ML23129A0282 May 202320230502, NEI Issues for Event Notification Implementation WorkshopsTime of Discovery
Contraband
ML22297A24820 October 2022NEI Comments on 10-20-2022 CCF Meeting Feedback and Comments
ML23072A06330 September 2022(Draft) NEI White Paper Remediation of Vulnerabilities Identified in CDAs - 08302022R0Cyber Security
ML22109A2088 April 2022April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0
ML22019A29212 January 2022NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification RequirementsCoatings
Nondestructive Examination
Aging Management
ML21130A5987 May 2021NEI Responses to NRC Staff Comments on NEI 20-07 Draft B
ML21089A09018 March 2021NEI Comments on Renewal of Performance Indicators Information Collection, March 18, 2021Probabilistic Risk Assessment
Power change
ML20141L78820 May 2020NEI - Comments on Draft Micro-Reactor Applications COL-ISG-029, Environmental Considerations Associated with Micro-ReactorsLicense Renewal
Exemption Request
Environmental Justice
ML20100G90331 March 2020NEI 15-03, Rev. 3, Licensee Actions to Address Nonconservative Technical SpecificationsUnanalyzed Condition
Nonconservative Technical Specifications
ML20038A1956 February 2020NEI Dic Comments on BTP 7-19 Revision 8 to Support Feb 11 2020 Public Meeting
ML19312B10215 October 2019NEI Letter to A. Kock Industry Proposal 2 - Smarter Program for Fuel Cycle Facilities; Follow Up to September 25, 2019 Public Meeting in Preparation for Subsequent Fall 2019 MeetingsFLEX
ML19239A01627 August 2019NEI Comments on IMC 0609, Appendix a and Attachment 1 August 2019Mission time
Internal Flooding
Functionality Assessment
FLEX
Significance Determination Process
B.5.b Mitigating Strategies
Fuel cladding
ML19226A33414 August 2019(NEI) - Comments on Draft Interim Staff Guidance on the Chromium-Coated Zirconium Alloy Fuel Cladding Accident Tolerant Fuel ConceptCoatings
Fuel cladding
ML19261B9551 August 2019Miscellaneous Material Related to DG-1353 on Licensing Basis for Non-LWRs
ML19142A07120 May 2019NEI 07-07 Rev 1, Industry Groundwater Protection Initiative - Final Guidance.
ML18324A7779 November 2018(NEI)- Summary of Information Provided at the October 17, 2018 Public Meeting Association with Implementation of Open Phase Isolation Systems - ML18271A111Open Phase Condition
Offsite Circuit
ML18275A1211 October 2018Letter from Nuclear Energy Institute Endorsement of Iso/Iec 17025: 2017, General Requirements for the Competence of Testing and Calibration Laboratories.Commercial Grade Dedication
ML18268A11420 September 2018Industry Initiative on Open Phase Condition, Revision 2Open Phase Condition
ML18260A00114 September 2018September 14, 2018, Update to NEI 17-06Commercial Grade Dedication
ML18180A31316 March 2018NEI Recommendations for NRC Regulatory Tranformation InitiativeProbabilistic Risk Assessment
Tornado Generated Missile
ML17268A03630 September 2017NEI 17-02, Revision 1, Tornado Missile Risk Evaluator (TMRE) Industry Guidance DocumentSafe Shutdown
High winds
Mission time
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
Finite Element Analysis
Tornado Generated Missile
Tornado Missile Protection
Surveillance Frequency Control Program
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Fuel cladding
Scaffolding
ML17249A09530 September 2017NEI 12-04, Revision 1, Draft a, Guidelines for 10 CFR 72.48 Implementation.Safe Shutdown
Tornado Missile
Hydrostatic
Temporary Modification
Incorporated by reference
Aging Management
Design basis earthquake
Exemption Request
Earthquake
Fuel cladding
Fire Protection Program
Scaffolding
ML17234A61531 August 2017NEI 13-10, Revision 6, Cyber Security Assessment.Safe Shutdown
Probabilistic Risk Assessment
Met Tower
Cyber Security
Scaffolding
ML17230A3534 August 2017Anchor Darling Double Disc Gate Valve Industry Resolution Plan 8-4-2017 UpdateAnchor Darling
ML17212A63531 July 201707-20-17 NEI 0809 Addendum 4 Attachment 2Cyber Security
ML17209A73514 July 2017Anchor Darling Double Disc Gate Valve Industry Resolution PlanAnchor Darling
ML17137A01917 May 2017NEI 96-07 Appendix D Draft Revision 0 - Proposed Revisions - May 16, 2017 RedlineAnticipated operational occurrence
Post Accident Monitoring
Incorporated by reference
ML17137A02017 May 2017NEI 96-07 Appendix D Draft Revision 0 - Proposed Revisions - May 16, 2017Anticipated operational occurrence
Post Accident Monitoring
Incorporated by reference
ML17136A15216 May 2017Draft of NEI 06-11 Revision 2, Managing Personnel Fatigue at Nuclear Power Reactor Sites) for Discussion at NRC Public Meeting on 2017-June-15Safe Shutdown
Fitness for Duty
Nondestructive Examination
Fatigue Rule
Minimum staff
Scaffolding
ML17269A00116 May 2017NEI 96-07, Appendix_D with Hsi Edits from 9/19/2017 - 9/21/2017 MeetingPost Accident Monitoring
ML17121A4301 May 2017Industry Comments on the Draft Implementation PlanSignificance Determination Process
Power change
ML17044A0271 February 2017February 1, 2017, NEI / Industry Input to Modernization Plan No. 3 - Scope of 3rd Party Certification for Commercial Grade Digital EquipmentCommercial Grade Dedication
ML12200A37531 August 2012Comments on Nuclear Energy Institute 96-07, Appendix C: Guideline for Implementation of Change Control Processes for New Nuclear Power Plants Licensed Under Title 10 of the Code of Federal Regulations, Part 52, Revision 0CProbabilistic Risk Assessment
B.5.b Mitigating Strategies
Exemption Request
ML12080007220 March 2012Letter NEI 96-07 App C Rev. 0C NRC CommentsIncorporated by reference
Fire Protection Program
ML09289040030 September 2009NEI 06-12, B.5.b Phase 2 & 3 Submittal Guideline, Revision 3Ultimate heat sink
Severe Accident Management Guideline
B.5.b Mitigating Strategies
ML0724204476 August 2007White Paper Testing of Dynamic Soil Properties for Nuclear Power Plant COL ApplicationsEarthquake
ML05209003820 July 2005Attachment for the Summary of July 20, 2005 Meeting Between NRC and NEI, Cipims/Itaac Verification Demonstration Program, Phase I Report, Revision 0Boric Acid
ML15084A20928 January 1998Letter to Mr. Modeen, NEI NRC Staff Views on Clarifications Contain in Nei'S July 22, 1997 on Severe Accident ManagementAnticipated operational occurrence
Severe Accident Management Guideline
Earthquake
ML18263A0401 January 1996One Year Without a Disposal Site for Low-Level Radioactive Waste - Lessons Learned from the Barnwell Closure to 31 States 7/1/94 - 6/30/95 (Enclosure to Comments Submitted on DSI-4, DSI-5, DSI-7, DSI-9, DSI-12, DSI-13, DSI-14, DSI-21, DSI-G