Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20210C262 | 13 July 1999 | Rev 1 to 22S-B-11X-0068, Determination of Heat Load Assemblies F50D & Z33A | |
ML20209E789 | 23 June 1999 | Rev 2 to 22S-110M-0063, Max Cladding Temp for Uncovered Spent Fuel Rod | Fuel cladding |
ML20209E770 | 14 June 1999 | Rev 0 to 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A | |
ML20209E777 | 4 June 1999 | Rev 0 to PSA-Z-99-01, Calculation of Decay Heat Load for Zion Spent Fuel Pool | |
ML20205R024 | 30 December 1998 | Rev 1 to Calculation 22S-0-110M-0063, Max Cladding Temp for Uncovered Spent Fuel Rod | Fuel cladding |
ML20205R050 | 9 December 1998 | Calculation 22N-0-110M-0067, Gamma Shine Dose at Exclusion Area Boundary Resulting from Spent Fuel Pool Dewatering Event. Pages 75,97 & 127 of Incoming Submittal Not Included | |
ML20209E807 | 9 December 1998 | Rev 0 to 22N-0-110M-0067, Gamma Shine Dose at Exclusion Area Boundry Resulting from Spent Fuel Pool Dewatering Event, Pages 75,97 & 127 | |
ML20199C398 | 8 October 1997 | Evaluation of Containment Shell for Main Steam Line Break (Mslb), Rev 0 | Stroke time Coast down |
ML20216A891 | 18 April 1997 | Rev 0 to 22S-2-004M-207, Piping Stress Analysis of Subsystem 2RC-02 | |
ML20216A883 | 6 March 1997 | Rev 0 to 22S-B-004M-215, Pressurizer Power Operated Relief Valves Piping Hydrodynamic Loads | Loop seal |
ML20138K031 | 22 January 1997 | Containment Sump Zone of Influence for Coatings | Coatings |
ML20138K036 | 17 January 1997 | RHR Pump Available NPSH During Post-LOCA Recirculation Phase.Rev 2 | |
ML20134J501 | 4 November 1996 | Rev 0 to Calculation 22S-B-004E-189, Low Temp Overpressurization Protection (LTOP) Setpoint Calculation | Stroke time |
ML20134J536 | 4 November 1996 | Rev 0 to Calculation 22S-B-004E-166, Coms/Ltop Pressure Instrument Loop Accuracy Calculation | |
ML20129E975 | 18 October 1996 | Rev 3 to Wide Range RCS Cold Leg Temp Indication Uncertainty | |
ML20129E949 | 14 May 1996 | Rev 0 to Low Temp Overpressurization Protection (LTOP) Setpoint Calculation | Stroke time |
ML20129E983 | 18 January 1996 | Rev 0 to Coms/Ltop Pressure Instrument Loop Accuracy Calculation | |
ML20058P640 | 11 March 1993 | Control Room Habitability Radiological Dose Analysis | |
ML20058P101 | 28 January 1993 | Safety Related Containment Sprayed Volume Analysis | |
ML20058P615 | 30 November 1992 | Organic Iodine Recirculation Spray Removal Rate |