AMENDMENT 85 INSTRUCTION SHEET (File this instruction sheet in the front of Volume 1 as a record change.)
The following instructions and check list are provided as a guide for the insertion of new pages for Amendment 85 in the FSAR for Units 1 and 2 Diablo Canyon Site.
The new pages are marked "Amendment 85 and (August 1980)" and contain both amended and supplementary material.
This material is indicated by a vertical bar with the figure "85" inscribed in the adjacent margin of, the page.
Where such marks appear adjacent to a blank portion of a page, a
deletion is indicated.
Where pages have been changed only to reposition material, with no change in content, only the amendment number and the date are given.
It is especially important to note that Amendment 85 includes extensive revisions of both Chapter 13 Conduct of Operations and Chapter 17 Quality Assurance.
Vertical chan e bars on the "insertion" a es of these two Cha ters are intentionall omitted.
The entire text for both, Chapters and the Appendix containing resumes (13.1-A) are to be removed and inserted with the new material.
Since the FSAR is printed on both sides of sheets of loose-leaf
- paper, the front or back page of an Amendment 85 sheet may be reprinted with nn change.
Such 'pages are not identified with amendment number and date.
For a brief description of the changes made by Amendment 85, see the SENARY OF AMENDMENT 85 which precedes the "REMOVAL-INSERTION" INSTRUCTIONS.
(August 1980) 8 0 D90gp pe Amendment 85
SUGARY OF AMENDMENT 85 Location of Chan e
4-vi 13-i through 13-iv 13-vi 13.1-1 through 13.1-14 13.1A-3 through 13.1A 102 Figure 13.1-1 Figure 13.1-2 Figure 13,1-2 (left) and Figure 13,1-2 (right)
Figure 13.1-4 (left) and Figure 13.1-4 (right)
Comment Revised FIGURES page to reflect delet'on of "part-length" control rods in Figures 4.2-13 and 4.2-21 documented in Amendment 84.
Revised CONTENTS pages to reflect changes in Section 13.1 ORGANIZATIONAL STRUC-TURE, Section 13.2 TRAINING PROGRAM, Section 13.3 EMERGENCY PLANNING, Section '13.4 - REVIEW AND AUDIT.
Ditto.
Revised entire Section 13.1 ORGANIZATIONAL STRUCTURE.
Revised and transposed entire Appendix A-Resumes of Operating Organization Personnel to new Section 13.1B-Appendix B.
Inserted resumes of Nuclear Power Generation Department.
Revised former Appendix A Resumes of on-site Operating Organization Personnel and inserted in new Section 13.1B-Appendix B.
Revised Pacific Gas and Electric Company Corporate Organization to illustrate Nuclear Power Generation Department.
Deleted "Relationship of Department of Steam Generation to Division Operating Organizations."
Inserted new organization chart of Nuclear Power Generation Department.
Revised on-site "Operating Organization"
- chart, Amendment 85 (August 1980)
Location of Chan e
5 Comment Figure 13.1-5 13.3-1 through 13.3-17 13.4-1 through 13.4-3 14.1-2 14.1-3 14.1-4 14.1-5 14.1-7 14.1-9 14.1-16 Table 14.1-2 (Sheet 1 of 8)
Table 14.1-2 (Sheet 2 of 8)
Table 14.1-2 Figure 14.1-1 14.2-1 through 14.2-3 14.2-4 14.2-7 14.2A-1 and 14.2A-3 Inserted "Control Room Shift Organization" chart.
Revised entire Section 13.3 ENERGENCY PLANNING.
Revised entire Section 13.4 REVIEW AND AUDIT.
Revised position title from "Resident Startup Engineer" to read "Lead Startup Engineer. "
Ditto.
Ditto.
Ditto.
Ditto.
Revised "AEC" to read "NRC. "
Revised position title from "Resident Startup Engineer" to read "Lead Startup Engineer."
Deleted reference(s) to "Part Length Control Rod(s)"
Ditto.
Ditto.
Deleted Procedure Title/Test Description, 4.20 "Part Length Rod Insertion/
Removal. "
Ditto.
Revised "Power Plant Superintendent" to read "Plant Superintendent."
Revised "Resident" to read "Lead. "
Revised "August of 1979" to read "June, 1980 "
Revised resume title from "Resident Startup Engineer" to read "Lead Startup Engineer."
(August.1980)
Amendment 85
Location of Chan e
comment 17-i through 17-iv 17-v 17.1-1 through 17.1-39 Figure 17.1-1 17;2-1 through 17.2-28 Figure 17.2-1 Figure 17.'2-2 Revised CONTENTS pages to reflect changes DURING DESIGN, CONSTRUCTION, AND SYARYIJP and Section 17.2 gSALYYY ASSURANCE PROGRAM FOR PLANT OPERATION.
r Ditto.
Revised entire Section 17.1 QUALITY ASSURANCE DURING DESIGN CONSTRUCTION AND STARTUP.
Revised "Extract of PGandE Organization Chart Emphasizing Quality Assurance."
Revised entire Section 17.2 QUALITY ASSURANCE PROGRAM FOR PLANT OPERATION.
Revised "Extract of PGandE Organization Chart Emphasizing Quality Assurance Applicable To Plant Operation."
Deleted "Applicable to Plant Operation" from title..
Revised "Extract of PGandE Organization Chart Emphasizing Quality Assurance."
Amendment 85 (August 1980)
o REMOVAL INSERTION INSTRUCTIONS Remove Insert New Material,
-v/4-vi 4-v/4-v'i 3-i/13-ii through 13-v/13-vi 13-i/13-ii through 13-v/13-vi V 13.1-1/13.1-2 through
~13.1-13/13.1-14 13.1-1/13.1-2 through 13.1-21/13.1-22 13.1A-1/13.1A-2 through
~13. 1&101/13.14-102 13.1A-i/13.1A-ii through 13.1A-28/
13.1A-28a 13.1B-i/13.1B-ii through 13.1B-87/blank
~igure 13.1-1/blank Figure 13.1-1/blank Figure 13.1-2/blank Blank/Figure 13.1-2 (left) and Figure 13.1-2 (right)/blank
'lgura 13.1-4/blank Blank/Figure 13.1-4 <<(left) and Figure 13.1-4 (right)/blank lone Figure 13.1-5/blank 13.3-1/13.3-2 through
~13. 3-17/b lank 13.3-1/13.3-2 v 13.4-1/13.4-2 through
~13.4-3/blank
+14.1-1/14.1-2 13.4-1/13.4-2 through 13.4-5/13.4-6 14.1-1/14.1-2 (August 1980)
Amendment 85
Remove Inser i
v Haterial
&14. 1-3/14. 1-4
+14.1-5/14.1-6
/14. 1-7/14.1-B
- 4. 1-9/14. 1-10
-,~4.1-15/14.1-16 14.1-3/14.1-4 14.1-5/14.1-6 14.1-7/14.1-8 14.1-9/14.1-10 14.1-15/14.1-16
~able 14.1-2 (Sheet 1 of 8)/
Mable 14:1-2 (Sheet 2 of 8)
Table 14.1-2 (Sheet 1 of 8)/
Table 14.1-2 (Sheet 2 of 8)
~Table 14.1-2 (Sheet 7 of 8)/
V Table 14.1-2 (Sheet 8 of 8)
Table 14.1-2 (Sheet 7 of 8)/
, Table 14.1-2 (Sheet 8 of 8)
~igure
- 14. 1-1/blank
~14. 2-1/14, 2-2 o 14.2-3/14.2-4
.2-7/Blank
~4.2A-1/14.2A-2 Figure 14.1-1/blank 14.2-1/14.2-2 14.2-3/14.2-4 14.2-7/Blank 14.2A-1/14.2A-2
~4.2A-3/14.2A-4 14.2A-3/14.2A-4 M7-i/17-ii through 17-v/17-vi 17-i/17ii through 17-v/17-vi v 17.1-1/17.1-2 through
~17. 1-39/blank 17.1-1/17.1-2 through 17.1-39/blank igure 17.1-1 Figure 17.1-1 V17:2-'/17.2-2 through
+ 17.2-27/17.2-28 17.2-1/17.2-2 through 17.2-35/blank
'igure 17.2-1 Figure 17.2-1 igure 17.2-2 Figure 17.2-2 Amendment 85 (August 1980)