Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DCL-98-066, Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel1 May 1998Suppl to LAR 98-04 to Licenses DPR-80 & DPR-82,replacing Requirement for Operations Manager to Hold SRO License W/ Allowance,Operations Middle Manager Hold SRO License & Responsible for Directing Work of Shift Personnel
DCL-98-028, Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval15 April 1998Supplemental Application for Amends to Licenses DPR-80 & DPR-82,changing Surveillance Frequency for Several TS from at Least Once Every 18 Months to at Least Once Per Refueling Interval
ML20045H6487 July 1993License Amend Request 93-04 to Licenses DPR-80 & DPR-82, Revising TS 5.1.3, Map Defining Unrestricted Areas & Site Boundary for Radioactive Gaseous & Liquid Effluents for Consistency W/Interpretation of Restricted Area Per 10CFR20
ML16342B9797 May 1993License Amend Request 93-01 to Licenses DPR-80 & DPR-82, Changing TS 3/4.3.3.5, Remote Shutdown Instrumentation, to Add Remote Shutdown Control Functions & Increase Allowed Outage Time for Inoperable Function from 7 to 30 DaysSafe Shutdown
Ultimate heat sink
Earthquake
ML16341F85418 October 1990Application for Amends to Licenses DPR-80 & DPR-82,revising Section 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map
ML16341F85218 October 1990Application for Amends to Licenses DPR-80 & DPR-82.Amends Revise Tech Spec 3/4.2.4, Quadrant Power Tilt Ratio, to Permit Determination of Quadrant Power Tilt Ratio by Full Incore Flux Map
DCL-89-226, Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves6 September 1989Application for Amends to Licenses DPR-80 & DPR-82,revising Tech Specs 3.4.2.1,3.4.2.2,Table 3.7-2 & Associated Bases for Pressurizer & Main Steam Line Safety Valves
ML20063P85212 October 1982Suppl to 820719 Application for Amend to License DPR-76 Re Security Plan.Encl Withheld (Ref 10CFR73.21)
ML20065F77917 September 1982Application to Amend License DPR-76,revising Security Plan. Safeguards Info Deleted
ML16341B41528 August 1980Amend 85 to OL Application,Including Matl for FSAR Chapters 4,13,14 & 17
ML19263C1725 February 1979Amends 75 & 76 to License Application.Includes Matl for Chapters 4,4A & 10 of Hosgri Seismic EvaluationBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Earthquake
ML20083K88725 January 1979Amend 74 to License Application.Removes & Inserts Matl Re FSAR Chapter 13
ML20150C33015 November 1978Amend 72 & Amend 73 to Oper Lic Appl W/Addl Matl for Hosgri Seismic Eval & Fsar,RespectivelySafe Shutdown
Boric Acid
Stroke time
Hydrostatic
Coatings
Finite Element Analysis
Earthquake
Liquid penetrant
Power change