EN-07-007 - Issuance of Final Significance Determination and Notice of Violation for Arizona Public Service Co
ML070440212
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/15/2007
From: Carpenter C
NRC/OE
To:
Arizona Public Service Co
Starkey D
References
EA-06-296 EN-07-007
Download: ML070440212 (2)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION February 15, 2007 EN-07-007 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Arizona Public Service Company (EA-06-296)

Palo Verde Nuclear Generating Station, Unit 3 Docket No. 05000530

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION AND NOTICE OF VIOLATION This is to inform the Commission that a Notice of Violation associated with a White significance determination process finding will be issued on or around February 21, 2007, to Arizona Public Service Company as a result of inspections at the Palo Verde Nuclear Generating Station, Unit 3. This White finding, an issue of low to moderate safety significance which may require additional U.S. Nuclear Regulatory Commission inspection, involved the failures of the Unit 3, Train A Emergency Diesel Generator (EDG A) to perform its safety function when tested on July 25 and September 22, 2006. This action will move Palo Verde Unit 3 to the multiple/repetitive degraded cornerstone column of the NRCs Action Matrix.

A Notice of Violation is included based on a violation of 10 CFR 50, Appendix B, Criteria V, Instructions, Procedures, and Drawings and a violation of 10 CFR 50, Appendix B, Criteria XVI, Corrective Action. Specifically, the licensee failed to develop appropriate instructions or procedures for corrective maintenance activities on the Unit 3, EDG A K-1 relay and did not identify and correct the cause of the erratic K-1 relay operation prior to installation of the relay on July 26, 2006. (The K-1 relay is a key component, which must operate properly in order for the EDGs mechanical output to be converted and routed as electricity for safety components during certain types of accidents.) These failures by the licensee resulted in the emergency diesel generator being in a condition of reduced reliability between July 26, 2006, and September 4, 2006, and inoperable between September 4 and September 22, 2006.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Final Significance Determination February 21, 2007 Telephone Notification of Licensee February 21, 2007 The State of Arizona will be notified.

Contacts: Doug Starkey, OE, 301-415-3456 David Solorio, OE, 301-415-2741 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Electronic Distribution: EN-07-007, February 15, 2007 OWFN OWFN TWFN Regional Offices Chairman Klein DO OCFO RI RII Comm. McGaffigan DEDR OP CENTER RIII RIV Comm. Merrifield DEDMRS NMSS Comm. Jaczko OE OIG Comm. Lyons OGC OCIO MAIL SECY NRR RES PUBLIC OCA NSIR ACRS OE staff PA OI IP STP DISTRIBUTION: (Hard copy)

C. Carpenter, OE M. Fahey, OE D. Starkey D. Solorio OE r/f EA-06-296 File EN binder ML070440212 X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive G

File Name: C:\MyFiles\Checkout\EN-07-007 Palo Verde.drs.wpd OE:ES OE:SC DStarkey DSolorio 02/13/07 02/14/07 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION