Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
DCL-98-066, Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel | 1 May 1998 | Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel | |
DCL-98-028, Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval | 15 April 1998 | Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval | |
ML20045H648 | 7 July 1993 | License Amend Request 93-04 to Licenses DPR-80 & DPR-82, Revising TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents for Consistency W/Interpretation of Restricted Area Per 10CFR20 | |
ML16342B979 | 7 May 1993 | License Amend Request 93-01 to Licenses DPR-80 & DPR-82, Changing TS 3/4.3.3.5, Remote Shutdown Instrumentation, to Add Remote Shutdown Control Functions & Increase Allowed Outage Time for Inoperable Function from 7 to 30 Days | Safe Shutdown Ultimate heat sink Earthquake |
ML16341F854 | 18 October 1990 | Application for Amends to Licenses DPR-80 & DPR-82,revising Section 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map | |
ML16341F852 | 18 October 1990 | Application for Amends to Licenses DPR-80 & DPR-82.Amends Revise Tech Spec 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map | |
DCL-89-226, Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves | 6 September 1989 | Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves | |
ML20063P852 | 12 October 1982 | Suppl to 820719 Application for Amend to License DPR-76 Re Security Plan.Encl Withheld (Ref 10CFR73.21) | |
ML20065F779 | 17 September 1982 | Application to Amend License DPR-76,revising Security Plan. Safeguards Info Deleted | |
ML16341B415 | 28 August 1980 | Amend 85 to OL Application,Including Matl for FSAR Chapters 4,13,14 & 17 | |
ML19263C172 | 5 February 1979 | Amends 75 & 76 to License Application.Includes Matl for Chapters 4,4A & 10 of Hosgri Seismic Evaluation | Boric Acid Shutdown Margin Safe Shutdown Earthquake Earthquake |
ML20083K887 | 25 January 1979 | Amend 74 to License Application.Removes & Inserts Matl Re FSAR Chapter 13 | |
ML20150C330 | 15 November 1978 | Amend 72 & Amend 73 to Oper Lic Appl W/Addl Matl for Hosgri Seismic Eval & Fsar,Respectively | Safe Shutdown Boric Acid Stroke time Hydrostatic Coatings Finite Element Analysis Earthquake Liquid penetrant Power change |