Requests.Related Correspondence | |
ML20196F665 | 8 December 1987 | FOIA Request for Documents Re Insp Repts 50-445/87-23 & 50-446/87-17.Info Required as Part of Ongoing Monitoring Project | |
ML20236P881 | 9 November 1987 | Submits Case Comments on ASLB 871103 Scheduling Order. Time Frames Less than in NRC Regulations Would Be Great Injustice & Applicants Should Produce Documents in Timely Manner | |
ML20236V633 | 6 November 1987 | Appeals Denial of FOIA Request for Documents Re V Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan | |
ML20236V585 | 6 November 1987 | Appeals Denial of FOIA Request for Documents Re Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan | |
ML20236C279 | 19 October 1987 | Forwards Potential 10CFR50.55(e) Items Case Has Received Since Info Initially Provided to Board on 871001 to Keep Board up-to-date on Matters of Potential Significance. Related Correspondence | Safe Shutdown Hydrostatic Coatings FLEX |
ML20236L721 | 7 October 1987 | FOIA Request for Records on Summary of 870902-04 Audit Re Implementation of Piping Generic Technical Issue Resolutions | |
ML20235R456 | 1 October 1987 | Potential 10CFR50.55(e) Items.* Forwards Significant Deficiency Analysis Repts Received Since 870814.Related Correspondence | Safe Shutdown Coatings Emergency Lighting Finite Element Analysis Fire Protection Program Backfit |
ML20235R469 | 28 September 1987 | Fowards Case Answer to Applicants 870820 Motion for Establishment of Schedule | |
ML20147A913 | 16 September 1987 | FOIA Request for All Agency Records & Info in Connection W/Rf Warnick to Wg Counsil Forwarding Insp Repts 50-445/87-11 & 50-446/87-09 on 870605-0707 | |
ML20238E505 | 9 September 1987 | Forwards Intervenors Response to Util Motion to Quash Discovery Request.Ref Attachment Will Be Sent Under Separate Cover.Exhibit Is Informational Only | |
ML20236D860 | 3 September 1987 | FOIA Request for Documents in Connection W/Jg Keppler to Wg Counsil Re Withdrawal of Violation | |
ML20235E838 | 1 September 1987 | FOIA Request for Records Re C Grimes to ASLB Concerning Ofc of Inspector & Auditor Rept of Investigation 86-10 | |
ML20245C419 | 1 September 1987 | FOIA Request for Documents Generated in Connection W/Stello 870121 Memo Establishing Comanche Peak Rept Review Group, Notes of Stello Meeting W/Involved Individuals & region-wide Training Program & Guidance Plan | |
ML20238E541 | 1 September 1987 | Comments on Board Notification 87-12,rept of Investigation by Ofc of Inspector & Auditor,NUREG-1257 & V Stello 870414 Memo to Chairman Zech.Further Motions Will Be Filed After Reviewing Records & Appropriate Action Taken | |
ML20237J716 | 24 August 1987 | Requests Author Name Be Added to Region IV Ofc of Special Projects Mailing List |