Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000528/20210904 March 2021Notice of Violation; NRC Inspection Report 05000528/2021090, 05000529/2021090, and 05000530/2021090
IR 05000528/201300214 May 2013IR 05000528, 529, 530/-13-002; 01/01/2013 - 03/31/2013; Palo Verde Nuclear Generating Station (PVNGS), Integrated Resident and Regional Report; Op.Evals., Exer.Eval., Radioactive Gaseous & Liquid Effluent Treatment, Radioactive Solid Waste Processing...Unanalyzed Condition
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Operability Determination
Earthquake
Through-Wall Leak
Through-Wall Leakage
Fire Protection Program
Power change
Siren
Power Uprate
ML13134A35214 May 2013IR 05000528, 529, 530/-13-002; 01/01/2013 - 03/31/2013; Palo Verde Nuclear Generating Station (Pvngs), Integrated Resident and Regional Report; Op.Evals., Exer.Eval., Radioactive Gaseous & Liquid Effluent Treatment, Radioactive Solid WasteUnanalyzed Condition
Ultimate heat sink
Offsite Dose Calculation Manual
Post Accident Monitoring
Internal Flooding
Enforcement Discretion
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Large early release frequency
Earthquake
Through-Wall Leak
Fire Protection Program
Power change
IR 05000528/201000828 January 2011IR 05000528-10-008, 05000529-10-008, 05000530-10-008, on 11/29/2010 - 12/17/2010, Palo Verde Nuclear Generating Station Units 1, 2, and 3 Biennial Baseline Inspection of the Identification and Resolution of ProblemsUltimate heat sink
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Operability Assessment
IR 05000528/200900529 June 2010NRC Integrated Inspection Report 05000528-09-005, 05000529-09-005, and 05000530-09-005, and Notice of Violation - ErrataUnanalyzed Condition
Boric Acid
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Significance Determination Process
Tornado Missile Protection
Large early release frequency
Operability Determination
Code Reconciliation
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Downpower
Siren
Overexposure
ML1004000709 February 2010IR 05000528-09-005, 05000529-09-005, 05000530-09-005; on 10/01/09-12/31/09; Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - NRC Integrated Inspection Report, and Notice of ViolationUnanalyzed Condition
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Time to boil
Weld Overlay
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Large early release frequency
Operability Determination
Code Reconciliation
Liquid penetrant
DM weld
Scaffolding
Substantial potential for an overexposure
Downpower
Siren
IR 05000530/200900620 March 2009IR 05000528; 05000529; 05000530-09-006; 02/02/2009 - 02/27/2009; Palo Verde, Nuclear Generating Station Units 1, 2, and 3; Biennial Baseline Inspection of the Identification and Resolution of Problems, and Other ActivitiesUnanalyzed Condition
Boric Acid
Hydrostatic
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Operability Determination
License Renewal
Through-Wall Leak
Scaffolding
Downpower
Coast down
Operability Assessment
IR 05000528/200601221 February 2007EA-06-296 Ltr to Randall K. Edington, Sr V P- Nuclear, from Bruce S. Mallett, RA, Riv, Final Significance Determination for a White Finding and NOV - NRC Special IR 05000528/2006-012; 05000529/2006-012; 05000530/2006-012 Palo Verde 02/21/0Probabilistic Risk Assessment
Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML07044021215 February 2007EN-07-007 - Issuance of Final Significance Determination and Notice of Violation for Arizona Public Service CoSignificance Determination Process
ML05178038027 June 2005EA-05-037 Arizona Public Service Company Notice of Violation (NRC Inspection Report 05000528-05-011, 05000529-05-011, and 05000530-05-011)Enforcement Discretion
Deep Dose Equivalent
ML0510100098 April 2005EA-04-221, Arizona Public Service Company, Final Significance Determination for a Yellow Finding and Notice of Violation - NRC Special Inspection Report 2004-014 - Palo Verde Nuclear Generating StationSafe Shutdown
Unanalyzed Condition
Internal Flooding
Probabilistic Risk Assessment
Significance Determination Process
Earthquake